|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20217N3001999-10-21021 October 1999 Proposed Tech Specs,Correcting Two Textual Errors & Changing Designation of Referenced Figure ML20217K8731999-10-18018 October 1999 Proposed Tech Specs Revising Activated Charcoal Testing Methodology IAW Guidance Provided in GL 99-02 ML20212F6941999-09-21021 September 1999 Proposed Tech Specs,Increasing Required Vol of Stored Fuel in Diesel Fuel Oil Storage Tank ML20211J0211999-08-31031 August 1999 Proposed Tech Specs Bases Page 91,allowing Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line (Predicted) Uncorrected Solution & on-line (Measured) 3D-Monicore Exposure Corrected Solution ML20211B7051999-08-18018 August 1999 Proposed Tech Specs Revising Reactor Core Spiral Reloading Pattern to Begin Around SRM ML20211B6781999-08-18018 August 1999 Proposed Tech Specs Revising Definition of Surveillance Frequency to Incorporate Provisions That Apply Upon Discovery of Missed TS Surveillance ML20210D2481999-07-20020 July 1999 Proposed Tech Specs Revising & Clarifying Operability & SRs of High Pressure Core Cooling Systems ML20210D3371999-07-20020 July 1999 Proposed Tech Specs Re Enhancements to Support Implementation of Increased Core Flow ML20209G1671999-07-12012 July 1999 Proposed Tech Specs Revising Value for SLMCPR & Deleting Wording Which Specifies These as Cycle 20 Values ML20196K2951999-06-29029 June 1999 Proposed Tech Specs Pages for Proposed Change 220,revising Leak Rate Requirements of TS 3.7.A.4 & 4.7.A.4 for Main Steam Line Isolation Valves ML20196H2881999-06-24024 June 1999 Proposed Tech Specs Revising & Clarifying Terminology Re Certain RPS Scram Bypass Permissives ML20195J8691999-06-15015 June 1999 Proposed Tech Specs Increasing Stis,Adding Allowable OOS Times,Replacing Generic ECCS Actions for Inoperable Instrument Channels with function-specific Actions & Relocating Selected Trip Functions from TS ML20195F9531999-06-0909 June 1999 Proposed Tech Specs,Supplementing Proposed Change 213, Allowing Use of ASME Code Case N-560,per GL 88-01 ML20195C8841999-05-26026 May 1999 Proposed Tech Specs Clarifying Suppression Chamber Water Temp SR 4.7.A, Primary Containment & Modifying Associated TS Bases ML20206H3771999-05-0606 May 1999 Proposed Tech Specs Pages ,Eleting Specific Leak Rate Requirements of TS 3.7.A.4 & 4.7.A.4 ML20206J7231999-05-0505 May 1999 Proposed Tech Specs Pages for Proposed Change 212,modifying TS to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to SLC Sys ML20205S9431999-04-20020 April 1999 Proposed Tech Specs,Revising Reactor Core Spiral Reloading Pattern Such That It Begins Around Source Range Monitor ML20205T4721999-04-19019 April 1999 Marked-up Tech Specs Pages Re Suppl to 990201 Request for Amend to License DPR-28,revising Portions of Proposed Change 208 ML20205S4081999-04-16016 April 1999 Proposed Tech Specs Modifying Inservice Insp Requirements of Section 4.6.E to Allow NRC-approved Alternatives to GL 88-01 ML20205S3121999-04-15015 April 1999 Proposed Tech Specs Revised Bases Pages 90,227,164 & 221a, Accounting for Change in Reload Analysis,Reflecting Change in Condensation Stability Design Criteria & Accounting for More Conservative Calculation ML20202E5451999-01-25025 January 1999 Proposed Tech Specs Re Technical Requirements Manual Content ML20206S0661999-01-22022 January 1999 Proposed TS to Change Number 189,proposing Relocation of Fire Protection Requirements from TSs to TRM ML20198D5381998-12-15015 December 1998 Proposed Tech Specs Page 142,correcting Wording to Reflect Previously Approved Wording,Last Revised in Amend 160 ML20198B7421998-12-11011 December 1998 Proposed Tech Specs Changing Wording of Primary Containment Integrity Definition to State That Manual PCIVs Which Are Required to Be Closed During Accident Conditions May Be Opened Intermittently Under ACs ML20197J4631998-12-10010 December 1998 Proposed