| Q | CCA | Title |
---|
05000263/FIN-2015001-05 | 2015Q1 | H.12 | Two Emergency Diesels Inoperable Due to Human Error |
05000263/FIN-2015001-01 | 2015Q1 | P.1 | Failure to Identify High Pressure Coolant Injection (HPCI) Seismic Support Nonconformance |
05000263/FIN-2015001-04 | 2015Q1 | | Inadequate Evaluation of Operating Crew During Simulator Assessment |
05000263/FIN-2015001-03 | 2015Q1 | P.2 | Failure to Maintain a Standard Emergency Action Level Scheme for Flooding |
05000263/FIN-2015001-02 | 2015Q1 | P.2 | Failure to Maintain Fire Protection Program Procedures for Control of Portable Heater/Extension Cord Fire Hazards |
05000263/FIN-2015002-07 | 2015Q2 | | Operations with a Potential to Drain the Reactor Vessel (OPDRV) Without Secondary Containment Operable |
05000263/FIN-2015002-04 | 2015Q2 | H.14 | Failure to Fill the Reactor Cavity in Accordance with Refueling Preparation Procedure |
05000263/FIN-2015002-03 | 2015Q2 | H.7 | Failure to Maintain Secondary Containment and Standby Gas Treatment System Operable During OPDRV Activities |
05000263/FIN-2015002-02 | 2015Q2 | P.5 | Failure to Measure Interpass Temperature |
05000263/FIN-2015002-01 | 2015Q2 | P.1 | Failure to Maintain Portable Fire Extinguishers in Accordance with Fire Strategy |
05000263/FIN-2015002-06 | 2015Q2 | H.12 | Loss of Electrical Buses and Shutdown Cooling (SDC) Due to Inadequate Procedure Adherence |
05000263/FIN-2015002-05 | 2015Q2 | H.11 | Inadequate Clearance Order Results in Unplanned OPDRV |
05000263/FIN-2015003-03 | 2015Q3 | P.6 | Failure to Identify Safe Shutdown Equipment Impacts in Fire Strategy Procedures |
05000263/FIN-2015003-02 | 2015Q3 | H.5 | Failure to Perform High Radiation Area Portable Fire Extinguisher Surveillances |
05000263/FIN-2015007-01 | 2015Q3 | | Inadequate Quality Assurance Controls for Nitrogen Supply for the AN2 System |
05000263/FIN-2015003-01 | 2015Q3 | | Inadequate Evaluation of Refueling Floor Structural Steel Beams |
05000263/FIN-2015003-05 | 2015Q3 | | Failure to Provide Complete and Accurate Information in LER 05000263/2015-002-00 |
05000263/FIN-2015003-04 | 2015Q3 | | Drywell to Torus Vacuum Breaker Past Operability |
05000263/FIN-2015008-01 | 2015Q3 | | Failure to Perform Penetrant Tests in Accordance with Procedural Requirements |
05000263/FIN-2015008-02 | 2015Q3 | | Inaccurate and Incomplete Information Documented on VT/PT Report Forms |
05000263/FIN-2015008-03 | 2015Q3 | | Failure to Assess Contractor Control of Quality |
05000263/FIN-2015007-02 | 2015Q3 | | Failure to Review for Suitability of Application of Safety-Related Relays Installed Beyond Their Service Life |
05000263/FIN-2015201-01 | 2015Q4 | | Security |