Semantic search

Jump to navigation Jump to search
 Issue dateTitle
RS-22-110, Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request.20 September 2022Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request.
ML22021B6601 February 2022Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000)-Enclosure 1
ML21277A19316 November 2021Enclosure 2, Draft Conforming License Amendments
JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position27 September 2021Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position
ML20339A18220 November 2020Fire Protection Program, Revision 18, Volumes I - III
ML20134H9408 July 2020Issuance of Amendments Revising the High Radiation Area Administrative Controls
ML19162A1756 June 201910 CFR 50.54(q)(5) Procedure Change Summary Analysis
ML19150A50610 May 2019R.E Ginna Nuclear Power Plant Revision 17 to Fire Protection Program
ML19045A28215 February 2019R. E. Ginna Nuclear Power Plant - License Amendment Request (LAR) to Revise Technical Specification (TS) 5.5.15, Containment Leakage Rate Testing Program, for Permanent Extension of Type a Leak Rate Test Frequencies
ML20311A5506 November 20172017 Q1-Q4 ROP Inspection Findings
ML16207A11314 July 2016Radiological Emergency Plan Annex Revisions
ML15271A10123 November 2015Issuance of Amendment Regarding Transition to a Risk Informed, Performance-Based Fire Protection Program in Accordance with Title 10 of the Code of Federal Regulations Section 50.48(c)
IR 05000244/201400324 July 2014IR 05000244-14-003; 04/01/2014 - 06/30/2014; R.E. Ginna Nuclear Power Plant, LLC (Ginna); Refueling and Other Outage Activities
ML13353A41717 December 2013Response to Request for Additional Information License Amendment to Transition to NFPA 805
IR 05000244/201300412 November 2013IR 05000244-13-004; 07/01/2013 - 09/30/2013; R.E. Ginna Nuclear Power Plant, LLC (Ginna); Maintenance Risk Assessments and Emergent Work Control; Follow-Up of Events and Notices of Enforcement Discretion
IR 05000244/201300226 April 2013IR 05000244-13-002; 01/01/2013 - 03/31/2013; R.E. Ginna Nuclear Power Plant, LLC (Ginna); Operability Determinations and Functionality Assessments
IR 05000244/201200511 February 2013IR 05000244-12-005; 10/01/2012 - 12/31/2012; R.E. Ginna Nuclear Power Plant, LLC (Ginna); Operability Determinations and Functionality Assessments; Refueling and Other Outage Activities; and Follow-Up of Events and Notices of Enforcement Di
ML12362A45221 December 2012Supplemental Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3. Seismic, Attachment (3) Area Walk-By Checklists Through End
ML12332A10718 October 2012Final Written Examination with Answer Key (401-5 Format) (Folder 2)
IR 05000244/200900413 November 2009IR 05000244-09-004 on 07/01/09 - 09/30/09 for R.E. Ginna Station
IR 05000244/200800527 January 2009IR 05000244-08-005, on 12/27/2009, Ginna Nuclear Power Plant - Other Activities
IR 05000244/200800230 April 2008IR 05000244-08-002, on 1/1/2008 - 03/31/2008, R.E. Ginna Nuclear Power Plant (Ginna), Refueling and Other Outage Activities, Identification and Resolution of Problems
ML0920907894 January 2008Fourth Interval Inservice Inspection (ISI) Program, Rev. 7
IR 05000244/200600615 October 2006IR 05000244-06-006, on 08/14-31/2006, R.E. Ginna Nuclear Power Plant, LLC
IR 05000244/20060025 May 2006IR 05000244-06-002 on 01/01/2003 - 03/31/2006 for Constellation Energy; R.E. Ginna Nuclear Power Plant; Fire Protection, Licensed Operator Requalification Program, and Program Identification and Resolution, Cross-Cutting Areas
ML0603802569 February 2006Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors
ML0532604801 November 2005Enclosure H, Pages 45-50 of the Ginna Station Emergency Plan, Appendix G, Analysis of Evacuation Travel Times, of the Ginna Station Emergency Plan, and Ginna Station Discretionary Actions for Emergency Conditions, Effective April 28, 2005
IR 05000244/20050024 May 2005IR 05000244-05-002; on 01/01/2005 - 03/31/2005; R. E. Ginna Nuclear Power Plant
IR 05000244/200400223 April 2004IR 05000244-04-002, on 01/01/2004 - 03/31/2004; R. E. Ginna Nuclear Power Plant; Operator Performance During Non Routine Events, Post-Maintenance Testing
IR 05000244/20030066 November 2003IR 05000244-03-006, on 06/29/2003 - 09/27/2003; R. E. Ginna Nuclear Power Plant; Maintenance Risk Assessment and Emergent Work, Personnel Performance During Non-routine Plant Evolutions, Post Maintenance Testing, Other Activities
ML04055027130 July 2003to Specification ME-326, Control Room Emergency Air Treatment System (Creats) and Emergency Cooling System Design, Fabrication, & Installation Specification.
