| Q | CCA | Title |
---|
05000247/FIN-2013403-01 | 2013Q3 | H.8 | Security |
05000247/FIN-2013403-02 | 2013Q3 | H.14 | Security |
05000247/FIN-2013403-03 | 2013Q3 | P.1 | Security |
05000247/FIN-2013012-01 | 2013Q4 | | Failure to Submit a Required 10 CFR 50.73 Report |
05000247/FIN-2013404-01 | 2013Q4 | | Security |
05000247/FIN-2013404-02 | 2013Q4 | | Security |
05000247/FIN-2013404-03 | 2013Q4 | H.2 | Security |
05000247/FIN-2013404-04 | 2013Q4 | P.1 | Security |
05000286/FIN-2014002-01 | 2014Q1 | P.2 | Inadequate Operability Evaluation of Spalled Concrete in the Service Water Pit Structu |
05000247/FIN-2014002-02 | 2014Q1 | H.5 | Incomplete Risk Assessment While Pressurizer Safety Valves Were Being Remov |
05000247/FIN-2014002-03 | 2014Q1 | H.6 | Spent Fuel Pool Fuel Assembly Interference Events |
05000247/FIN-2014002-04 | 2014Q1 | H.12 | Inappropriate Procedural Controls When Stopping RHR Without Assurance that RCS Loops Were Filled and Available for Natural Circulation Cooling |
05000286/FIN-2014007-01 | 2014Q2 | H.6 | Deficient Design Control Results in Non-Qualified Component Installed in Harsh Environment for Unit 3, BFD-FCV-406B Actuator |
05000247/FIN-2014404-01 | 2014Q2 | | Security |