Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
RIS 1999-02, Relaxation of Technical Specification Requirements for PORC Review of Fire Protection Program Changes | 13 October 1999 | Relaxation of Technical Specification Requirements for PORC Review of Fire Protection Program Changes |
ML031110449 | 13 October 1999 | Relaxation of Technical Specification Requirements for PORC Review of Fire Protection Program Changes |
Information Notice 1999-17, Problems Associated with Post-Fire Safe-Shutdown Circuit Analyses | 3 June 1999 | Problems Associated with Post-Fire Safe-Shutdown Circuit Analyses |
Information Notice 1999-07, Failed Fire Protection Deluge Valves & Potential Testing Deficiencies in Preaction Sprinkler Systems | 22 March 1999 | Failed Fire Protection Deluge Valves & Potential Testing Deficiencies in Preaction Sprinkler Systems |
CY-99-027, Annual Rept for 10CFR50.59, for Jan-Dec 1998.With | 31 December 1998 | Annual Rept for 10CFR50.59, for Jan-Dec 1998.With |
IR 05000213/1998005 | 21 December 1998 | Insp Rept 50-213/98-05 on 980720-1102.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support |
NRC Generic Letter 1998-04 | 14 July 1998 | NRC Generic Letter 1998-004: Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss-of-coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Material i |
ML20202D162 | 30 June 1998 | Safety Evaluation Supporting Amend 193 to License DPR-61 |
CY-98-005, Forwards Volumes 1-3 to Decommissioning UFSAR, Which Accurately Presents Changes Completed Since Previous Submittal.Ufsar Will Be Updated IAW 10CFR50.71(e)(4),as Plant Continues to Recategorize Structures,Sys & Components | 26 January 1998 | Forwards Volumes 1-3 to Decommissioning UFSAR, Which Accurately Presents Changes Completed Since Previous Submittal.Ufsar Will Be Updated IAW 10CFR50.71(e)(4),as Plant Continues to Recategorize Structures,Sys & Components |
CY-98-010, Annual Rept for 10CFR50.59,Jan-Dec,1997 | 31 December 1997 | Annual Rept for 10CFR50.59,Jan-Dec,1997 |
Information Notice 1997-71, Inappropriate Use of 10 CFR 50.59 Regarding Reduced Seismic Criteria for Temporary Conditions | 22 September 1997 | Inappropriate Use of 10 CFR 50.59 Regarding Reduced Seismic Criteria for Temporary Conditions |
Information Notice 1997-59, Fire Endurance Test Results of Versawrap Fire Barriers | 1 August 1997 | Fire Endurance Test Results of Versawrap Fire Barriers |
Information Notice 1997-48, Inadequate or Inappropriate Interim Fire Protection Compensatory Measures | 9 July 1997 | Inadequate or Inappropriate Interim Fire Protection Compensatory Measures |
CY-97-059, Responds to NRC Re Violations Noted in Insp Repts 50-213/95-27,50-213/96-06,50-213/96-07,50-213/96-08, 50-213/96-11,50-213/96-80 & 50-213/96-201 on 951121-961122. Cas:Dedicated Individual Has Been Assigned as CA Manager | 11 June 1997 | Responds to NRC Re Violations Noted in Insp Repts 50-213/95-27,50-213/96-06,50-213/96-07,50-213/96-08, 50-213/96-11,50-213/96-80 & 50-213/96-201 on 951121-961122. Cas:Dedicated Individual Has Been Assigned as CA Manager |
ML20141D262 | 12 May 1997 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $650,000.Violation Noted:Licensee Did Not Assure That Applicable Regulatory Requirements & Design Basis Were Correctly Translated Into Specifications |
ML20138E410 | 24 April 1997 | Forwards Questions & Answers Per Request Re 960806 Public Meeting Held After Visiting Millstone Plant |
CY-97-031, Informs NRC Staff of Final Status & Cancellation of Remaining SEP Issues Which Are Controlled Under Iis,Usi A-46 Outliner Resolutions,Ipeee Outliner Resolutions & Associated Commitments for Plant | 18 April 1997 | Informs NRC Staff of Final Status & Cancellation of Remaining SEP Issues Which Are Controlled Under Iis,Usi A-46 Outliner Resolutions,Ipeee Outliner Resolutions & Associated Commitments for Plant |
Information Notice 1997-07, Problems Identified During Generic Letter 89-10 Closeout Inspections | 6 March 1997 | Problems Identified During Generic Letter 89-10 Closeout Inspections |
Information Notice 1997-01, Improper Electrical Grounding Results in Simultaneous Fires in the Control Room and the Safe-Shutdown Equipment Room | 8 January 1997 | Improper Electrical Grounding Results in Simultaneous Fires in the Control Room and the Safe-Shutdown Equipment Room |
B16240, Annual Repts for 10CFR50.59 PORV & SV Challenges Primary Coolant Specific Activity Analysis Occupational Radiation Exposure for 1996 | 31 December 1996 | Annual Repts for 10CFR50.59 PORV & SV Challenges Primary Coolant Specific Activity Analysis Occupational Radiation Exposure for 1996 |
ML20133B488 | 20 December 1996 | Discusses Enforcement Conference Held on 961204,providing Considerable Info Related to Various Apparent Violations Resulting from Insp 50-213/96-201,96-06,96-07,96-08 & 96-80. W/Encl |
ML20134L287 | 19 December 1996 | Rev 0 to Grpi for Defueled Condition Fire Protection Technical Requirements |
Information Notice 1996-64, Modifications to Containment Blowout Panels Without Appropriate Design Controls | 10 December 1996 | Modifications to Containment Blowout Panels Without Appropriate Design Controls |
