| Q | CCA | Title |
---|
05000272/FIN-2015403-01 | 2015Q4 | H.8 | Security |
05000311/FIN-2015004-01 | 2015Q4 | H.5 | Inadequate Auxiliary Building Barrier Controls |
05000272/FIN-2015004-02 | 2015Q4 | H.14 | Inadequate Maintenance Effectiveness of Control Room Ventilation Radiation Monitors |
05000272/FIN-2015004-03 | 2015Q4 | | Improper PM Deletion Resulted in Plant Shutdown Required by Technical Specifications |
05000272/FIN-2015004-04 | 2015Q4 | H.7 | Inadequate Post Maintenance Testing on OTDT Channels |
05000272/FIN-2016001-01 | 2016Q1 | P.3 | Failure to Correct Chiller Failures due to Gasket Leakage |
05000311/FIN-2016001-02 | 2016Q1 | H.3 | Inadequate Digital Feedwater Design Change Evaluation |
05000272/FIN-2016001-03 | 2016Q1 | H.4 | Untimely Identification and Correction of Unsatisfactory Control Room Ventilation Charcoal Testing |
05000311/FIN-2016002-02 | 2016Q2 | | Withdrawn - Failure to Follow Operability Determination Procedure for Unit 2 Baffle-Former Bolts |
05000272/FIN-2016002-01 | 2016Q2 | | Baffle-Former Bolts with Identified Anomalies |
05000311/FIN-2016002-03 | 2016Q2 | H.5 | Inadequate Work Order Planning Results in Main Generator AVR STV Relay Trip |
05000272/FIN-2016404-01 | 2016Q3 | H.1 | Security |
05000311/FIN-2016404-02 | 2016Q3 | H.2 | Security |
05000272/FIN-2016003-01 | 2016Q3 | | Misclassification of and Lack of Preventative Maintenance for SWC Valve 2GW75 and Relay S62-C1 |
05000311/FIN-2017009-01 | 2016Q3 | H.8 | Failure to Follow Troubleshooting Procedure for BIT Relief Valve Leakage |