MONTHYEARRNP-RA/21-0035, Duke Energy Progress, Inc - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2021-02-18018 February 2021 Duke Energy Progress, Inc - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report RNP-RA/20-0234, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks2020-07-23023 July 2020 Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks RNP-RA/20-0199, Registration of Use of Spent Fuel Casks2020-06-25025 June 2020 Registration of Use of Spent Fuel Casks RNP-RA/18-0063, Request for Extension of Due Date for Seismic Probabilistic Risk Assessment Submittal2018-11-29029 November 2018 Request for Extension of Due Date for Seismic Probabilistic Risk Assessment Submittal RNP-RA/18-0060, Transmittal of Core Operating Limits Report2018-10-17017 October 2018 Transmittal of Core Operating Limits Report RNP-RA/18-0050, Response to Supplemental Request for Additional Information Regarding License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Change2018-08-0101 August 2018 Response to Supplemental Request for Additional Information Regarding License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Change RNP-RA/18-0044, Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transform2018-07-11011 July 2018 Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RNP-RA/18-0039, Transmittal of Emergency Procedure Revisions and 10 CFR 50.54(q) Summary of Analysis2018-06-27027 June 2018 Transmittal of Emergency Procedure Revisions and 10 CFR 50.54(q) Summary of Analysis RNP-RA/18-0041, Independent Spent Fuel Storage Installation - Register as User for Cask2018-06-13013 June 2018 Independent Spent Fuel Storage Installation - Register as User for Cask RNP-RA/18-0036, Response to Request for Additional Information (RAI) Regarding Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use ...2018-05-16016 May 2018 Response to Request for Additional Information (RAI) Regarding Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use ... RNP-RA/18-0029, Submittal of 2017 Annual Radiological Environmental Operating Report2018-05-0808 May 2018 Submittal of 2017 Annual Radiological Environmental Operating Report RNP-RA/18-0031, (Hbrsep), Unit 2 - 2017 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Revision 352018-04-23023 April 2018 (Hbrsep), Unit 2 - 2017 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Revision 35 RNP-RA/18-0015, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequently Requirements to a Licensee Controlled Program2018-04-16016 April 2018 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequently Requirements to a Licensee Controlled Program RNP-RA/18-0024, Report of Changes Pursuant to 10 CFR 50.59(d)(2)2018-04-0202 April 2018 Report of Changes Pursuant to 10 CFR 50.59(d)(2) RNP-RA/18-0020, Notification of Change in Licensed Operator Status2018-02-20020 February 2018 Notification of Change in Licensed Operator Status RNP-RA/18-0003, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2018-01-23023 January 2018 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report RNP-RA/17-0085, Request for Additional Information Regarding Application to Revise Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2018-01-0808 January 2018 Request for Additional Information Regarding Application to Revise Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0086, Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analyses2017-12-14014 December 2017 Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analyses RNP-RA/17-0081, Submittal of Change in Licensed Operators Medical Status2017-12-11011 December 2017 Submittal of Change in Licensed Operators Medical Status RNP-RA/17-0079, Operator License Renewal Application2017-12-0707 December 2017 Operator License Renewal Application RNP-RA/17-0071, Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks2017-10-19019 October 2017 Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks RNP-RA/17-0068, Response to NRC Request for Additional Information Related to License Amendment Request Regarding Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-09-28028 September 2017 Response to NRC Request for Additional Information Related to License Amendment Request Regarding Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0037, License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers2017-09-27027 September 2017 License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RNP-RA/17-0043, Relief Request (RR)-12 for Relief from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-42017-09-22022 September 2017 Relief Request (RR)-12 for Relief from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-4 RNP-RA/17-0065, Refueling Outage 30 Steam Generator Tube Inspection Report2017-09-18018 September 2017 Refueling Outage 30 Steam Generator Tube Inspection Report RNP-RA/17-0060, Notification of Change in Licensed Operator Status2017-08-10010 August 2017 Notification of Change in Licensed Operator Status RNP-RA/17-0058, Notification