Issue date | Title | |
---|---|---|
RS-22-110, Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request. | 20 September 2022 | Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request. |
ML22021B660 | 1 February 2022 | Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000)-Enclosure 1 |
ML21277A193 | 16 November 2021 | Enclosure 2, Draft Conforming License Amendments |
JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | 27 September 2021 | Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position |
ML20339A182 | 20 November 2020 | Fire Protection Program, Revision 18, Volumes I - III |
ML20134H940 | 8 July 2020 | Issuance of Amendments Revising the High Radiation Area Administrative Controls |
ML19162A175 | 6 June 2019 | 10 CFR 50.54(q)(5) Procedure Change Summary Analysis |
ML19150A506 | 10 May 2019 | R.E Ginna Nuclear Power Plant Revision 17 to Fire Protection Program |
ML19045A282 | 15 February 2019 | R. E. Ginna Nuclear Power Plant - License Amendment Request (LAR) to Revise Technical Specification (TS) 5.5.15, Containment Leakage Rate Testing Program, for Permanent Extension of Type a Leak Rate Test Frequencies |
ML20311A550 | 6 November 2017 | 2017 Q1-Q4 ROP Inspection Findings |
ML16207A113 | 14 July 2016 | Radiological Emergency Plan Annex Revisions |
ML15271A101 | 23 November 2015 | Issuance of Amendment Regarding Transition to a Risk Informed, Performance-Based Fire Protection Program in Accordance with Title 10 of the Code of Federal Regulations Section 50.48(c) |
IR 05000244/2014003 | 24 July 2014 | IR 05000244-14-003; 04/01/2014 - 06/30/2014; R.E. Ginna Nuclear Power Plant, LLC (Ginna); Refueling and Other Outage Activities |
ML13353A417 | 17 December 2013 | Response to Request for Additional Information License Amendment to Transition to NFPA 805 |
IR 05000244/2013004 | 12 November 2013 | IR 05000244-13-004; 07/01/2013 - 09/30/2013; R.E. Ginna Nuclear Power Plant, LLC (Ginna); Maintenance Risk Assessments and Emergent Work Control; Follow-Up of Events and Notices of Enforcement Discretion |
IR 05000244/2013002 | 26 April 2013 | IR 05000244-13-002; 01/01/2013 - 03/31/2013; R.E. Ginna Nuclear Power Plant, LLC (Ginna); Operability Determinations and Functionality Assessments |
IR 05000244/2012005 | 11 February 2013 | IR 05000244-12-005; 10/01/2012 - 12/31/2012; R.E. Ginna Nuclear Power Plant, LLC (Ginna); Operability Determinations and Functionality Assessments; Refueling and Other Outage Activities; and Follow-Up of Events and Notices of Enforcement Di |
ML12362A452 | 21 December 2012 | Supplemental Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3. Seismic, Attachment (3) Area Walk-By Checklists Through End |
ML12332A107 | 18 October 2012 | Final Written Examination with Answer Key (401-5 Format) (Folder 2) |
IR 05000244/2009004 | 13 November 2009 | IR 05000244-09-004 on 07/01/09 - 09/30/09 for R.E. Ginna Station |
IR 05000244/2008005 | 27 January 2009 | IR 05000244-08-005, on 12/27/2009, Ginna Nuclear Power Plant - Other Activities |
IR 05000244/2008002 | 30 April 2008 | IR 05000244-08-002, on 1/1/2008 - 03/31/2008, R.E. Ginna Nuclear Power Plant (Ginna), Refueling and Other Outage Activities, Identification and Resolution of Problems |
ML092090789 | 4 January 2008 | Fourth Interval Inservice Inspection (ISI) Program, Rev. 7 |
IR 05000244/2006006 | 15 October 2006 | IR 05000244-06-006, on 08/14-31/2006, R.E. Ginna Nuclear Power Plant, LLC |
IR 05000244/2006002 | 5 May 2006 | IR 05000244-06-002 on 01/01/2003 - 03/31/2006 for Constellation Energy; R.E. Ginna Nuclear Power Plant; Fire Protection, Licensed Operator Requalification Program, and Program Identification and Resolution, Cross-Cutting Areas |
ML060380256 | 9 February 2006 | Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors |
