| Q | CCA | Title |
---|
05000259/FIN-2016011-01 | 2016Q3 | | Failure to Identify and Evaluate All Targets Within the Zone of Influence of Ignition Sources |
05000259/FIN-2016011-02 | 2016Q3 | | Failure to Adequately Identify and Evaluate All Circuit Failures for NSCA Credited Equipment |
05000260/FIN-2016003-01 | 2016Q3 | | Failure to Ensure Adequate Piping Clearances After MOV Modification |
05000260/FIN-2016003-02 | 2016Q3 | H.3 | Failure to Implement Compensatory Roving Fire Watch |
05000259/FIN-2016003-03 | 2016Q3 | P.5 | Failure to Maintain The High Pressure Fire Protection System Piping |
05000259/FIN-2016003-04 | 2016Q3 | H.6 | Inadequate Prompt Determination of Operability for HPCI Steam Line Inboard Isolation Valve |
05000296/FIN-2016003-05 | 2016Q3 | P.1 | Alternate Depressurization Valve Inoperable Longer than the Allowed Outage Time |
05000296/FIN-2016003-06 | 2016Q3 | P.3 | Main Steam Relief Valves Inoperable Longer than Allowed Outage Time |
05000259/FIN-2016004-01 | 2016Q4 | H.8 | Inadequate Reassembly Procedure for HPCI Steam Line Inboard Isolation Valve Actuator |
05000296/FIN-2016004-02 | 2016Q4 | P.2 | Inadequate Prompt Determination of Operability for the HPCI System |
05000260/FIN-2017001-01 | 2017Q1 | | Failure to Take Corrective Actions to Preclude a Repeat Failure of a Containment Isolation Valve |
05000259/FIN-2017001-02 | 2017Q1 | H.4 | Unauthorized Entry into a High Radiation Area |
05000259/FIN-2017001-03 | 2017Q1 | H.12 | Failure to Perform Airborne Radioactivity Surveys |
05000259/FIN-2017001-04 | 2017Q1 | | Failure to Control the Issuance of Instructions and Drawings for Transformer Replacements |
05000259/FIN-2017406-01 | 2017Q1 | H.12 | Security |