Semantic search

Jump to navigation Jump to search
 Issue dateTitle
RIS 1999-02, Relaxation of Technical Specification Requirements for PORC Review of Fire Protection Program Changes13 October 1999Relaxation of Technical Specification Requirements for PORC Review of Fire Protection Program Changes
ML03111044913 October 1999Relaxation of Technical Specification Requirements for PORC Review of Fire Protection Program Changes
Information Notice 1999-17, Problems Associated with Post-Fire Safe-Shutdown Circuit Analyses3 June 1999Problems Associated with Post-Fire Safe-Shutdown Circuit Analyses
Information Notice 1999-07, Failed Fire Protection Deluge Valves & Potential Testing Deficiencies in Preaction Sprinkler Systems22 March 1999Failed Fire Protection Deluge Valves & Potential Testing Deficiencies in Preaction Sprinkler Systems
CY-99-027, Annual Rept for 10CFR50.59, for Jan-Dec 1998.With31 December 1998Annual Rept for 10CFR50.59, for Jan-Dec 1998.With
IR 05000213/199800521 December 1998Insp Rept 50-213/98-05 on 980720-1102.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support
NRC Generic Letter 1998-0414 July 1998NRC Generic Letter 1998-004: Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss-of-coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Material i
ML20202D16230 June 1998Safety Evaluation Supporting Amend 193 to License DPR-61
CY-98-005, Forwards Volumes 1-3 to Decommissioning UFSAR, Which Accurately Presents Changes Completed Since Previous Submittal.Ufsar Will Be Updated IAW 10CFR50.71(e)(4),as Plant Continues to Recategorize Structures,Sys & Components26 January 1998Forwards Volumes 1-3 to Decommissioning UFSAR, Which Accurately Presents Changes Completed Since Previous Submittal.Ufsar Will Be Updated IAW 10CFR50.71(e)(4),as Plant Continues to Recategorize Structures,Sys & Components
CY-98-010, Annual Rept for 10CFR50.59,Jan-Dec,199731 December 1997Annual Rept for 10CFR50.59,Jan-Dec,1997
Information Notice 1997-71, Inappropriate Use of 10 CFR 50.59 Regarding Reduced Seismic Criteria for Temporary Conditions22 September 1997Inappropriate Use of 10 CFR 50.59 Regarding Reduced Seismic Criteria for Temporary Conditions
Information Notice 1997-59, Fire Endurance Test Results of Versawrap Fire Barriers1 August 1997Fire Endurance Test Results of Versawrap Fire Barriers
Information Notice 1997-48, Inadequate or Inappropriate Interim Fire Protection Compensatory Measures9 July 1997Inadequate or Inappropriate Interim Fire Protection Compensatory Measures
CY-97-059, Responds to NRC Re Violations Noted in Insp Repts 50-213/95-27,50-213/96-06,50-213/96-07,50-213/96-08, 50-213/96-11,50-213/96-80 & 50-213/96-201 on 951121-961122. Cas:Dedicated Individual Has Been Assigned as CA Manager11 June 1997Responds to NRC Re Violations Noted in Insp Repts 50-213/95-27,50-213/96-06,50-213/96-07,50-213/96-08, 50-213/96-11,50-213/96-80 & 50-213/96-201 on 951121-961122. Cas:Dedicated Individual Has Been Assigned as CA Manager
ML20141D26212 May 1997Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $650,000.Violation Noted:Licensee Did Not Assure That Applicable Regulatory Requirements & Design Basis Were Correctly Translated Into Specifications
ML20138E41024 April 1997Forwards Questions & Answers Per Request Re 960806 Public Meeting Held After Visiting Millstone Plant
CY-97-031, Informs NRC Staff of Final Status & Cancellation of Remaining SEP Issues Which Are Controlled Under Iis,Usi A-46 Outliner Resolutions,Ipeee Outliner Resolutions & Associated Commitments for Plant18 April 1997Informs NRC Staff of Final Status & Cancellation of Remaining SEP Issues Which Are Controlled Under Iis,Usi A-46 Outliner Resolutions,Ipeee Outliner Resolutions & Associated Commitments for Plant
Information Notice 1997-07, Problems Identified During Generic Letter 89-10 Closeout Inspections6 March 1997Problems Identified During Generic Letter 89-10 Closeout Inspections
Information Notice 1997-01, Improper Electrical Grounding Results in Simultaneous Fires in the Control Room and the Safe-Shutdown Equipment Room8 January 1997Improper Electrical Grounding Results in Simultaneous Fires in the Control Room and the Safe-Shutdown Equipment Room
B16240, Annual Repts for 10CFR50.59 PORV & SV Challenges Primary Coolant Specific Activity Analysis Occupational Radiation Exposure for 199631 December 1996Annual Repts for 10CFR50.59 PORV & SV Challenges Primary Coolant Specific Activity Analysis Occupational Radiation Exposure for 1996
ML20133B48820 December 1996Discusses Enforcement Conference Held on 961204,providing Considerable Info Related to Various Apparent Violations Resulting from Insp 50-213/96-201,96-06,96-07,96-08 & 96-80. W/Encl
ML20134L28719 December 1996Rev 0 to Grpi for Defueled Condition Fire Protection Technical Requirements
Information Notice 1996-64, Modifications to Containment Blowout Panels Without Appropriate Design Controls10 December 1996Modifications to Containment Blowout Panels Without Appropriate Design Controls
