| Q | CCA | Title |
---|
05000286/FIN-2012002-01 | 2012Q1 | | Failed to Submit an LER for a Single Cause of Two Auxiliary Boiler Feedwater Trains Inoperable |
05000247/FIN-2013011-02 | 2012Q1 | | Failing to initiate a condition report or otherwise report the condition such that a Licensee Event Report could be written |
05000247/FIN-2013011-01 | 2012Q1 | | Operating IP Units 2 and 3 in violation of site TS requirements after the Chemistry manager identified that the fuel oil in the 22 FOST and the RFOST exceeded limits |
05000286/FIN-2012002-04 | 2012Q1 | P.2(b) | Inadequate Corrective Actions Associated with Degraded Motor Cutoff Switches on 480 Volt Breakers |
05000286/FIN-2012002-03 | 2012Q1 | | Failed to Update Operating Procedures and Licensing Basis Documents with Nitrogen Backup System Design and Support Function for AFW System Operability |
05000247/FIN-2012002-01 | 2012Q1 | P.1(b) | Inadequate Corrective Actions for Clogged Drains in teh 480 Volt Switchgear Room |
05000247/FIN-2012002-02 | 2012Q1 | | Abnormal Operating Procedure Not Followed for Annuciator Alarm Deficiency |
05000286/FIN-2012002-02 | 2012Q1 | H.7 | Inadequate Procedure and Instructions for Placing Pressure Regulator in Service |
05000247/FIN-2012003-02 | 2012Q2 | | An LER for an Inoperable Main Steam Safety Valve Was Not Submitted When Required |
05000286/FIN-2012003-02 | 2012Q2 | P.2 | Inadequate Battery Voltage Drop Calculation |
05000286/FIN-2012003-01 | 2012Q2 | | Inadequate Procedures for Testing 33 Station Battery |
05000247/FIN-2012003-01 | 2012Q2 | H.8 | Foreign Materials Control Procedure Not Followed Resulting in Degraded 21 Reactor Coolant Pump Seal Package |
05000247/FIN-2012004-01 | 2012Q3 | H.14 | Inadequate Operability Evaluation of Non-conforming Safety Related Batteries |
05000247/FIN-2012004-02 | 2012Q3 | H.7 | Inadequate Test Control of Safety Related Batteries |
05000247/FIN-2012004-04 | 2012Q3 | H.13 | Inadequate Operability Evaluation of 22 Static Inverter with a Degraded Frequency Meter |
05000247/FIN-2012009-01 | 2012Q3 | | Failure to Protect Safe Shutdown Equipment from the Effects of Fire |
05000247/FIN-2012009-02 | 2012Q3 | H.8 | Violation of Transient Combustible Control Program |
05000247/FIN-2012403-02 | 2012Q3 | H.5 | Security |
05000247/FIN-2012403-01 | 2012Q3 | H.9 | Security |
05000286/FIN-2012008-01 | 2012Q3 | | Failure to Protect Safe Shutdown Equipment from the Effects of Fire |
05000247/FIN-2012004-03 | 2012Q3 | | Inadequate Procedure Guidance to Maintain 22 ABFP Governor Oiler Level |
05000247/FIN-2012005-01 | 2012Q4 | P.2 | Inadequate Corrective Actions regarding operational controls of the steam generator blowdown valve radiation bypass switch |
05000247/FIN-2012007-01 | 2012Q4 | | Inadequate Design Verification that Bus 6A supply breaker amptector would not inadvertently trip and lockout bus during degraded grid accident Sl load current |
05000247/FIN-2012404-01 | 2012Q4 | P.5 | Security |
05000247/FIN-2012201-01 | 2012Q4 | H.5 | Security |
05000247/FIN-2012007-03 | 2012Q4 | | Inadequate Verification of Design Analyses for Recirculation Pump NPSH |
05000247/FIN-2012007-02 | 2012Q4 | | lnadequate Turbine Building HELB evaluation for effect on Safety Related Equipment |