Tech Specs Section 4.9.2,revising Info Re Calibr of Augmented Offgas Sys Hydrogen Monitors ML20197H0031998-12-0707 December 1998 Proposed Tech Specs Change 209,resolving Emergency Concern Re Potential Operation Outside of LCO Contained in Current TS & Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation ML20155F7421998-11-0303 November 1998 Proposed Tech Specs Incorporating Minor Corrections or Clarifications Which Enhance Clarity of TSs Without Materially Changing Meaning or Application ML20155G5061998-11-0202 November 1998 Proposed Tech Specs Re ECCS Actuation Instrumentation - LPCI A/B RHR Pump Start Time Delay Requirements & CS Sys A/B Pump Start Delay Requirements ML20151U0131998-09-0404 September 1998 Proposed Tech Specs,Increasing Spent Fuel Storage Capacity of Util Spent Fuel Pool from 2,870 to 3,355 Fuel Assemblies ML20236H4551998-06-30030 June 1998 Proposed Tech Specs Modifying Table 4.2.1 to Delete ECC Actuation Instrumentation Re Core Spray Sys & LPCI Sys Auxiliary Power Monitor Calibr Requirement ML20247E5671998-05-0808 May 1998 Proposed Tech Specs Page 270,containing Wording Inadvertently Deleted from TS Proposed Change 202 ML20247J8121998-05-0808 May 1998 Proposed Tech Specs Reducing Normal Operating Suppression Pool Water Temp Limit & Adding Time Restriction for Higher Temp Allowed During Surveillances That Add Heat to Suppression Pool ML20217P4171998-05-0101 May 1998 Proposed Tech Specs Re Administrative Controls Section ML20217G7131998-04-23023 April 1998 Proposed Tech Specs Change 200 Revising Station SW & Alternate Cooling Sys Requirements ML20217C4591998-03-20020 March 1998 Proposed Tech Specs Re Containment Purge & Vent ML20217A1271998-03-13013 March 1998 Proposed Tech Specs Bases Section 3.10.B,updated to Require That Station Battery,Eccs Instrumentation Battery,Or Uninterruptable Power Sys Battery Be Considered Inoperable If Any One Cell Is Below Specification Cell Voltage ML20202H2611998-02-0606 February 1998 Revised TS Pages Re Change 190,w/typos Corrected ML20197E8481997-12-22022 December 1997 Replacement Pages 160 & 279 & mark-up Pages to Proposed TS Change 190 Containing Editorial Changes ML20203F0131997-12-11011 December 1997 Proposed Tech Specs Revising Current Value for SLMCPR for Cycle 20,next Operating Cycle ML20199K8501997-11-21021 November 1997 Replacement Pages 147,156,157 & mark-up Pages to Proposed TS Change 190,removing Ref to Documents Outside of TS That Define Components to Which Program Applies ML20199J7661997-11-20020 November 1997 Proposed Tech Specs Pages,Revising Requirements for Main Station Batteries ML20217H6931997-10-10010 October 1997 Proposed Tech Specs Revising & Clarifying Requirements for Offsite Power Sources ML20211A6461997-09-18018 September 1997 Proposed Tech Specs,Providing marked-up Pages for Proposed Changes 192 & 193 ML20217Q3311997-08-22022 August 1997 Proposed Tech Specs Pages 245 & 252,amending App a to Modify TS to More Clearly Describe Separation of Switchgear Room Into Two Fire Areas & Incorporate Specifications for New Low Pressure CO2 Suppression Sys ML20217N4111997-08-20020 August 1997 Proposed Tech Specs Pages 270 & 270a,updating Section 6 in Order to Add & Revise Ref to NRC Approved Methodologies Which Will Be Used to Generate cycle-specific Thermal Operating Limits to COLR ML20141H1171997-07-11011 July 1997 Proposed Tech Specs,Replacing Pages 147,156 Through 161,168 & 279 of Util TS W/Corrected Pages ML20148J1861997-06-0909 June 1997 Proposed Tech Specs Change 191,updating Section 6.0 Administrative Controls ML20132B5771996-12-10010 December 1996 Proposed Tech Specs 3.13 Re Fire Protection Sys ML20129C4521996-10-17017 October 1996 Proposed Tech Specs,Revising Pages 89,89a & 90 to Incorporate Changes from Amends 148 & 149 ML20128N6031996-10-11011 October 1996 Proposed Tech Specs,Revising Existing Requirements Re Amount of Foam Concentrate Required to Support Operability of Recirculation Motor Generator Set Foam Sys in TS 3.13.G.1 & 3.13.G.2 1999-09-21