ML03064036625 February 2003Revision to Emergency Plan Implementing Procedure, Procedure Index - Attachment 3, Nuclear Safety Audit Review Board Members
NRC Generic Letter 1998-0414 July 1998NRC Generic Letter 1998-004: Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss-of-coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Material i
ML17309A6137 February 1997Forwards Response to NRC Request for Info Re Adequacy & Availability of Design Bases Info,Per 10CFR50.54(f)
ML17264A77231 July 19961996 Rept of Facility Changes,Tests & Experiments Conducted Without Prior Approval for Aug 1995-Jul 1996,Under Provisions of 10CFR50.59.
ML17264A30231 July 19951995 Rept of Facility Change,Tests & Experiments Conducted Without Prior Approval for Aug 1995 - Jul 1995 Under Provisions of 10CFR50.59.
ML17263A83126 September 1994Draft Rev C to Design Criteria Ginna Station Containment Structural Mods Wbs 4.
ML17263A75631 August 1994Rev 20 to QA Program for Operation.
ML17263A65031 May 1994Rev 20 to QA Program for Station Operation.
ML17309A53531 December 1993Rev 19 to QA Program for Station Operation.
ML17263A35131 December 1992Rev 18 to QA Program for Station Operation.
Information Notice 1992-75, Unplanned Intakes of Airborne Radioactive Material by Individuals at Nuclear Power Plants12 November 1992Unplanned Intakes of Airborne Radioactive Material by Individuals at Nuclear Power Plants
ML17262A63428 October 1991Provides Notification Re Intention to Substitute Inservice Insp Exams of Two Class 2 Welds from Steam Generator B to Identical Welds on Steam Generator A.Two SG ASME Class 2 Welds Scheduled for Exam Identified on Encl Figure 1
ML17309A45231 July 1990Annual Rept of Facility Changes,Tests & Experiments Conducted W/O Prior Commission Approval, Covering Aug 1989 to Jul 1990. W/901217 Ltr
ML17309A43431 July 19891989 Rept of Facility Changes,Tests & Experiments Conducted W/O Prior Approval for Aug 1988 - Jul 1989. W/891219 Ltr
ML17261A57729 July 1987Responds to Violations Noted in Insp Rept 50-244/87-09. Corrective Actions:New Temporary Mod Authorizations Have Been Accompanied W/Specifically Worded Determinations as Required by Administrative Procedure A-1406.1
ML20212M19016 January 1987Safety Insp Rept 50-244/86-22 on 861215-19.No Violations or Deviations Noted.Major Areas Inspected:Licensee Response to Previous Insp Findings & Effectiveness of Licensee Correction Action Program
IR 05000244/198602112 January 1987Insp Rept 50-244/86-21 on 861109-870103.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Findings, Review of Plant Operations,Operational Safety Verification, Surveillance Testing & Plant Maint
Information Notice 1985-43, Radiography Events at Power Reactors30 May 1985Radiography Events at Power Reactors
ML17256A6946 May 1983Re Ginna Nuclear Power Plant 1982 Evaluation, Conducted During Wks of 820531 & 0607