 Issue dateTitle
ML23334A18230 November 2023Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary November 2021 Through October 2023
ML18320A03416 November 2018Post Shutdown Decommissioning Activities Report
IR 05000293/201700214 August 2017Integrated Inspection Report 05000293/2017002
ML16187A32524 June 2016Request for Extension to Comply with NRC Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions
IR 05000293/201500211 August 2015IR 05000293-15-002; 04/01/2015 - 06/30/2015; Pilgrim Nuclear Power Station (Pilgrim); Equipment Alignment, Operability Determinations and Functionality Assessments, and Follow-Up of Events and Notices of Enforcement Discretion
ML15043A75424 March 2015Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 1 of Order EA-13-109 (Severe Accident Capable Hardened Vents)
ML14188B73130 June 2014Phase 1 Overall Integrated Plan in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)
IR 05000293/201300510 February 2014IR 05000293/2013005 and ISFSI Report 07201044/2013001; 10/1/2013 - 12/31/2013; Pilgrim Nuclear Power Station (Pnps); Maintenance Effectiveness and Maintaining Emergency Preparedness
IR 05000293/20130038 August 2013IR 05000293-13-003; 04/01/2013 - 06/30/2013; Pilgrim Nuclear Power Station; Refueling and Other Outage Activities
ML13232A12917 June 2013PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment J, Page J78 of J134 Through End
ML13232A13117 June 2013PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C1 of C413 Through Page C84 of C413
ML13232A13417 June 2013PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C174 of C413 Through Page C250 of C413
ML13232A13817 June 2013PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment D, Page D1 of D127 Through Page D73 of D127
ML13232A14117 June 2013PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment I, Page I1 of I9 Through Attachment J, Page J77 of J134
ML13232A14017 June 2013PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment D, Page D74 of D127 Through Attachment H, Page H12 of H12
IR 05000293/20130028 May 2013IR 05000293-13-002, 01/01/2013 - 03/31/2013, Pilgrim Nuclear Power Station, Routine Integrated Inspection Report
ML13063A09628 February 2013Overall Integrated Plan for Reliable Hardened Containment Vents
IR 05000293/201200531 January 2013IR 05000293-12-005, on 10/01/2012 - 12/31/2012; Pilgrim Nuclear Power Station - NRC Integrated Inspection Report; Operability Determinations and Functionality Assessments, Plant Modifications, and Problem Identification and Resolution
ML12342A3866 December 2012Fifth Ten-Year Inservice Testing Program and Request for Approval of IST Relief Requests, PR-03 and PR-05
ML12033A2292 February 2012IR 05000293-11-005, on 10/01/2011 - 12/31/2011, Pilgrim Nuclear Power Station, Licensed Operator Requalification Program
ML11187A27710 August 2011Attachment 1 to Enclosure - Pilgrim Scram Report 2000 - Present
IR 05000293/201100815 April 2011IR 05000293-11-008; on 02/14/2011 - 03/04/2011; Pilgrim Nuclear Power Station; Biennial Baseline Inspection of Problem Identification and Resolution. the Inspectors Identified One Finding in the Area of Problem Identification..
IR 05000293/200900320 July 2009IR 05000293-09-003; 04/01/2009 - 06/30/2009; Pilgrim Nuclear Power Station; Refueling and Other Outage Activities
IR 05000293/20090026 May 2009IR 05000293-09-002; 01/01/2009 - 03/31/2009; Pilgrim Nuclear Power Station; Maintenance Effectiveness and Operability Evaluations
ML08182005615 September 2008Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems, Proposed Alternative Course of Action
ML08217067216 July 2008Report, E11-5690-003, Preliminary Decommissioning Cost Analysis for the Pilgrim Nuclear Power Station.
ML0813506097 May 2008Pilgrim Nuclear Power Station Three-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.
ML07078013521 September 2006CR-PNP-2006-03497, During the Nrc'S Walkdown of the Torus Compartment as Part of License Renewal Review, the Inspectors Noted the Presence of Combustible Material.
