Letter Sequence Response to RAI |
---|
|
|
|
|
---|
Category:Letter type:RNP
MONTHYEARRNP-RA/21-0035, Duke Energy Progress, Inc - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2021-02-18018 February 2021 Duke Energy Progress, Inc - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report RNP-RA/20-0234, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks2020-07-23023 July 2020 Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks RNP-RA/20-0199, Registration of Use of Spent Fuel Casks2020-06-25025 June 2020 Registration of Use of Spent Fuel Casks RNP-RA/18-0063, Request for Extension of Due Date for Seismic Probabilistic Risk Assessment Submittal2018-11-29029 November 2018 Request for Extension of Due Date for Seismic Probabilistic Risk Assessment Submittal RNP-RA/18-0060, Transmittal of Core Operating Limits Report2018-10-17017 October 2018 Transmittal of Core Operating Limits Report RNP-RA/18-0050, Response to Supplemental Request for Additional Information Regarding License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Change2018-08-0101 August 2018 Response to Supplemental Request for Additional Information Regarding License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Change RNP-RA/18-0044, Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transform2018-07-11011 July 2018 Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RNP-RA/18-0039, Transmittal of Emergency Procedure Revisions and 10 CFR 50.54(q) Summary of Analysis2018-06-27027 June 2018 Transmittal of Emergency Procedure Revisions and 10 CFR 50.54(q) Summary of Analysis RNP-RA/18-0041, Independent Spent Fuel Storage Installation - Register as User for Cask2018-06-13013 June 2018 Independent Spent Fuel Storage Installation - Register as User for Cask RNP-RA/18-0036, Response to Request for Additional Information (RAI) Regarding Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use ...2018-05-16016 May 2018 Response to Request for Additional Information (RAI) Regarding Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use ... RNP-RA/18-0029, Submittal of 2017 Annual Radiological Environmental Operating Report2018-05-0808 May 2018 Submittal of 2017 Annual Radiological Environmental Operating Report RNP-RA/18-0031, (Hbrsep), Unit 2 - 2017 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Revision 352018-04-23023 April 2018 (Hbrsep), Unit 2 - 2017 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Revision 35 RNP-RA/18-0015, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequently Requirements to a Licensee Controlled Program2018-04-16016 April 2018 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequently Requirements to a Licensee Controlled Program RNP-RA/18-0024, Report of Changes Pursuant to 10 CFR 50.59(d)(2)2018-04-0202 April 2018 Report of Changes Pursuant to 10 CFR 50.59(d)(2) RNP-RA/18-0020, Notification of Change in Licensed Operator Status2018-02-20020 February 2018 Notification of Change in Licensed Operator Status RNP-RA/18-0003, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2018-01-23023 January 2018 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report RNP-RA/17-0085, Request for Additional Information Regarding Application to Revise Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2018-01-0808 January 2018 Request for Additional Information Regarding Application to Revise Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0086, Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analyses2017-12-14014 December 2017 Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analyses RNP-RA/17-0081, Submittal of Change in Licensed Operators Medical Status2017-12-11011 December 2017 Submittal of Change in Licensed Operators Medical Status RNP-RA/17-0079, Operator License Renewal Application2017-12-0707 December 2017 Operator License Renewal Application RNP-RA/17-0071, Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks2017-10-19019 October 2017 Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks RNP-RA/17-0068, Response to NRC Request for Additional Information Related to License Amendment Request Regarding Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-09-28028 September 2017 Response to NRC Request for Additional Information Related to License Amendment Request Regarding Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0037, License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers2017-09-27027 September 2017 License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RNP-RA/17-0043, Relief Request (RR)-12 for Relief from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-42017-09-22022 September 2017 Relief Request (RR)-12 for Relief from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-4 RNP-RA/17-0065, Refueling Outage 30 Steam Generator Tube Inspection Report2017-09-18018 September 2017 Refueling Outage 30 Steam Generator Tube Inspection Report RNP-RA/17-0060, Notification of Change in Licensed Operator Status2017-08-10010 August 2017 Notification of Change in Licensed Operator Status RNP-RA/17-0058, Notification of Change in Licensed Operator Status2017-08-0303 August 2017 Notification of Change in Licensed Operator Status RNP-RA/17-0055, Transmittal of Core Operating Limits Report for Cycle 312017-07-26026 July 2017 Transmittal of Core Operating Limits Report for Cycle 31 RNP-RA/17-0042, Submittal of the PWROG-14048-P, Revision 1, to Satisfy the Regulatory Commitment Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals2017-06-29029 June 2017 Submittal of the PWROG-14048-P, Revision 1, to Satisfy the Regulatory Commitment Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals RNP-RA/17-0051, Submittal of Nine Day Inservice Inspection Summary Report2017-06-29029 June 2017 Submittal of Nine Day Inservice Inspection Summary Report RNP-RA/17-0041, Transmittal of Technical