Description | A self-revealing non-cited violation (NCV) of 10 CFR 50 Appendix B, Criterion XVI, Corrective Action, was identified when the licensee failed to implement corrective actions that addressed low stress high cycle fatigue of component cooling water (CCW) relief valve RV-4- 747B piping caused by flow induced vibration. As a result, CCW system flow induced vibration resulted in weld cracks and system pressure boundary leakage in November 2012. The licensee repaired the weld failures and installed a pipe support on the line to minimize flow induced vibration on the associated pipe in February 2013 during a scheduled refueling outage. The licensee documented this condition in their corrective action program as action request (AR) 1824939. The performance deficiency was more than minor because it was associated with the equipment performance attribute of the mitigating systems cornerstone and affected the cornerstone objective to ensure availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the failure to implement corrective actions to address CCW system flow induced vibration resulted in weld cracks and CCW system pressure boundary leakage in November 2012. The inspectors evaluated the finding under the mitigating systems cornerstone and used Inspection Manual Chapter (IMC) 0609, Appendix G, Attachment 1, Shutdown Operations Significance Determination Process Phase 1, Checklist 4, PWR Refueling Operation, dated May 25, 2004. The inspectors determined the finding was of very low safety significance (Green) because the finding did not require a quantitative assessment of risk significance since each item on the Checklist 4 was met during the time the condition existed and while the 4B residual heat removal (RHR) train was removed from service to repair the weld leak. The finding was associated with a crosscutting aspect in the corrective action program component of the problem identification and resolution area because the licensee did not complete engineering evaluations necessary to support modifications that would prevent CCW system RV-4-747B piping weld failures caused by flow induced vibration. |
Site: | Turkey Point |
---|---|
Report | IR 05000250/2013002 Section 4OA2 |
Date counted | Mar 31, 2013 (2013Q1) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | J Rivera R Kellner W Pursley M Riley W Loo T Hoeg M Barillas D Mas-Penaranda D Rich C Fletcher |
Violation of: | 10 CFR 50 Appendix B Criterion XVI |
CCA | P.2, Evaluation |
INPO aspect | PI.2 |
' | |