ML05207035126 July 2005IR 05000293-05-003; on 04/01-06/30/2005; for Pilgrim Nuclear Power Station, Activities Related to Safety and Compliance with the Nrc'S Rules and Regulations and with the Conditions of the License
ML0235003816 December 2002Fourth Ten-Year Inservice Testing (IST) Program & Request for Approval of IST Relief Requests
ML20209G2339 July 1999Insp Rept 50-293/99-03 on 990419-0609.Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Operations,Maint,Engineering & Plant Support.Response to Main Transformer Fire by Fire Brigade Members Was Good
IR 05000293/199900120 April 1999Insp Rept 50-293/99-01 on 990125-0307.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support.Also Included Routine Core Insp of Security Program During Period of 990301-05
IR 05000293/199801022 December 1998Insp Rept 50-293/98-10 on 981020-1208.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support,Including Implementation of Fire Protection Program
NRC Generic Letter 1998-0414 July 1998NRC Generic Letter 1998-004: Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss-of-coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Material i
ML20211N68716 September 1997Rev 9 to Procedure 8.I.1.1, Inservice Pump & Valve Testing Program
ML20141K78622 May 1997Insp Rept 50-293/97-02 on 970303-0428.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support
ML20137E56718 March 1997Insp Rept 50-293/97-01 on 970112-0302.Violations Noted.Major Areas Inspected:Operations,Engineering & Plant Support
IR 05000293/199600818 December 1996Insp Rept 50-293/96-08 on 960924-1122.Violation Noted.Major Areas Inspected:Engineering,Maint,Plant Support,Radioactive Effluent Controls Program,Radiological Environmental Monitoring & Meteorological Monitoring.Meeting Slides Encl
BECO-LTR-95-015, Requests Relief from ASME Code,Section Xi,Articles IWC-2500 & IWF-2500 Insp Requirements for Class 2 Rhr/Fpc Intertie Piping Welds & Supports9 February 1995Requests Relief from ASME Code,Section Xi,Articles IWC-2500 & IWF-2500 Insp Requirements for Class 2 Rhr/Fpc Intertie Piping Welds & Supports
IR 05000293/199309916 November 1994SALP Rept 50-293/93-99 for Period 930314-941008
ML20044E73923 June 1993Technical Evaluation Rept Pump & Valve Inservice Testing Program Pilgrim Nuclear Power Station.
IR 05000293/199202329 December 1992Safety Insp Rept 50-293/92-23 on 921020-1123.No Violations Noted.Major Areas Inspected:Plant Operations,Radiological Controls,Maint & Surveillance,Emergency Preparedness, Security & Safety Assessment & Quality Verification
ML20127N27124 November 1992Rev 4 to Pilgrim Nuclear Power Station Procedure 8.I.1.1, Inservice Pump & Valve Testing Program
Information Notice 1992-75, Unplanned Intakes of Airborne Radioactive Material by Individuals at Nuclear Power Plants12 November 1992Unplanned Intakes of Airborne Radioactive Material by Individuals at Nuclear Power Plants
IR 05000293/198803730 March 1989Insp Rept 50-293/88-37 on 881227-890205.Violation Noted Re Failure to Control Locked High Radiation Area Access.Major Areas Inspected:Licensee Mgt Controls,Conduct of Operations & Startup Testing During Power Ascension Program
ML20206L45821 November 1988Insp Rept 50-293/88-30 on 881027-1118.No Violations Noted. Major Areas Inspected:Licensee Followup Activities Re Loose Anchor Bolts in Pipe Support Base Plate,Safety Significance of Subj Discrepancy & Response to Bulletins 79-002 & 79-014
ML20155D9516 October 1988Notice of Issuance of Interim Director'S Decision DD-88-17 in Response to 10CFR2.206 Petition.Portion of Petition Re Numerous Deficiencies in Licensee Mgt Denied.Portion Re Emergency Preparedness to Be Addressed in Final Decision
ML20155D0636 October 1988Notice of Issuance of Final Director'S Decision Re Request to Have Plant Remain Shut or License Suspended
ML20155C01428 September 1988Rev 3 to Appendices to Restart Plan
ML20154C2797 September 1988Integrated Assessment Team Insp Rept 50-293/88-21 on 880808- -24.No Violations Noted.Major Areas Inspected:Degree of Readiness of Licensee Mgt Controls,Programs & Personnel to Support Safe Restart & Plant Operation