IR 05000213/1996010 | 5 November 1996 | Insp Rept 50-213/96-10 on 960811-0920.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support |
IR 05000213/1996009 | 10 October 1996 | NRC Operator Licensing Exam Rept 50-213/96-09 During Wk of 960819-24.Exam Results:Six RO & Six SRO Candidates Passed Written & Operating Exams |
ML20138E418 | 19 August 1996 | Requests Response to Encl Questions Re Millstone Meeting within Two Week Period |
ML17229B482 | 29 February 1996 | Forwards Semiannual fitness-for-duty Performance Data for Jul-Dec 1995 |
Information Notice 1995-52, Fire Endurance Test Results for Electrical Raceway Fire Barrier Systems Constructed from 3M Company Interam Fire Barrier Materials | 14 November 1995 | Fire Endurance Test Results for Electrical Raceway Fire Barrier Systems Constructed from 3M Company Interam Fire Barrier Materials |
Information Notice 1995-49, Seismic Adequacy of Thermo-Lag Panels | 27 October 1995 | Seismic Adequacy of Thermo-Lag Panels |
Information Notice 1995-36, Potential Problems with Post-Fire Emergency Lighting | 29 August 1995 | Potential Problems with Post-Fire Emergency Lighting |
Information Notice 1993-83, Potential Loss of Spent Fuel Pool Cooling After a Loss-of-Coolant Accident or a Loss of Offsite Power | 24 August 1995 | Potential Loss of Spent Fuel Pool Cooling After a Loss-of-Coolant Accident or a Loss of Offsite Power |
Information Notice 1995-28, Emplacement of Support Pads for Spent Fuel Dry Storage Installations at Reactor Sites | 5 June 1995 | Emplacement of Support Pads for Spent Fuel Dry Storage Installations at Reactor Sites |
Information Notice 1995-27, NRC Review of Nuclear Energy Institute, Thermo-Lag 330-1 Combustibility Evaluation Methodology Plant Screening Guide. | 31 May 1995 | NRC Review of Nuclear Energy Institute, Thermo-Lag 330-1 Combustibility Evaluation Methodology Plant Screening Guide. |
Information Notice 1995-17, Reactor Vessel Top Guide and Core Plate Cracking | 10 March 1995 | Reactor Vessel Top Guide and Core Plate Cracking |
NRC Generic Letter 1995-01 | 26 January 1995 | NRC Generic Letter 1995-001: NRC Staff Technical Position on Fire Protection for Fuel Cycle Facilities |
Information Notice 1994-86, Legal Actions Against Thermal Science, Inc., Manufacturer of Thermo-Lag | 22 December 1994 | Legal Actions Against Thermal Science, Inc., Manufacturer of Thermo-Lag |
ML20149G776 | 27 October 1994 | Forwards RAI Re Emergency Action Level Technical Basis Document |
ML031200443 | 2 September 1994 | Withdrawn - NRC Generic Letter 1994-004: Voluntary Reporting of Additional Occupational Radiation Exposure Data |
Information Notice 1991-79, Deficiencies Found in Thermo-Lag Fire Barrier Installation | 4 August 1994 | Deficiencies Found in Thermo-Lag Fire Barrier Installation |
NRC Generic Letter 1994-03 | 25 July 1994 | NRC Generic Letter 1994-003: Intergranular Stress Corrosion Cracking of Core Shrouds in Boiling Water Reactors |
NRC Generic Letter 1994-02 | 11 July 1994 | NRC Generic Letter 1994-002: Long-Item Solutions and Upgrade of Interim Operating Recommendations for Thermal Hydraulic Instabilities in Boiling Water Reactors |
NRC Generic Letter 1994-01 | 31 May 1994 | NRC Generic Letter 1994-001: Removal of Accelerated Testing and Special Reporting Requirements for Emergency Diesel Generators |
Information Notice 1994-24, Inadequate Maintenance of Uninterruptible Power Supplies & Inverters | 24 March 1994 | Inadequate Maintenance of Uninterruptible Power Supplies & Inverters |
Information Notice 1993-41, One Hour Fire Endurance Test Results for Thermal Ceramics Kaowool, 3M Company FS-195 and 3M Company Interam E-50 Fire Barrier Systems | 28 May 1993 | One Hour Fire Endurance Test Results for Thermal Ceramics Kaowool, 3M Company FS-195 and 3M Company Interam E-50 Fire Barrier Systems |
Information Notice 1993-40, Fire Endurance Test Results for Thermal Ceramics FP-60 Fire Barrier Material | 26 May 1993 | Fire Endurance Test Results for Thermal Ceramics FP-60 Fire Barrier Material |
ML20128E681 | 29 January 1993 | Proposed Tech Specs for RTS Instrumentation,Srs & Bases & ESFAS Instrumentation,Trip Setpoints,Srs & Bases |
B14298, Updates Justification or Clarification Required to Address 10 Open Items from Integrated Plant Safety Assessment, NUREG-0826,dtd June 1983,in Support of Final Closeout of SEP Topic III-5.A | 29 January 1993 | Updates Justification or Clarification Required to Address 10 Open Items from Integrated Plant Safety Assessment, NUREG-0826,dtd June 1983,in Support of Final Closeout of SEP Topic III-5.A |
ML20127M059 | 21 January 1993 | Ack Receipt of 920807 Response to Request for Addl Info & Written Notification of Apparent Discrepancies in SER on post-fire Alternative Shutdown Capability,Per Insp Rept 50-213/92-80 |
NRC Generic Letter 1992-08 | 17 December 1992 | NRC Generic Letter 1992-008: Thermo-Lag 330-1 Fire Barriers |
Information Notice 1992-82, Results of Thermo-Lag 330-1 Combustibility Testing | 15 December 1992 | Results of Thermo-Lag 330-1 Combustibility Testing |