of Change in Licensed Operator Status2017-08-0303 August 2017 Notification of Change in Licensed Operator Status RNP-RA/17-0055, Transmittal of Core Operating Limits Report for Cycle 312017-07-26026 July 2017 Transmittal of Core Operating Limits Report for Cycle 31 RNP-RA/17-0042, Submittal of the PWROG-14048-P, Revision 1, to Satisfy the Regulatory Commitment Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals2017-06-29029 June 2017 Submittal of the PWROG-14048-P, Revision 1, to Satisfy the Regulatory Commitment Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals RNP-RA/17-0051, Submittal of Nine Day Inservice Inspection Summary Report2017-06-29029 June 2017 Submittal of Nine Day Inservice Inspection Summary Report RNP-RA/17-0041, Transmittal of Technical Specifications Bases Revisions2017-05-23023 May 2017 Transmittal of Technical Specifications Bases Revisions RNP-RA/17-0038, (Hbrsep), Unit No. 2 - 2016 Annual Radiological Environmental Operating Report2017-05-0909 May 2017 (Hbrsep), Unit No. 2 - 2016 Annual Radiological Environmental Operating Report RNP-RA/17-0034, Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544)2017-05-0202 May 2017 Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544) RNP-RA/17-0036, (Hbrsep), Unit No. 2 - 2016 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Current Revision 342017-04-25025 April 2017 (Hbrsep), Unit No. 2 - 2016 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Current Revision 34 RNP-RA/17-0031, Provides Additional Information Regarding License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler 522, Revision 02017-04-20020 April 2017 Provides Additional Information Regarding License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler 522, Revision 0 RNP-RA/17-0033, Flood Hazard Mitigating Strategies Assessment (MSA) Report Submittal2017-04-12012 April 2017 Flood Hazard Mitigating Strategies Assessment (MSA) Report Submittal RNP-RA/17-0014, Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-04-0303 April 2017 Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0028, Submittal of Engineering Calculation in Support of a Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-04-0303 April 2017 Submittal of Engineering Calculation in Support of a Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0021, Transmittal of Core Operating Limits Report2017-03-13013 March 2017 Transmittal of Core Operating Limits Report RNP-RA/17-0019, Supplemental Submittal to Correct Marked Up Technical Specifications (TS) Pages Transmitted with Application for Technical Specification Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 22017-03-0808 March 2017 Supplemental Submittal to Correct Marked Up Technical Specifications (TS) Pages Transmitted with Application for Technical Specification Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 2 RNP-RA/17-0015, Independent Spent Fuel Storage Installations - Letter Regarding Report of Changes Pursuant to 10 CFR 72.482017-02-22022 February 2017 Independent Spent Fuel Storage Installations - Letter Regarding Report of Changes Pursuant to 10 CFR 72.48 RNP-RA/17-0016, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report2017-02-22022 February 2017 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report RNP-RA/17-0015, H.B. Robinson Steam Electric Plant & ISFSIs - Report of Changes Pursuant to 10 CFR 72.482017-02-22022 February 2017 H.B. Robinson Steam Electric Plant & ISFSIs - Report of Changes Pursuant to 10 CFR 72.48 RNP-RA/16-0100, Response to Apparent Violation in NRC Inspection Report 05000261/2016404, EA-16-2272017-01-24024 January 2017 Response to Apparent Violation in NRC Inspection Report 05000261/2016404, EA-16-227 RNP-RA/16-0097, Transmittal Letter for Response to Inspection Report Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7, Inspection Report 05000261/20154052016-12-15015 December 2016 Transmittal Letter for Response to Inspection Report Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7, Inspection Report 05000261/2015405 RNP-RA/16-0089, Request for Withdrawal of License Amendment Request for Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2016-11-10010 November 2016 Request for Withdrawal of License Amendment Request for Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/16-0090, Notification of Rescheduled Date for 2017 Emergency Preparedness Graded Exercise2016-11-10010 November 2016 Notification of Rescheduled Date for 2017 Emergency Preparedness Graded Exercise RNP-RA/16-0087, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-31031 October 2016 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors RNP-RA/16-0078, Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-0505 October 2016 Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors RNP-RA/16-0079, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants.2016-10-0505 October 2016 Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants. 2021-02-18
