05000255/FIN-2017003-03
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | 12 Diesel Generator Trip During Maintenance Resulting in Additional Unavailability of the 12 DG |
Description | A finding of very low safety significance and an associated NCV of Technical Specification (TS) 5.4.1, Procedures, was self -revealed on March 31, 2017, when the 12 Diesel Generator ( DG ) tripped during performance of monthly TS surveillance procedure MO 7A 2, Emergency Diesel Generator 1 2. Specifically, during conduct of the monthly surveillance procedure, restoration activities associated with maintenance of breaker 152 213, 1 2 DG to Bus 1D, were being performed. When maintenance personnel closed the trip cutouts for the Z -phase of the 1 2 DG differential overcurrent relay, an unbalanced current flow into the differential relay resulted in relay actuation. This actuation resulted in a trip of the output breaker and subsequently the 1 2 DG. The trip caused a delay in the TS surveillance activities and resulted in the extended unavailability and inoperability of the 1 2 DG. The licensee entered this issue into their corrective action program (CAP) as condition report (CR) CR PLP 2017 01291. Corrective actions included retesting the 1 2 DG and updating the work instructions associated with the differential overcurrent relays to include caution statements that opening or closing trip cutouts for the relays while the output breaker s from the DGs to the associated buses were closed could cause the differential relay s to actuate and trip the DG . The issue was determined to be more than minor in accordance with IMC 0612, Appendix B, Issue Screening, because it was associated with the Mitigating System s cornerstone attribute of Procedure Quality and adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The finding screened as having very low safety significance (Green) in accordance with IMC 0609, Appendix A, The Significance Determination Process for Findings At -Power, Exhibit 2, since the inspectors answered No to all screening questions. The finding had a cross- cutting aspect in the area of Human Performance, in the Work Management aspect , for the licensees failure to identify and manage risk commensurate to the work (H.5). |
Site: | Palisades ![]() |
---|---|
Report | IR 05000255/2017003 Section 4OA2 |
Date counted | Sep 30, 2017 (2017Q3) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | A Nguyen J Boettcher B Bartlett K Pusateri J Cassidy G Hansen V Myers R Walton |
Violation of: | Technical Specification - Procedures |
CCA | H.5, Work Management |
INPO aspect | WP.1 |
' | |