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217N3001999-10-21021 October 1999 Proposed Tech Specs,Correcting Two Textual Errors & Changing Designation of Referenced Figure ML20217K8731999-10-18018 October 1999 Proposed Tech Specs Revising Activated Charcoal Testing Methodology IAW Guidance Provided in GL 99-02 ML20212F6941999-09-21021 September 1999 Proposed Tech Specs,Increasing Required Vol of Stored Fuel in Diesel Fuel Oil Storage Tank ML20211J0211999-08-31031 August 1999 Proposed Tech Specs Bases Page 91,allowing Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line (Predicted) Uncorrected Solution & on-line (Measured) 3D-Monicore Exposure Corrected Solution ML20211B6781999-08-18018 August 1999 Proposed Tech Specs Revising Definition of Surveillance Frequency to Incorporate Provisions That Apply Upon Discovery of Missed TS Surveillance ML20211B7051999-08-18018 August 1999 Proposed Tech Specs Revising Reactor Core Spiral Reloading Pattern to Begin Around SRM ML20210D2481999-07-20020 July 1999 Proposed Tech Specs Revising & Clarifying Operability & SRs of High Pressure Core Cooling Systems ML20210D3371999-07-20020 July 1999 Proposed Tech Specs Re Enhancements to Support Implementation of Increased Core Flow ML20209G1671999-07-12012 July 1999 Proposed Tech Specs Revising Value for SLMCPR & Deleting Wording Which Specifies These as Cycle 20 Values ML20196K2951999-06-29029 June 1999 Proposed Tech Specs Pages for Proposed Change 220,revising Leak Rate Requirements of TS 3.7.A.4 & 4.7.A.4 for Main Steam Line Isolation Valves ML20196H2881999-06-24024 June 1999 Proposed Tech Specs Revising & Clarifying Terminology Re Certain RPS Scram Bypass Permissives ML20195J8691999-06-15015 June 1999 Proposed Tech Specs Increasing Stis,Adding Allowable OOS Times,Replacing Generic ECCS Actions for Inoperable Instrument Channels with function-specific Actions & Relocating Selected Trip Functions from TS ML20195F9531999-06-0909 June 1999 Proposed Tech Specs,Supplementing Proposed Change 213, Allowing Use of ASME Code Case N-560,per GL 88-01 ML20195C8841999-05-26026 May 1999 Proposed Tech Specs Clarifying Suppression Chamber Water Temp SR 4.7.A, Primary Containment & Modifying Associated TS Bases ML20206H3771999-05-0606 May 1999 Proposed Tech Specs Pages ,Eleting Specific Leak Rate Requirements of TS 3.7.A.4 & 4.7.A.4 ML20206J7231999-05-0505 May 1999 Proposed Tech Specs Pages for Proposed Change 212,modifying TS to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to SLC Sys ML20205S9431999-04-20020 April 1999 Proposed Tech Specs,Revising Reactor Core Spiral Reloading Pattern Such That It Begins Around Source Range Monitor ML20205T4721999-04-19019 April 1999 Marked-up Tech Specs Pages Re Suppl to 990201 Request for Amend to License DPR-28,revising Portions of Proposed Change 208 ML20205S4081999-04-16016 April 1999 Proposed Tech Specs Modifying Inservice Insp Requirements of Section 4.6.E to Allow NRC-approved Alternatives to GL 88-01 ML20205S3121999-04-15015 April 1999 Proposed Tech Specs Revised Bases Pages 90,227,164 & 221a, Accounting for Change in Reload Analysis,Reflecting Change in Condensation Stability Design Criteria & Accounting for More Conservative Calculation ML20202E5451999-01-25025 January 1999 Proposed Tech Specs Re Technical Requirements Manual Content ML20206S0661999-01-22022 January 1999 Proposed TS to Change Number 189,proposing Relocation of Fire Protection Requirements from TSs to TRM ML20198D5381998-12-15015 December 1998 Proposed Tech Specs Page 142,correcting Wording to Reflect Previously Approved Wording,Last Revised in Amend 160 ML20198B7421998-12-11011 December 1998 Proposed Tech Specs Changing Wording of Primary Containment Integrity Definition to State That Manual PCIVs Which Are Required to Be Closed During Accident Conditions