05000275/FIN-2016007-05
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Evaluate the Voltage Effects of Limiting Design Basis Events on the 230 kV Offsite Power Circuit |
Description | The team identified a Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, which states, in part, The design control measures shall provide for verifying or checking the adequacy of design, such as by the performance of design reviews, by the use of alternate or simplified calculational methods, or by the performance of a suitable testing program. Specifically, prior to January 30, 2014, the licensee failed to verify the design of the 230 kV preferred offsite power source, such as by the performance of design reviews or use of alternate or simplified calculational methods, by assuming in calculation 359-DC, Determination of 230 kV Grid Capability Limits as DCPP Offsite Power Source, that the reactor trip and engineered safety features actuation system signals are coincident in time for all postulated design basis events. However, the plant is designed such that, during some events, the signals are separate in time and would result in a greater vital bus voltage depression than analyzed. In response to this finding, the licensee conducted a preliminary evaluation and concluded that the current transmission grid conditions were such that the calculation criteria would be met in the event of a design basis event involving non-coincident reactor trip and engineered safety features actuation system signals. This finding was entered into the licensee's corrective action program as Notification 50839137. The team determined the failure to evaluate the voltage effects of a limiting design basis event with non-coincident reactor trip and engineered safety features actuation system signals on the 230 kV offsite power circuit was a performance deficiency. The performance deficiency was more-than-minor, and therefore a finding, because it related to the design control attribute of the Mitigating Systems cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the failure to ensure adequate bus voltages as a result of a design basis event with non-coincident reactor trip and engineered safety features actuation system signals would result in a trip of the undervoltage relays and the loss of the preferred offsite power circuit. In accordance with Inspection Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated July 19, 2012, the finding screened as having very low safety significance (Green) because it was a design or qualification deficiency that did not represent a loss of operability or functionality; did not represent an actual loss of safety function of the system or train; did not result in the loss of one or more trains of non-technical specification equipment; and did not screen as potentially risk-significant due to seismic, flooding, or severe weather. This finding had a cross-cutting aspect in the area of human performance associated with design margins because the licensee failed to ensure that the organization operated and maintained equipment within design margins and that margins were carefully guarded and changed only through a systematic and rigorous process [H.6]. |
Site: | Diablo Canyon |
---|---|
Report | IR 05000275/2016007 Section 1R21 |
Date counted | Mar 31, 2016 (2016Q1) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.21 |
Inspectors (proximate) | C Steely D Loveless H Leake J Braisted J Zudans M Hayes N Okonkwo R Kopriva R Latta T Farnholtz |
Violation of: | 10 CFR 50 Appendix B Criterion III, Design Control |
CCA | H.6, Design Margins |
INPO aspect | WP.2 |
' | |