Semantic search

Jump to navigation Jump to search
 Issue dateTitle
IR 05000338/202300313 November 2023Integrated Inspection Report 05000338/2023003 and 05000339/2023003
ML23192A21527 June 2023Proposed Emergency Plan Revision - Location of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary Report and Elimination of CO2 Fire Suppression System
IR 05000338/202301031 May 2023Biennial Problem Identification and Resolution Inspection Report 05000338/2023010 and 05000339/2023010
IR 05000338/20230012 May 2023Integrated Inspection Report 05000338/2023001 and 05000339/2023001
IR 05000338/20220049 February 2023Integrated Inspection Report 05000338/2022004 and 05000339/2022004
IR 05000338/202200115 December 2022Reissue - North Anna Power Station Integrated Inspection Report 05000338/2022001 and 05000339/2022001 and 07200056/2022001
ML22272A04128 September 2022(NAPS) Units 1 & 2 - Subsequent License Renewal Application, Appendix E Environmental Report Supplement 1
IR 05000338/202200211 August 2022Integrated Inspection Report 05000338/2022002 and 05000339/2022002
IR 05000339/202200113 May 2022Integrated Inspection Report 05000338/ 2022001 and 05000339/2022001 and 07200056/2022001
IR 05000338/202100414 February 2022Integrated Inspection Report, 05000338/2021004 and 05000339/2021004
ML21354A1963 January 2022Final Safety Evaluation Report for the Subsequent License Renewal Application Review (EPID No. L 2020 SLR 0000) - SER
IR 05000338/202100312 November 2021Integrated Inspection Report 05000338/2021003 and 05000339/2021003
ML21264A01118 October 2021Safety Evaluation Report Related to the Subsequent License Renewal of North Anna Power Station, Units 1 and 2
IR 05000338/202101313 October 2021Biennial Problem Identification and Resolution Inspection Report 05000338/2021013 and 05000339/2021013
IR 05000338/202101225 June 2021Triennial Fire Protection Inspection Report 05000338/2021012 and 05000339/2021012
IR 05000338/202100111 May 2021Integrated Inspection Report 05000338/2021001 and 05000339/2021001
ML21119A28729 April 2021(Naps), Unit 1 and 2 - Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Safety Review - Set 2 and Flow Accelerated Corrosion Program Enhancement Completion
ML21036A0608 April 2021Report for the Aging Management Audit Regarding the Subsequent License Renewal Application Review
ML21091A0041 April 2021SLRA Safety Review - Withdrawn Requests for Information (EPID No. L-2020-SLR-0000) - Enclosure 2
ML21091A0031 April 2021Final Request for Additional Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure 1 - RAIs
ML21088A36429 March 2021Memorandum and Order (Denying Intervention Petition and Terminating Proceeding) (LBP-21-04)
ML21049A02117 February 2021Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000338/2021012 and 05000339/2021012) and Request for Information (RFI)
ML21039A5468 February 2021Transcript of North Anna Power Station, Units 1 & 2, Hearing, February 4, 2021, Pages 1-98
ML21035A3034 February 2021(Naps), Units 1 and 2 - Update to Subsequent License Renewal Application (SLRA) Supplement 1
IR 05000338/202000428 January 2021Integrated Inspection Report 05000338/2020004 and 05000339/2020004; 07200016/2020002
ML21008A5938 January 2021NRC Staff Answer to Hearing Request, Petition to Intervene, and Petition for Waiver Filed by Beyond Nuclear, Sierra Club, and Alliance for Progressive Virginia
ML20349D95214 December 2020Hearing Request and Petition to Intervene by Beyond Nuclear, Sierra Club, and Alliance for Progressive Virginia and Petition for Waiver of 10 C.F.R. 51.53(c)(3)(i), 51.71(d), and 51.95(C)(1) to Allow Consideration of Category 1 NEPA Issues
IR 05000338/20200035 November 2020Integrated Inspection Report 05000338/2020003 and 05000339/2020003 and Exercise of Enforcement Discretion
ML20309A59730 September 20206 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML20309A60330 September 20206 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses
ML20309A61230 September 20206 to Updated Final Safety Analysis Report, Chapter 8, Electric Power System
ML20309A59430 September 20206 to Updated Final Safety Analysis Report, Frontmatter
ML20309A59330 September 20206 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML20309A61030 September 20206 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations
ML20309A61330 September 20206 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control
IR 05000338/202000211 August 2020Integrated Inspection Report 05000338-2020002 and 05000339-2020002; 07200016-2020001
IR 05000338/20200018 May 2020Integrated Inspection Report 05000338/2020001 and 05000339/2020001
ML20028D49222 January 2020Inservice Testing Program Plan for Pumps, Valves, and Snubbers Fifth 10-Year Interval Update for Units 1 and 2; Request for Alternatives to Requirements of ASME OM Code
ML19319A58317 January 2020Issuance of Amendment Nos. 285 and 268 to Revise Technical Specifications Regarding Emergency Diesel Generator Maximum Voltage Limits
ML19249B76729 August 2019Enclosure 1 - Millstone, Units 2 and 3 and ISFSI; North Anna, Units 1 and 2 and ISFSI; and Surry, Units 1 and 2 and ISFSI - Response to EAL Scheme Change RAIs
ML19249B77429 August 2019Enclosure 5 - Surry Power Station EAL Technical Bases Document Final (Updated)
ML19249B76829 August 2019Enclosure 3 - Millstone Power Station EAL Technical Bases Documents Final (Updated)
ML19249B77229 August 2019Enclosure 4 - North Anna Power Station, EAL Technical Bases Document Final (Updated)
IR 05000338/20190025 August 2019Integrated Inspection Report 05000338/2019002 and 05000339/2019002; 07200056/2019001
ML19169A09617 June 2019NRR E-mail Capture - Request for Additional Information Emergency Action Level Scheme Change for Millstone Power Station - Units 1, 2, and 3, North Anna Power Station - Units 1 and 2, and Surry Power Station - Units 1 and 2
ML19162A00510 June 2019NRR E-mail Capture - Draft RAIs for Dominion EAL Scheme Change
ML19086A11318 March 2019Proposed License Amendment Request to Reduce Maximum EDG Steady State Voltage from 4580V to 4400V
IR 05000338/201800411 February 2019NRC Integrated Inspection Report 05000338/2018004, 05000339/2018004, and 07200056/2018001
ML19011A1724 January 2019Enclosure 3, Attachments 2C-3C - MPS3 EAL Technical Bases Document (Marked-Up)
ML19011A1734 January 2019Enclosure 4 - North Anna Power Station Units 1 & 2, EAL Scheme Revisions-Supporting Documents