May Be Opened Intermittently Under ACs ML20197J4631998-12-10010 December 1998 Proposed Tech Specs Section 4.9.2,revising Info Re Calibr of Augmented Offgas Sys Hydrogen Monitors ML20197H0031998-12-0707 December 1998 Proposed Tech Specs Change 209,resolving Emergency Concern Re Potential Operation Outside of LCO Contained in Current TS & Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation ML20155F7421998-11-0303 November 1998 Proposed Tech Specs Incorporating Minor Corrections or Clarifications Which Enhance Clarity of TSs Without Materially Changing Meaning or Application ML20155G5061998-11-0202 November 1998 Proposed Tech Specs Re ECCS Actuation Instrumentation - LPCI A/B RHR Pump Start Time Delay Requirements & CS Sys A/B Pump Start Delay Requirements ML20196A7851998-10-0909 October 1998 Rev 19 to Vynp IST Program Plan ML20151U0131998-09-0404 September 1998 Proposed Tech Specs,Increasing Spent Fuel Storage Capacity of Util Spent Fuel Pool from 2,870 to 3,355 Fuel Assemblies ML20237E9571998-08-27027 August 1998 Start-Up Test Rept Vynp Cycle 20 ML20236H4551998-06-30030 June 1998 Proposed Tech Specs Modifying Table 4.2.1 to Delete ECC Actuation Instrumentation Re Core Spray Sys & LPCI Sys Auxiliary Power Monitor Calibr Requirement ML20247J8121998-05-0808 May 1998 Proposed Tech Specs Reducing Normal Operating Suppression Pool Water Temp Limit & Adding Time Restriction for Higher Temp Allowed During Surveillances That Add Heat to Suppression Pool ML20247E5671998-05-0808 May 1998 Proposed Tech Specs Page 270,containing Wording Inadvertently Deleted from TS Proposed Change 202 ML20217P4171998-05-0101 May 1998 Proposed Tech Specs Re Administrative Controls Section ML20217G7131998-04-23023 April 1998 Proposed Tech Specs Change 200 Revising Station SW & Alternate Cooling Sys Requirements ML20217C4591998-03-20020 March 1998 Proposed Tech Specs Re Containment Purge & Vent ML20217A1271998-03-13013 March 1998 Proposed Tech Specs Bases Section 3.10.B,updated to Require That Station Battery,Eccs Instrumentation Battery,Or Uninterruptable Power Sys Battery Be Considered Inoperable If Any One Cell Is Below Specification Cell Voltage ML20202H2611998-02-0606 February 1998 Revised TS Pages Re Change 190,w/typos Corrected ML20197E8481997-12-22022 December 1997 Replacement Pages 160 & 279 & mark-up Pages to Proposed TS Change 190 Containing Editorial Changes ML20203F0131997-12-11011 December 1997 Proposed Tech Specs Revising Current Value for SLMCPR for Cycle 20,next Operating Cycle ML20199K8501997-11-21021 November 1997 Replacement Pages 147,156,157 & mark-up Pages to Proposed TS Change 190,removing Ref to Documents Outside of TS That Define Components to Which Program Applies ML20199J7661997-11-20020 November 1997 Proposed Tech Specs Pages,Revising Requirements for Main Station Batteries ML20217H6931997-10-10010 October 1997 Proposed Tech Specs Revising & Clarifying Requirements for Offsite Power Sources ML20211A6461997-09-18018 September 1997 Proposed Tech Specs,Providing marked-up Pages for Proposed Changes 192 & 193 ML20217Q3311997-08-22022 August 1997 Proposed Tech Specs Pages 245 & 252,amending App a to Modify TS to More Clearly Describe Separation of Switchgear Room Into Two Fire Areas & Incorporate Specifications for New Low Pressure CO2 Suppression Sys ML20217N4111997-08-20020 August 1997 Proposed Tech Specs Pages 270 & 270a,updating Section 6 in Order to Add & Revise Ref to NRC Approved Methodologies Which Will Be Used to Generate cycle-specific Thermal Operating Limits to COLR ML20141H1171997-07-11011 July 1997 Proposed Tech Specs,Replacing Pages 147,156 Through 161,168 & 279 of Util TS W/Corrected Pages ML20148J1861997-06-0909 June 1997 Proposed Tech Specs Change 191,updating Section 6.0 Administrative Controls ML20149M7451997-01-24024 January 1997 Startup Test Rept,Vermont Yankee Cycle 19 1999-09-21
[Table view] |
Text
.e*f S*U e e
lig .