Specifications Bases Revisions2017-05-23023 May 2017 Transmittal of Technical Specifications Bases Revisions RNP-RA/17-0038, (Hbrsep), Unit No. 2 - 2016 Annual Radiological Environmental Operating Report2017-05-0909 May 2017 (Hbrsep), Unit No. 2 - 2016 Annual Radiological Environmental Operating Report RNP-RA/17-0034, Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544)2017-05-0202 May 2017 Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544) RNP-RA/17-0036, (Hbrsep), Unit No. 2 - 2016 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Current Revision 342017-04-25025 April 2017 (Hbrsep), Unit No. 2 - 2016 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Current Revision 34 RNP-RA/17-0031, Provides Additional Information Regarding License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler 522, Revision 02017-04-20020 April 2017 Provides Additional Information Regarding License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler 522, Revision 0 RNP-RA/17-0033, Flood Hazard Mitigating Strategies Assessment (MSA) Report Submittal2017-04-12012 April 2017 Flood Hazard Mitigating Strategies Assessment (MSA) Report Submittal RNP-RA/17-0014, Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-04-0303 April 2017 Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0028, Submittal of Engineering Calculation in Support of a Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-04-0303 April 2017 Submittal of Engineering Calculation in Support of a Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0021, Transmittal of Core Operating Limits Report2017-03-13013 March 2017 Transmittal of Core Operating Limits Report RNP-RA/17-0019, Supplemental Submittal to Correct Marked Up Technical Specifications (TS) Pages Transmitted with Application for Technical Specification Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 22017-03-0808 March 2017 Supplemental Submittal to Correct Marked Up Technical Specifications (TS) Pages Transmitted with Application for Technical Specification Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 2 RNP-RA/17-0015, Independent Spent Fuel Storage Installations - Letter Regarding Report of Changes Pursuant to 10 CFR 72.482017-02-22022 February 2017 Independent Spent Fuel Storage Installations - Letter Regarding Report of Changes Pursuant to 10 CFR 72.48 RNP-RA/17-0016, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report2017-02-22022 February 2017 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report RNP-RA/17-0015, H.B. Robinson Steam Electric Plant & ISFSIs - Report of Changes Pursuant to 10 CFR 72.482017-02-22022 February 2017 H.B. Robinson Steam Electric Plant & ISFSIs - Report of Changes Pursuant to 10 CFR 72.48 RNP-RA/16-0100, Response to Apparent Violation in NRC Inspection Report 05000261/2016404, EA-16-2272017-01-24024 January 2017 Response to Apparent Violation in NRC Inspection Report 05000261/2016404, EA-16-227 RNP-RA/16-0097, Transmittal Letter for Response to Inspection Report Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7, Inspection Report 05000261/20154052016-12-15015 December 2016 Transmittal Letter for Response to Inspection Report Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7, Inspection Report 05000261/2015405 RNP-RA/16-0089, Request for Withdrawal of License Amendment Request for Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2016-11-10010 November 2016 Request for Withdrawal of License Amendment Request for Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/16-0090, Notification of Rescheduled Date for 2017 Emergency Preparedness Graded Exercise2016-11-10010 November 2016 Notification of Rescheduled Date for 2017 Emergency Preparedness Graded Exercise RNP-RA/16-0087, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-31031 October 2016 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors RNP-RA/16-0078, Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-0505 October 2016 Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors RNP-RA/16-0079, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants.2016-10-0505 October 2016 Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants. 2021-02-18
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARRA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require2023-07-0707 July 2023 Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require RA-23-0015, Response to Request for Additional Information (RAI) Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.22023-02-0909 February 2023 Response to Request for Additional Information (RAI) Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 RA-22-0245, Response to Request for Additional Information (RAI) Regarding Removal of 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.162022-09-0808 September 2022 Response to Request for Additional Information (RAI) Regarding Removal of 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 RA-22-0210, Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-07-28028 July 2022 Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-22-0144, Response to NRC Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-022022-05-19019 May 2022 Response to NRC Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02 RA-22-0147, Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility2022-05-13013 May 2022 Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility RA-22-0106, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-04-28028 April 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-21-0230, Duke Energy - Final Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2021-09-30030 September 2021 Duke Energy - Final Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors RA-21-0063, 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan2021-03-11011 March 2021 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan