A finding and an associated violation of 10 CFR, Part 50, Appendix B, Criterion III, Design Control, was identified based upon the lack of adequate
tornado missile protection to the safety -related equipment listed above. The finding was determined to be less than red (i.e., high safety significance) based on a generic and bounding risk evaluation performed by the NRC in support of the resolution of tornado- generated missile non -compliances. The bounding risk evaluation is discussed in Enforcement Guidance Memorandum 15 002, Revision 1,
Enforcement Discretion for Tornado- Generated Missile Protection N on- Compliance, and can be found in
ADAMS Accession No.
ML16355A286. Because this finding and violation was identified during the discretionary period covered by Enforcement Guidance Memorandum 15002, Revision 1,
Enforcement Discretion for
Tornado Missile Protection Non-Compliance and because the licensee, prior to the expiration of the associated LCO, took initial compensatory measures that provided additional protection such that the likelihood of tonado missile effects were lessoned, followed by more comprehensive compensatory measures that w ere completed within approximately 60 days of issue discovery , and has final corrective actions planned, the NRC is exercising
enforcement discretion by not issuing an enforcement action, as discussed in Section 1R15.2 of this report.