3 -
E m 5 3 1
E E N
E c3j iE
~
4
! l: !=
n
~
I !1:I 5
- EE
=U Ul 85 s z
O .- .
M E b
d -
e u a M E Ih z -
e4 .<C
H M
ts
<=
M O + [O og p A ,
v-O A _ e GE H A -E
% D hb b$
g a c=
22 e
m g*,
M EE 4
- 2:
-n e !
a a E
5 1
3 i 8 1
l l I
g -
- 1 I l- -
E i l- la 'f E i 3
5 I i g ;
I :
3 la i .8 I E 3E ===n a = i T 8 3 I E8 1
' ! lj l l 11
! < _ ___ 2
.i e
-i .
x W
E *I N
e a
8108100354 810804 !
~
DR ADOCK 05000271
. PDR
G R G N O N ITS I I R F V E F E E A DND N
IUP I N T S
CEU C N S I D T
N E
LgD L$ 2 AgN AR CgE TC0 9 IgI FI$ 1 NgN N
CgI R NW!
I
$CI N r
EgE EA T P T U
S r
R O R R
O mIS R O
E TF V T UF C
TM A S C A 9AT E
R sU F E R
GS C
S N
O I
T A
T R O
T N L S T LS E O D OI RV W RF TF R WmTR RANE R NA OT T E T OP T
S C$ R S CU N 1
0 N I
S I lA l
P 3 *
R L A A 1 E l D T
N R N L A rE O 6 C aCNA T yC S AA 1 LN I
U r A M
$ PA T E N S A
M A R Z U E
I G l N I K ER A F M C O G A NS F R AI Y M R V F A O I T T imp S D M 01 1
1 1
I V
T S N I
W O
I S
N H Y
O I
S N T T P CE O S
ES N S TN C C OER S I
S Y I RCO N R S PIT O T T TF LA I N s&NF E R T P PA N
i t
D RS T R I
FEORO
- PE I S
Ty H T L R OP C L R RT A A O1OAE E E M F7IRV T
M E1DPT L
9
$OA EI S R I R 1. D S S0EDT D
M N1S5I S
T N
E C
O PI SSCCE DDIN ENIII P N D O N RALLA I E T T - - -
A R
E N
I R
. * ** oo s P E O P U
S o o e e
R R t s
S N 5 0 O t S $ TS S R o R L R R O ! T I O R O OMO O I
T V F I
V R
I T ROT WT A
R P D R E
P DL O RA S R E TOA NRR O E LA IR E
E U U T P P S O
S N O O
C P O MOP C
1 j 3
VYNPS 6.2 REVIEW AND AUDIT .
r Organizational units for the review and audit of plant operations shall be constituted and have the responsibilities and authorities outlined below:
^
A. Plant Operations Review Committee
- 1. Membe rship
- a. Chai rman : Plant Manager i b. Vice-Chairman: Assistant Plant Manager
- c. Vice-Chai rman : Operations Superintendent
- d. Vice-Chairman: Technical Services Superintendent
- e. Engineering Support Supervisor
- f. Operations Supervisor
- g. Maintenance Supervisor
- h. Reactor and Computer Supervisor
- 1. Chemistry and Health Physics Supervisor
- j. Instrument and Control Supervisor
- k. Health Physicist I
- 2. Qualifications The qualifications of the regular members of the Plant Safety Committee with regard to the combined experience and technical specialties of the individual members shall be maintained at a level at least equal to or higher than as described in Specification 6.1.
- 3. Meeting frequency: Monthly, and as required, on call of t'.c Chairman.
- 4. Quorum: Chairman or Vice-Chairman plus four members or their designated alternates.
NOTE: For purposes of satisfying a quorum, a Vice-Chairman may be considered a member providing that Vice-Chairman is not presiding over the meeting.
194
VYNPS Designated alternates shall be from other plant personnel in the appropriate disciplines or from ths Technical Services Group; however, there shall be no more than three (3) alternate members serving on the 5
committee at any one time.
r
- 6. Responsibilities Review all proposed maintenance
- a. Review proposed normal, abnormal and emergency operating procedures.
procedures and proposed changes to those procedures; and any other proposed procedures or changes thereto as determined by the Plant Manager to affect nuclear safety.
