ML23334A182 | 30 November 2023 | Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary November 2021 Through October 2023 |
ML18320A034 | 16 November 2018 | Post Shutdown Decommissioning Activities Report |
IR 05000293/2017002 | 14 August 2017 | Integrated Inspection Report 05000293/2017002 |
ML16187A325 | 24 June 2016 | Request for Extension to Comply with NRC Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions |
IR 05000293/2015002 | 11 August 2015 | IR 05000293-15-002; 04/01/2015 - 06/30/2015; Pilgrim Nuclear Power Station (Pilgrim); Equipment Alignment, Operability Determinations and Functionality Assessments, and Follow-Up of Events and Notices of Enforcement Discretion |
ML15043A754 | 24 March 2015 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 1 of Order EA-13-109 (Severe Accident Capable Hardened Vents) |
ML14188B731 | 30 June 2014 | Phase 1 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) |
IR 05000293/2013005 | 10 February 2014 | IR 05000293/2013005 and ISFSI Report 07201044/2013001; 10/1/2013 - 12/31/2013; Pilgrim Nuclear Power Station (Pnps); Maintenance Effectiveness and Maintaining Emergency Preparedness |
IR 05000293/2013003 | 8 August 2013 | IR 05000293-13-003; 04/01/2013 - 06/30/2013; Pilgrim Nuclear Power Station; Refueling and Other Outage Activities |
ML13232A129 | 17 June 2013 | PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment J, Page J78 of J134 Through End |
ML13232A131 | 17 June 2013 | PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C1 of C413 Through Page C84 of C413 |
ML13232A134 | 17 June 2013 | PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C174 of C413 Through Page C250 of C413 |
ML13232A138 | 17 June 2013 | PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment D, Page D1 of D127 Through Page D73 of D127 |
ML13232A141 | 17 June 2013 | PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment I, Page I1 of I9 Through Attachment J, Page J77 of J134 |
ML13232A140 | 17 June 2013 | PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment D, Page D74 of D127 Through Attachment H, Page H12 of H12 |
IR 05000293/2013002 | 8 May 2013 | IR 05000293-13-002, 01/01/2013 - 03/31/2013, Pilgrim Nuclear Power Station, Routine Integrated Inspection Report |
ML13063A096 | 28 February 2013 | Overall Integrated Plan for Reliable Hardened Containment Vents |
IR 05000293/2012005 | 31 January 2013 | IR 05000293-12-005, on 10/01/2012 - 12/31/2012; Pilgrim Nuclear Power Station - NRC Integrated Inspection Report; Operability Determinations and Functionality Assessments, Plant Modifications, and Problem Identification and Resolution |
ML12342A386 | 6 December 2012 | Fifth Ten-Year Inservice Testing Program and Request for Approval of IST Relief Requests, PR-03 and PR-05 |
ML12033A229 | 2 February 2012 | IR 05000293-11-005, on 10/01/2011 - 12/31/2011, Pilgrim Nuclear Power Station, Licensed Operator Requalification Program |
ML11187A277 | 10 August 2011 | Attachment 1 to Enclosure - Pilgrim Scram Report 2000 - Present |
IR 05000293/2011008 | 15 April 2011 | IR 05000293-11-008; on 02/14/2011 - 03/04/2011; Pilgrim Nuclear Power Station; Biennial Baseline Inspection of Problem Identification and Resolution. the Inspectors Identified One Finding in the Area of Problem Identification.. |
IR 05000293/2009003 | 20 July 2009 | IR 05000293-09-003; 04/01/2009 - 06/30/2009; Pilgrim Nuclear Power Station; Refueling and Other Outage Activities |
IR 05000293/2009002 | 6 May 2009 | IR 05000293-09-002; 01/01/2009 - 03/31/2009; Pilgrim Nuclear Power Station; Maintenance Effectiveness and Operability Evaluations |
ML081820056 | 15 September 2008 | Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems, Proposed Alternative Course of Action |
ML082170672 | 16 July 2008 | Report, E11-5690-003, Preliminary Decommissioning Cost Analysis for the Pilgrim Nuclear Power Station. |
ML081350609 | 7 May 2008 | Pilgrim Nuclear Power Station Three-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. |
ML070780135 | 21 September 2006 | CR-PNP-2006-03497, During the Nrc'S Walkdown of the Torus Compartment as Part of License Renewal Review, the Inspectors Noted the Presence of Combustible Material. |