[Table view] Category:License-Operator
MONTHYEARML22350A1022022-12-16016 December 2022 301 Exam Administrative Items (Normal release)(ADAMS-2B) IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) ML22031A2542022-01-25025 January 2022 301 Corporate Notification Letter ML21260A1402021-09-15015 September 2021 Operator Licensing Examination Approval 05000261/2021301 ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19252A1532019-09-0909 September 2019 Operator Licensing Examination Approval 05000261/2019301 ML19058A6322019-07-0101 July 2019 Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19116A1212019-04-26026 April 2019 301 Retake Exam Administrative Items ADAMS-2D - Normal Release ML19115A3112019-04-25025 April 2019 302 Retake ADAMS-2A Submission Normal Release ML19115A3182019-04-25025 April 2019 302 Retake ADAMS-2B Final Exam Items Normal Release ML19115A3322019-04-25025 April 2019 302 Retake ADAMS-2D Submission Normal Release ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 IR 05000261/20183012018-06-0707 June 2018 NRC Operator License Re-Take Examination Report 05000261/2018301 ML18107A2052018-04-12012 April 2018 Retake Examination Approval Letter 05000261/2018301 ML17354B2702017-12-20020 December 2017 05000261/2017301 as Given SRO Written Exam with References and Key - Delay Release 2 Yrs ML17354B2672017-12-20020 December 2017 05000261/17301 as Given RO Written Exam with References and Key - Delay Release 2 Yrs ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16209A5732016-07-26026 July 2016 Operator Licensing Operating (Retake) Examination Approval Letter 05000261/2016-302 ML16125A0792016-04-27027 April 2016 (14) Robinson 2016-301 General Correspondence ML16124A9382016-04-27027 April 2016 (2) Robinson 2016-301 Draft RO Written Exam ML16124A8182016-04-27027 April 2016 (3) Robinson 2016-301 Draft SRO Written Exam ML16125A0692016-04-27027 April 2016 (12) Robinson 2016-301 Final Administrative JPMs ML16125A0752016-04-27027 April 2016 (15) Robinson 2016-301 Other Documents for Retention ML16125A0742016-04-27027 April 2016 (13) Robinson 2016-301 Post Exam Comments ML16125A0392016-04-27027 April 2016 (10) Robinson 2016-301 Final Simulator Scenarios ML16124A7782016-04-27027 April 2016 (4) Robinson 2016-301 Draft Simulator Scenarios ML16124B0592016-04-27027 April 2016 (7) Robinson 2016-301 Final Administrative Documents ML16124A0872016-04-27027 April 2016 (5) Robinson 2016-301 Draft Simulator and in Plant JPMs ML16125A0812016-04-27027 April 2016 (1) Robinson 2016-301 Draft Administrative Documents ML16125A0662016-04-27027 April 2016 (11) Robinson 2016-301 Final Simulator and in Plant JPMs ML16125A0352016-04-27027 April 2016 (6) Robinson 2016-301 Draft Administrative JPMs ML16061A4572016-03-0101 March 2016 301 SRO As-Given Written Exam ML16061A4532016-03-0101 March 2016 301 RO As-Given Written Exam ML16046A0082016-02-12012 February 2016 Operating Licensing Written Examination Approval 05000261/2016301 RNP-RA/15-0093, Reactor and Senior Reactor Operator Initial Examination Outlines2015-11-0404 November 2015 Reactor and Senior Reactor Operator Initial Examination Outlines ML15258A4712015-09-15015 September 2015 Initial Exam 2011-301 Draft Administrative Documents ML15251A4352015-09-0303 September 2015 Notification of Licensed Operator Initial Examination 05000261/2016301 ML15245A5512015-09-0202 September 2015 Initial Exam 2011-301 Draft Admin Jpm'S ML15245A5862015-09-0202 September 2015 Initial Exam 2011-301 Draft Admin Jpm'S ML15223B3262015-05-21021 May 2015 Initial Exam 2011-301 Draft Sim IN-Plant JPMs ML15224B3952015-05-21021 May 2015 Initial Exam 2011-301 Final Sim IN-Plant JPMs ML15224B4102015-05-21021 May 2015 Initial Exam 2011-301 Final Simulator Scenarios ML15224B4172015-05-21021 May 2015 Initial Exam 2011-301 Draft RO Written Exam ML15224B4192015-05-21021 May 2015 Initial Exam 2011-301 Draft SRO Written Exam ML15245A5612015-05-21021 May 2015 Initial Exam 2011-301 Final Admin Jpm'S ML15167A3672014-10-29029 October 2014 Initial Exam 2014-301 Final Admin Jpm'S ML15167A3712014-10-29029 October 2014 Initial Exam 2014-301 Post Exam Comments 2022-09-23
[Table view] Category:Other HQ and Regional Correspondence
[Table view] |
Text
~(DUKEs.o B.Robinson ta n H.RG "k.- ENEGYSElectric Plant Unit 2 Director- Nuc Org Effectiveness Duke Energy Progress 3581 West Entrance Road Hartsville, SC 29550 0: 843 857 5239 F: 843 857 1319 David.Hoffinan @duke-energy.coin 10 CFR 55.40 Serial: RNP-RA/15-0093 NOV O42O5 Mr. Daniel Bacon Senior Operations Engineer U. S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1 257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REACTOR AND SENMOR REACTOR OPERATOR INITIAL EXAMINATION OUTLINES
Dear Mr. Bacon:
In accordance with the guidelines in Revision 10 of NUREG-1 021, "Operator Licensing Examination Standards for Power Reactors," Duke Energy Progress, Inc. is providing the enclosed outlines for examinations scheduled to begin the week of February 1, 2016.