- b. Feview proposed tests and experiments.
- c. Review proposed changes to Technical Specifications.
4
- d. Review proposed changes or modifications to plant systems or equipment, which changes would require a change in procedures in (a) above.
- e. Review plant operations to detect any potential safety hazards.
f.
Investigate reported instances of violations of Technical Specifications, such investigations to include reporting, evaluation and recommendations to prevent recurrence, to the Manager of Operations (See Figure 6.1.1).
- g. Perform special reviews and investigations and render reports thereon as requested by the Chairman of the Nuclear Safety Audit and Review Committee.
! 7. Authority i
- a. The Plant Operation Review Committee shall be advisory.
- b. The Plant Operation Review Committee shall recommend to the Plant Manager approval or disapproval of proposals under Items f (a) through (d) abova.
In the event of disagreement between the recommendations of the Plant Operation Review Cormittee and
- 1. the course determined by the Plant Manager to be the
. the actions contemplated by the Plant Manager, more conservative will be followed with immediate notification to the Manager of Operations.
195
VYNPS ,
- c. The Plant Operation Review Committee shall make tentative determinations as to whether or not proposals considered by the Committee involve unreviewed safety questions. This determination shall be subject to review by the Nuclear Safety Audit and Review Committee. 4
- 8. Records Minutes shall be kept at the plant of all meetings of the Plant Operation Review Committee and copies shall be sent to the Manager of Operations and the Nuclear Safety Audit and Review Committee.
B. Nuclear Safety Audit and Review Committee
- 1. The Committee shall consist of at least six (6) persons:
- a. Chai rman i
- b. Vice Chairman
- c. Four technically qualified persons who are not members of the plant staff. i l
- d. No more than three members shall be selected from the organization reporting to the Manager of l Ope ra t ions .
- e. The Committee will obtain advice and counsel from scientific or technical personnel employed by the Company or other organizations whenever the Committee considers it necessary to obtain further scientific or technical assistance in carrying out its responsibilities.
- f. The Committee membership and its Chhirman and Vice Chairman shall be appointed by the Vermont Yankee Vice President or such person as he shall designate.
! 2. Qualifications I
l The Committee shall consist of a minimum of six (6) -embers or designated alternates who as a group employ expertise in the following areas:
- a. 'uclear N Power Plant Technology
- b. Reactor Operations l
- c. Utility Operations 196
O VYNPS
- d. Power Plant Design
- e. Reactor Engineering i
- f. Radiation Safety
- g. Safety Analysis
- h. Instrumentation and Control
- 1. Metallurgy
- 3. Meeting Frequency: Semi-annually and as required on call of the Chainnan. l j
- 4. Quorum:
Chairman or Vice Chairman plus four members or designated alternates. l
- 5. Responsibilities
- a. Review proposed changes to the operating license including Technical Specifications.
- b. Review minutes of meetings of the Plant Operation Review Committee to determine if matters considered by j
that committee involve unreviewed or unresolved safety questions, i
- c. Review matters including proposed changes or modifications to plant systems or equipment having safety significance or referred to it by the Plant Operation Review Committee or by the Plant Manager.
- d. Periodic audits of plant operations, and audits of the facility fire protection program and implementing procedures shall be performed under cognizance of the Committee.
- e. Investigate all reported instances of violations of Technical Specifications, reporting findings and l
' recommendations to prevent recurrence to the Manager of Operations.
- f. Perform special reviews and investigations and render reports thereon as requested by the M'anager of
' Operations.
- g. Review proposed tests and experiments and results thereof when applicable.
- n. Review abnormal performance of plant equipment and anomalies.
197
VYNPS
- i. Review unusual occurrences and incidents which are reportable under the provisions of 10 CFR Part 20 and 10 CFR Part 50. ...
J. Review of occurrences if Safety Limits are exceeded.
- 6. Authority
- a. Review proposed changes to the operating license including Technical Specifications and revised bases for submittal to the NRC.
- b. Review proposed changes or modifications to plant systems or equipment, provided that such changes or modifications do not involve unreviewed safety questions.
- c. Recommend to the Manager of Operations appropriate action to prevent recurrence of any violations of l Technical Specifications.
I
- d. Evaluate actions taken by the Plant Operation Review Committee.