ML052070351 | 26 July 2005 | IR 05000293-05-003; on 04/01-06/30/2005; for Pilgrim Nuclear Power Station, Activities Related to Safety and Compliance with the Nrc'S Rules and Regulations and with the Conditions of the License |
ML023500381 | 6 December 2002 | Fourth Ten-Year Inservice Testing (IST) Program & Request for Approval of IST Relief Requests |
ML20209G233 | 9 July 1999 | Insp Rept 50-293/99-03 on 990419-0609.Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Operations,Maint,Engineering & Plant Support.Response to Main Transformer Fire by Fire Brigade Members Was Good |
IR 05000293/1999001 | 20 April 1999 | Insp Rept 50-293/99-01 on 990125-0307.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support.Also Included Routine Core Insp of Security Program During Period of 990301-05 |
IR 05000293/1998010 | 22 December 1998 | Insp Rept 50-293/98-10 on 981020-1208.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support,Including Implementation of Fire Protection Program |
NRC Generic Letter 1998-04 | 14 July 1998 | NRC Generic Letter 1998-004: Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss-of-coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Material i |
ML20211N687 | 16 September 1997 | Rev 9 to Procedure 8.I.1.1, Inservice Pump & Valve Testing Program |
ML20141K786 | 22 May 1997 | Insp Rept 50-293/97-02 on 970303-0428.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support |
ML20137E567 | 18 March 1997 | Insp Rept 50-293/97-01 on 970112-0302.Violations Noted.Major Areas Inspected:Operations,Engineering & Plant Support |
IR 05000293/1996008 | 18 December 1996 | Insp Rept 50-293/96-08 on 960924-1122.Violation Noted.Major Areas Inspected:Engineering,Maint,Plant Support,Radioactive Effluent Controls Program,Radiological Environmental Monitoring & Meteorological Monitoring.Meeting Slides Encl |
BECO-LTR-95-015, Requests Relief from ASME Code,Section Xi,Articles IWC-2500 & IWF-2500 Insp Requirements for Class 2 Rhr/Fpc Intertie Piping Welds & Supports | 9 February 1995 | Requests Relief from ASME Code,Section Xi,Articles IWC-2500 & IWF-2500 Insp Requirements for Class 2 Rhr/Fpc Intertie Piping Welds & Supports |
IR 05000293/1993099 | 16 November 1994 | SALP Rept 50-293/93-99 for Period 930314-941008 |
ML20044E739 | 23 June 1993 | Technical Evaluation Rept Pump & Valve Inservice Testing Program Pilgrim Nuclear Power Station. |
IR 05000293/1992023 | 29 December 1992 | Safety Insp Rept 50-293/92-23 on 921020-1123.No Violations Noted.Major Areas Inspected:Plant Operations,Radiological Controls,Maint & Surveillance,Emergency Preparedness, Security & Safety Assessment & Quality Verification |
ML20127N271 | 24 November 1992 | Rev 4 to Pilgrim Nuclear Power Station Procedure 8.I.1.1, Inservice Pump & Valve Testing Program |
Information Notice 1992-75, Unplanned Intakes of Airborne Radioactive Material by Individuals at Nuclear Power Plants | 12 November 1992 | Unplanned Intakes of Airborne Radioactive Material by Individuals at Nuclear Power Plants |
IR 05000293/1988037 | 30 March 1989 | Insp Rept 50-293/88-37 on 881227-890205.Violation Noted Re Failure to Control Locked High Radiation Area Access.Major Areas Inspected:Licensee Mgt Controls,Conduct of Operations & Startup Testing During Power Ascension Program |
ML20206L458 | 21 November 1988 | Insp Rept 50-293/88-30 on 881027-1118.No Violations Noted. Major Areas Inspected:Licensee Followup Activities Re Loose Anchor Bolts in Pipe Support Base Plate,Safety Significance of Subj Discrepancy & Response to Bulletins 79-002 & 79-014 |
ML20155D951 | 6 October 1988 | Notice of Issuance of Interim Director'S Decision DD-88-17 in Response to 10CFR2.206 Petition.Portion of Petition Re Numerous Deficiencies in Licensee Mgt Denied.Portion Re Emergency Preparedness to Be Addressed in Final Decision |
ML20155D063 | 6 October 1988 | Notice of Issuance of Final Director'S Decision Re Request to Have Plant Remain Shut or License Suspended |
ML20155C014 | 28 September 1988 | Rev 3 to Appendices to Restart Plan |
ML20154C279 | 7 September 1988 | Integrated Assessment Team Insp Rept 50-293/88-21 on 880808- -24.No Violations Noted.Major Areas Inspected:Degree of Readiness of Licensee Mgt Controls,Programs & Personnel to Support Safe Restart & Plant Operation |