05000247/FIN-2012007-02 | 2012Q4 | | lnadequate Turbine Building HELB evaluation for effect on Safety Related Equipment |
05000247/FIN-2012007-03 | 2012Q4 | | Inadequate Verification of Design Analyses for Recirculation Pump NPSH |
05000247/FIN-2012201-01 | 2012Q4 | H.5 | Security |
05000247/FIN-2012404-01 | 2012Q4 | P.5 | Security |
05000247/FIN-2012005-01 | 2012Q4 | P.2 | Inadequate Corrective Actions regarding operational controls of the steam generator blowdown valve radiation bypass switch |
05000247/FIN-2012007-01 | 2012Q4 | | Inadequate Design Verification that Bus 6A supply breaker amptector would not inadvertently trip and lockout bus during degraded grid accident Sl load current |
05000247/FIN-2013002-01 | 2013Q1 | H.7 | Inadequate Maintenance Procedure Results in a Reactor Trip |
05000247/FIN-2013007-01 | 2013Q1 | | Failure to implement an appropriate procedure to ensure that one of two strategies provided adequate cooling water flow to the SGs per 50.54(hh)(2) |
05000247/FIN-2013003-01 | 2013Q2 | H.5 | Failure to Assess and Manage Risk Associated with Reactor Testing Below Normal Operating Conditions |
05000247/FIN-2013003-02 | 2013Q2 | | Failure to Identify and Correct a Condition Adverse to Quality Affecting Pressurizer Safety Valves |
05000247/FIN-2013003-03 | 2013Q2 | H.7 | Failure to Maintain Appropriate Procedures for Response to Safety Injection Actuation at Low Temperature |
05000247/FIN-2013403-01 | 2013Q3 | H.8 | Security |
05000247/FIN-2013403-02 | 2013Q3 | H.14 | Security |