- 7. Records Minutes of all meetings of this committee shall be recorded. Copies of the minutes shall be forwarded to I the Manager of Operations, the Vice President-Operations, the Plant Manager and any others that the Chairman may designate.
l l
l 198
VYNPS Procedures prepared for A and B abose shall be reviewed and apprt red by the Plant Manager or his designee and the Manager of Operations.
D. Temporary changes to procedures described in Specification 6.5. A above which do not change the intent of the original procedure, may be made with the concurrence of two individuals holding senior operator licenses. Such changes shall be documented and subsequently reviewed by the PORC and approved by the Plant Manager or his designee. ,
E. Temporary changes to procedures described in Specification 6.5.B may be made with the concurrence of an individual holding a senior operator license and the health physicist on duty.
F. Practice of site evacuation exercises shall be conducted annually, following emergency procedures and including a check of communications with off-site support groups. Annual reviews of the Emergency Plan shall be performed.
G. Licensed radioactive sealed sources shall be leak tested for contami .ation. Tests for leakage and/or contamination shall be performed by the licensee or by other persons specifically authorized by the Commission or an agreement State as follows:
- 1. Each licensed sealed source except startup so* rces previously subjected to core flux, containing radioactive materials, other than Hydrogen 3, with half-life greater than thirty days and in any form, other than gas, shall be tested for leakage and/or contamination at intervals not to exceed six months.
- 2. The periodic leak test required does not cpply to sealed sources that are stored and are not being used.
The sources exempted from this test shall be tested for leakage prior to any use or transfer to another user unless they have been Jeak tested within six months prior to the date of use or transfer. In the absence of a certificate from a transferer indicating that a leak test has been made within six months prior to the transfer, sealed sources shall not be put into use until tested.
- 3. Each sealed startup source shall be tested within 31 days prior to being subjected to core flux and following repair or maintenance to the source.
The leakage test shall be capable of detecting the' presence of 0.005 microcurie of radioactive material on the test sample. If the test reveals the presence of 0.005 microcurie or more of removable contamination, it shall immediately be withdrawn from use, decontaminated, and repaired, or be disposed of in accordance with Commission regulations.
Notwithstanding the periodic leak tests required by this Technical Specification, any licensed sealed source is exempt f rom such leak test when the source contains 100 microcuries or less of beta and/or gamma emitting material or 5 microcuries or less of alpha emitting material.
A special Report shall be prepared and submitted to the Commission within 90 days if source leakage tests reveal the presence of 0.005 microcuries of removable contamination.
206
1 VYNPS .
l 6.0 ADMINISTPtTIVE CONTROLS ,,.
' Administrative controls are the written rules, orders, instructions, procedures, policies, practices, and the j designation of authorities and responsibilities by the management to obtain assurance of safety and quality of'
- operation and maintenance of a nuclear power reactor. These controls shall be adhered to.
6.1 ORGANIZATION-
)
A. The Plant Manager or the Assistant Plant Manager has on-site responsibility for the safety and efficient l operation of the facility.
B. The portion of the corporate management which relates to the operation of this plant is shown in Figure 6.1.1.
C. In all matters relating to the' operation of the plant and to those Technical Specifications, the Plant Manager shall report to and be directly responsible to the Manager of Operationa.
D. ~ Conduct of operations of the plant is shown in Figure 6.1.2 and will be in accordance with the following minimum conditions (See Table 6.1.1).
1 A licensed Senior Operator and an individual qualified in radiation protection procedures shall be present on site at all times when there is fuel in the reactor.
- 2. Licensed Operators on site shall be in accordance.with Table 6.1,1, one of which must be in the control room at all times when fuel is in the reactor.
'3. A licensed Senior Operator shall be in charge of any refueling operation.
- 4. Qualifications with regard to educational background experience, and technical specialties of the key supervisory personnel listed below shall apply and be maintained in accordance with the . levels described in the American National Standards Institute N18.1-1971 " Selection and Training of Personnel for Nuclear Power Plants.*
- a. Plant Manager f. Operations Supervisor
- b. Assistant Plant Manager g. Reactor and Computer Supervisor
- c. Operations Superintendent h. Maintenance Supervisor
- d. Technical Services Superintendent 1. Instrument and Control Supervisor
- e. Chemistry and Health Physics J. Shift Supervisors Supervisor 190