Title | Failure to implement an appropriate procedure to ensure that one of two strategies provided adequate cooling water flow to the SGs per 50.54(hh)(2) |
Description | The team identified a non-cited violation (NCV) of Unit 2 Operating License Condition 2.N, Unit 3 Operating License Condition 2.AC, and 10 CFR 50.54(hh)(2) for Entergys failure to implement guidance for one of the two strategies intended to maintain or restore core cooling by supplying water to the steam generators. Entergys failure to provide adequate procedural guidance to maintain or restore core cooling is considered a performance deficiency. This finding is more than minor because it is associated with the equipment performance attribute of the Mitigating Systems Cornerstone and affects the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent core damage. In accordance Inspection Manual Chapter 0609, Appendix L, B.5.b Significance Determination Process, the team concluded that this finding is of very low safety significance (Green). The team judged that as-found, one of the steam generator fill strategies was unavailable, because on initial implementation, given the assumed severity of plant damage and the procedural inadequacies, the required flow rate to the steam generators would not have been provided. The team determined that this strategy was recoverable, because the equipment would not have been damaged, and the operator likely would request and receive additional direction from emergency management personnel when they became available, such that the required flow rate could be achieved. The team determined that no cross-cutting aspect was applicable to this performance deficiency because this finding was not indicative of current licensee performance. |
Site: | Indian Point |
---|---|
Report | IR 05000247/2013007 Section 1R05 |
Date counted | Mar 31, 2013 (2013Q1) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.05 |
Inspectors (proximate) | S Galbreath W Schmidt J Rady J Rogge K Young R Fuhrmeister |
Violation of: | 10 CFR 50.54 License Condition |
INPO aspect | |
' | |