IR 05000213/19960105 November 1996Insp Rept 50-213/96-10 on 960811-0920.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support
IR 05000213/199600910 October 1996NRC Operator Licensing Exam Rept 50-213/96-09 During Wk of 960819-24.Exam Results:Six RO & Six SRO Candidates Passed Written & Operating Exams
ML20138E41819 August 1996Requests Response to Encl Questions Re Millstone Meeting within Two Week Period
ML17229B48229 February 1996Forwards Semiannual fitness-for-duty Performance Data for Jul-Dec 1995
Information Notice 1995-52, Fire Endurance Test Results for Electrical Raceway Fire Barrier Systems Constructed from 3M Company Interam Fire Barrier Materials14 November 1995Fire Endurance Test Results for Electrical Raceway Fire Barrier Systems Constructed from 3M Company Interam Fire Barrier Materials
Information Notice 1995-49, Seismic Adequacy of Thermo-Lag Panels27 October 1995Seismic Adequacy of Thermo-Lag Panels
Information Notice 1995-36, Potential Problems with Post-Fire Emergency Lighting29 August 1995Potential Problems with Post-Fire Emergency Lighting
Information Notice 1993-83, Potential Loss of Spent Fuel Pool Cooling After a Loss-of-Coolant Accident or a Loss of Offsite Power24 August 1995Potential Loss of Spent Fuel Pool Cooling After a Loss-of-Coolant Accident or a Loss of Offsite Power
Information Notice 1995-28, Emplacement of Support Pads for Spent Fuel Dry Storage Installations at Reactor Sites5 June 1995Emplacement of Support Pads for Spent Fuel Dry Storage Installations at Reactor Sites
Information Notice 1995-27, NRC Review of Nuclear Energy Institute, Thermo-Lag 330-1 Combustibility Evaluation Methodology Plant Screening Guide.31 May 1995NRC Review of Nuclear Energy Institute, Thermo-Lag 330-1 Combustibility Evaluation Methodology Plant Screening Guide.
Information Notice 1995-17, Reactor Vessel Top Guide and Core Plate Cracking10 March 1995Reactor Vessel Top Guide and Core Plate Cracking
NRC Generic Letter 1995-0126 January 1995NRC Generic Letter 1995-001: NRC Staff Technical Position on Fire Protection for Fuel Cycle Facilities
Information Notice 1994-86, Legal Actions Against Thermal Science, Inc., Manufacturer of Thermo-Lag22 December 1994Legal Actions Against Thermal Science, Inc., Manufacturer of Thermo-Lag
ML20149G77627 October 1994Forwards RAI Re Emergency Action Level Technical Basis Document
ML0312004432 September 1994Withdrawn - NRC Generic Letter 1994-004: Voluntary Reporting of Additional Occupational Radiation Exposure Data
Information Notice 1991-79, Deficiencies Found in Thermo-Lag Fire Barrier Installation4 August 1994Deficiencies Found in Thermo-Lag Fire Barrier Installation
NRC Generic Letter 1994-0325 July 1994NRC Generic Letter 1994-003: Intergranular Stress Corrosion Cracking of Core Shrouds in Boiling Water Reactors
NRC Generic Letter 1994-0211 July 1994NRC Generic Letter 1994-002: Long-Item Solutions and Upgrade of Interim Operating Recommendations for Thermal Hydraulic Instabilities in Boiling Water Reactors
NRC Generic Letter 1994-0131 May 1994NRC Generic Letter 1994-001: Removal of Accelerated Testing and Special Reporting Requirements for Emergency Diesel Generators
Information Notice 1994-24, Inadequate Maintenance of Uninterruptible Power Supplies & Inverters24 March 1994Inadequate Maintenance of Uninterruptible Power Supplies & Inverters
Information Notice 1993-41, One Hour Fire Endurance Test Results for Thermal Ceramics Kaowool, 3M Company FS-195 and 3M Company Interam E-50 Fire Barrier Systems28 May 1993One Hour Fire Endurance Test Results for Thermal Ceramics Kaowool, 3M Company FS-195 and 3M Company Interam E-50 Fire Barrier Systems
Information Notice 1993-40, Fire Endurance Test Results for Thermal Ceramics FP-60 Fire Barrier Material26 May 1993Fire Endurance Test Results for Thermal Ceramics FP-60 Fire Barrier Material
ML20128E68129 January 1993Proposed Tech Specs for RTS Instrumentation,Srs & Bases & ESFAS Instrumentation,Trip Setpoints,Srs & Bases
B14298, Updates Justification or Clarification Required to Address 10 Open Items from Integrated Plant Safety Assessment, NUREG-0826,dtd June 1983,in Support of Final Closeout of SEP Topic III-5.A29 January 1993Updates Justification or Clarification Required to Address 10 Open Items from Integrated Plant Safety Assessment, NUREG-0826,dtd June 1983,in Support of Final Closeout of SEP Topic III-5.A
ML20127M05921 January 1993Ack Receipt of 920807 Response to Request for Addl Info & Written Notification of Apparent Discrepancies in SER on post-fire Alternative Shutdown Capability,Per Insp Rept 50-213/92-80
NRC Generic Letter 1992-0817 December 1992NRC Generic Letter 1992-008: Thermo-Lag 330-1 Fire Barriers
Information Notice 1992-82, Results of Thermo-Lag 330-1 Combustibility Testing15 December 1992Results of Thermo-Lag 330-1 Combustibility Testing