RA-21-0032, Duke Energy - Response to Requests for Additional Info for Request to Use a Provision of Later Edition & Addenda of the ASME Boiler & Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(42021-02-11011 February 2021 Duke Energy - Response to Requests for Additional Info for Request to Use a Provision of Later Edition & Addenda of the ASME Boiler & Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)( RA-20-0048, Response to Request for Additional Information for Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Vessel Cold Leg Dissimilar Metal Weld Inspections2020-03-0404 March 2020 Response to Request for Additional Information for Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Vessel Cold Leg Dissimilar Metal Weld Inspections RA-20-0018, Supplement to Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding; Integrated Assessment Submittal2020-01-23023 January 2020 Supplement to Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding; Integrated Assessment Submittal RA-19-0460, Revised Response to Request for Additional Information (RAI) Regarding Reactor Pressure Vessel (RPV) Surveillance Capsule Removal2019-12-19019 December 2019 Revised Response to Request for Additional Information (RAI) Regarding Reactor Pressure Vessel (RPV) Surveillance Capsule Removal RA-19-0452, Seismic Probabilistic Risk Assessment (Spra), Response to March 12, 2012, Request for Information Regarding Recommendation 2.1: Seismic, of the Near-Term Task Force Related to the Fukushima Dai-ichi Accident2019-12-12012 December 2019 Seismic Probabilistic Risk Assessment (Spra), Response to March 12, 2012, Request for Information Regarding Recommendation 2.1: Seismic, of the Near-Term Task Force Related to the Fukushima Dai-ichi Accident RA-19-0421, Response to Request for Additional Information (RAI) Regarding Reactor Pressure Vessel (RPV) Surveillance Capsule Removal (RA-19-0145)2019-11-13013 November 2019 Response to Request for Additional Information (RAI) Regarding Reactor Pressure Vessel (RPV) Surveillance Capsule Removal (RA-19-0145) RA-19-0386, Response to Request for Additional Information (RAI) Regarding License Amendment Request Proposing to Revise Technical Specification 3.8.2, AC Sources - Shutdown, Surveillance Requirement 3.8.2.12019-10-24024 October 2019 Response to Request for Additional Information (RAI) Regarding License Amendment Request Proposing to Revise Technical Specification 3.8.2, AC Sources - Shutdown, Surveillance Requirement 3.8.2.1 RA-19-0154, Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors2019-05-0606 May 2019 Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors RA-19-0026, Response to Request for Additional Information (RAI) Regarding Proposed Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 and 10 (18-GO-001)2019-02-11011 February 2019 Response to Request for Additional Information (RAI) Regarding Proposed Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 and 10 (18-GO-001) RA-18-0185, Response to Request for Additional Information (RAI) Regarding 10 CFR 50.46 Annual Report, Including Revised Robinson Large Break Loss of Coolant Accident Report2018-12-10010 December 2018 Response to Request for Additional Information (RAI) Regarding 10 CFR 50.46 Annual Report, Including Revised Robinson Large Break Loss of Coolant Accident Report RA-18-0194, Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt TSTF-425, Revision 32018-11-13013 November 2018 Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt TSTF-425, Revision 3 RA-18-0193, Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power ..2018-11-13013 November 2018 Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power .. RNP-RA/18-0050, Response to Supplemental Request for Additional Information Regarding License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Change2018-08-0101 August 2018 Response to Supplemental Request for Additional Information Regarding License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Change RA-18-0016, Response to Request for Additional Information Regarding Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses2018-06-0505 June 2018 Response to Request for Additional Information Regarding Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses RNP-RA/18-0036, Response to Request for Additional Information (RAI) Regarding Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use ...2018-05-16016 May 2018 Response to Request for Additional Information (RAI) Regarding Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use ... RNP-RA/17-0085, Request for Additional Information Regarding Application to Revise Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2018-01-0808 January 2018 Request for Additional Information Regarding Application to Revise Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RA-17-0055, Response to Second Request for Additional Information (RAI) Regarding Application to Revise Technical Specifications for Methodology Report DPC-NE-3009, Revision 02017-12-19019 December 2017 Response to Second Request for Additional Information (RAI) Regarding Application to Revise Technical Specifications for Methodology Report DPC-NE-3009, Revision 0 RA-17-0048, Transmittal of Response to Request for Additional Information Regarding Application to Revise Technical Specifications for Methodology Report DPC-NE-3009, Rev. 0 (Part 2)2017-10-30030 October 2017 Transmittal of Response to Request for Additional Information Regarding Application to Revise Technical Specifications for Methodology Report DPC-NE-3009, Rev. 0 (Part 2) RA-17-0043, Response to Request for Additional Information Regarding Application to Revise Technical Specifications for Methodology Report DPC-NE-3009, Revision 02017-10-0909 October 2017 Response to Request for Additional Information Regarding