ML053260480 | 1 November 2005 | Enclosure H, Pages 45-50 of the Ginna Station Emergency Plan, Appendix G, Analysis of Evacuation Travel Times, of the Ginna Station Emergency Plan, and Ginna Station Discretionary Actions for Emergency Conditions, Effective April 28, 2005 |
IR 05000244/2005002 | 4 May 2005 | IR 05000244-05-002; on 01/01/2005 - 03/31/2005; R. E. Ginna Nuclear Power Plant |
IR 05000244/2004002 | 23 April 2004 | IR 05000244-04-002, on 01/01/2004 - 03/31/2004; R. E. Ginna Nuclear Power Plant; Operator Performance During Non Routine Events, Post-Maintenance Testing |
IR 05000244/2003006 | 6 November 2003 | IR 05000244-03-006, on 06/29/2003 - 09/27/2003; R. E. Ginna Nuclear Power Plant; Maintenance Risk Assessment and Emergent Work, Personnel Performance During Non-routine Plant Evolutions, Post Maintenance Testing, Other Activities |
ML040550271 | 30 July 2003 | to Specification ME-326, Control Room Emergency Air Treatment System (Creats) and Emergency Cooling System Design, Fabrication, & Installation Specification. |
ML030640366 | 25 February 2003 | Revision to Emergency Plan Implementing Procedure, Procedure Index - Attachment 3, Nuclear Safety Audit Review Board Members |
NRC Generic Letter 1998-04 | 14 July 1998 | NRC Generic Letter 1998-004: Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss-of-coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Material i |
ML17309A613 | 7 February 1997 | Forwards Response to NRC Request for Info Re Adequacy & Availability of Design Bases Info,Per 10CFR50.54(f) |
ML17264A772 | 31 July 1996 | 1996 Rept of Facility Changes,Tests & Experiments Conducted Without Prior Approval for Aug 1995-Jul 1996,Under Provisions of 10CFR50.59. |
ML17264A302 | 31 July 1995 | 1995 Rept of Facility Change,Tests & Experiments Conducted Without Prior Approval for Aug 1995 - Jul 1995 Under Provisions of 10CFR50.59. |
ML17263A831 | 26 September 1994 | Draft Rev C to Design Criteria Ginna Station Containment Structural Mods Wbs 4. |
ML17263A756 | 31 August 1994 | Rev 20 to QA Program for Operation. |
ML17263A650 | 31 May 1994 | Rev 20 to QA Program for Station Operation. |
ML17309A535 | 31 December 1993 | Rev 19 to QA Program for Station Operation. |
ML17263A351 | 31 December 1992 | Rev 18 to QA Program for Station Operation. |
Information Notice 1992-75, Unplanned Intakes of Airborne Radioactive Material by Individuals at Nuclear Power Plants | 12 November 1992 | Unplanned Intakes of Airborne Radioactive Material by Individuals at Nuclear Power Plants |
ML17262A634 | 28 October 1991 | Provides Notification Re Intention to Substitute Inservice Insp Exams of Two Class 2 Welds from Steam Generator B to Identical Welds on Steam Generator A.Two SG ASME Class 2 Welds Scheduled for Exam Identified on Encl Figure 1 |
ML17309A452 | 31 July 1990 | Annual Rept of Facility Changes,Tests & Experiments Conducted W/O Prior Commission Approval, Covering Aug 1989 to Jul 1990. W/901217 Ltr |
ML17309A434 | 31 July 1989 | 1989 Rept of Facility Changes,Tests & Experiments Conducted W/O Prior Approval for Aug 1988 - Jul 1989. W/891219 Ltr |
ML17261A577 | 29 July 1987 | Responds to Violations Noted in Insp Rept 50-244/87-09. Corrective Actions:New Temporary Mod Authorizations Have Been Accompanied W/Specifically Worded Determinations as Required by Administrative Procedure A-1406.1 |
ML20212M190 | 16 January 1987 | Safety Insp Rept 50-244/86-22 on 861215-19.No Violations or Deviations Noted.Major Areas Inspected:Licensee Response to Previous Insp Findings & Effectiveness of Licensee Correction Action Program |
IR 05000244/1986021 | 12 January 1987 | Insp Rept 50-244/86-21 on 861109-870103.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Findings, Review of Plant Operations,Operational Safety Verification, Surveillance Testing & Plant Maint |
Information Notice 1985-43, Radiography Events at Power Reactors | 30 May 1985 | Radiography Events at Power Reactors |
ML17256A694 | 6 May 1983 | Re Ginna Nuclear Power Plant 1982 Evaluation, Conducted During Wks of 820531 & 0607 |