PursUant to 10 CFR 55.40(b)(3), Mr. Joseph Rackley, as the designated authorized representative of the H. B. Robinson Steam Electric Plant, Unit No. 2, has approved these outlines for examination of the applicants.
As required by Revision 10 of NUREG-1 021, Section ES-201, "Initial Operator Licensing Examination Process," please ensure that these outlines are withheld from public disclosure until after the examinations are complete. ,* '
If you have any questions concerning this matter, please contact Mr. Richard Drehs at (843) 857-1516.
Sincerely, f%*"
DavidS. Ho man "'
Director - Nuc Org Effectiveness
United States Nuclear Regulatory Commission Serial: RNP-RA/1 5-0093 Page 2 of 2 DSH/cac Enclosure c: Document Control Desk (wlo Enclosure)
NRC Resident Inspector, HBRSEP (w/o Enclosure)
Mr. Victor McCree, NRC, Region II (wlo Enclosure)
Ms. Martha Barillas, NRC (w/o Enclosure)
Mr. Eugene F. Guthrie, NRC, Region II (w/o Enclosure)
~(DUKEs.o B.Robinson ta n H.RG "k.- ENEGYSElectric Plant Unit 2 Director- Nuc Org Effectiveness Duke Energy Progress 3581 West Entrance Road Hartsville, SC 29550 0: 843 857 5239 F: 843 857 1319 David.Hoffinan @duke-energy.coin 10 CFR 55.40 Serial: RNP-RA/15-0093 NOV O42O5 Mr. Daniel Bacon Senior Operations Engineer U. S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1 257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REACTOR AND SENMOR REACTOR OPERATOR INITIAL EXAMINATION OUTLINES
Dear Mr. Bacon:
In accordance with the guidelines in Revision 10 of NUREG-1 021, "Operator Licensing Examination Standards for Power Reactors," Duke Energy Progress, Inc. is providing the enclosed outlines for examinations scheduled to begin the week of February 1, 2016.
PursUant to 10 CFR 55.40(b)(3), Mr. Joseph Rackley, as the designated authorized representative of the H. B. Robinson Steam Electric Plant, Unit No. 2, has approved these outlines for examination of the applicants.
As required by Revision 10 of NUREG-1 021, Section ES-201, "Initial Operator Licensing Examination Process," please ensure that these outlines are withheld from public disclosure until after the examinations are complete. ,* '
If you have any questions concerning this matter, please contact Mr. Richard Drehs at (843) 857-1516.
Sincerely, f%*"
DavidS. Ho man "'
Director - Nuc Org Effectiveness
United States Nuclear Regulatory Commission Serial: RNP-RA/1 5-0093 Page 2 of 2 DSH/cac Enclosure c: Document Control Desk (wlo Enclosure)
NRC Resident Inspector, HBRSEP (w/o Enclosure)
Mr. Victor McCree, NRC, Region II (wlo Enclosure)
Ms. Martha Barillas, NRC (w/o Enclosure)
Mr. Eugene F. Guthrie, NRC, Region II (w/o Enclosure)