Application to Revise Technical Specifications for Methodology Report DPC-NE-3009, Revision 0 RNP-RA/17-0068, Response to NRC Request for Additional Information Related to License Amendment Request Regarding Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-09-28028 September 2017 Response to NRC Request for Additional Information Related to License Amendment Request Regarding Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RA-17-0039, Response to Request for Additional Information (RAI) Regarding 10 CFR 50.55a(z)(1)Proposed Alternative to ASME Section XI Threads in Flange Examination (17-GO-001)2017-08-0909 August 2017 Response to Request for Additional Information (RAI) Regarding 10 CFR 50.55a(z)(1)Proposed Alternative to ASME Section XI Threads in Flange Examination (17-GO-001) RA-16-0042, Response to Request for Additional Information Application to Revise Technical Specifications for Methodology Reports DPC-NF-2010, Revision 3 & DPC-NE-2011-P, Revision 2. Redacted Version Enclosed2016-11-17017 November 2016 Response to Request for Additional Information Application to Revise Technical Specifications for Methodology Reports DPC-NF-2010, Revision 3 & DPC-NE-2011-P, Revision 2. Redacted Version Enclosed ML16315A2722016-11-10010 November 2016 Duke Energy Transmittal of Response to Request for Additional Information Regarding Application to Revise Technical Specifications for Methodology Report DPC-NE-3008, Revision 0 RNP-RA/16-0079, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants.2016-10-0505 October 2016 Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants. ML16280A2002016-10-0505 October 2016 Response to Request for Additional Information Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals RA-16-0036, Regarding Response to Request for Additional Information Regarding Application to Revise Technical Specifications for Methodology Report DPC-NE-1008, Rev 02016-10-0303 October 2016 Regarding Response to Request for Additional Information Regarding Application to Revise Technical Specifications for Methodology Report DPC-NE-1008, Rev 0 RA-16-0035, Response to Request for Additional Information (RAI) Regarding Application for Emergency Operations Facility (EOF) Consolidation2016-10-0303 October 2016 Response to Request for Additional Information (RAI) Regarding Application for Emergency Operations Facility (EOF) Consolidation RNP-RA/16-0072, Response to Request for Additional Information Regarding Application for Technical Specification Change to Adopt Technical Specifications Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Rev. 22016-09-14014 September 2016 Response to Request for Additional Information Regarding Application for Technical Specification Change to Adopt Technical Specifications Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Rev. 2 RNP-RA/16-0073, Response to Request for Additional Information Regarding License Amendment Request to Revise Reactor Coolant System Pressure and Temperature Limits2016-09-14014 September 2016 Response to Request for Additional Information Regarding License Amendment Request to Revise Reactor Coolant System Pressure and Temperature Limits ML16230A2342016-07-25025 July 2016 Response to Request for Additional Information License Amendment Request to Adopt National Fire Protection Association Standard 805 RA-16-0027, Response to NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations2016-07-14014 July 2016 Response to NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations ML16158A0062016-05-25025 May 2016 Response to Request for Additional Information Re License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants. Pages 1-21 RNP-RA/16-0038, Transition Report, Revision 1, Transition to National Fire Protection Association Standard 805, with Attachments a, I, J, L, M, and V. Pages 22-1742016-05-25025 May 2016 Transition Report, Revision 1, Transition to National Fire Protection Association Standard 805, with Attachments a, I, J, L, M, and V. Pages 22-174 RNP-RA/16-0031, Supplemental Response to Request for Additional Information Regarding License Amendment Request to Revise Reactor Coolant System Pressure and Temperature Limits2016-05-0909 May 2016 Supplemental Response to Request for Additional Information Regarding License Amendment Request to Revise Reactor Coolant System Pressure and Temperature Limits RNP-RA/16-0024, Response to Request for Additional Information Regarding License Amendment Request to Revise Reactor Coolant System Pressure and Temperature Limits2016-03-31031 March 2016 Response to Request for Additional Information Regarding License Amendment Request to Revise Reactor Coolant System Pressure and Temperature Limits RNP-RA/16-0017, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants.2016-03-16016 March 2016 Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants. ML16063A1032016-02-18018 February 2016 Response to NRC Request for Additional Information Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals RNP-RA/16-0011, Response to NRC Request for Additional Information Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals2016-02-18018 February 2016 Response to NRC Request for Additional Information Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals RNP-RA/15-0117, Supplement to Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits2015-12-22022 December 2015 Supplement to Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits 2023-07-07
[Table view] |
Text
Ernest J. Kapopoulos, Jr.
ar H. 8. Robinson Steam ENERGY Electric Plant Unit 2 Site Vice President Duke Energy 3581 West Entrance Road Hartsville, SC 29550 0 : 843 951 1701 F: 843 951 1319 Ernie.Kapopoulos@duke-energy.com Serial: RNP-RA/18-0036 10 CFR 50.90 MAY 16 2018 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 RENEWED LICENSE NO. DPR-23
SUBJECT:
RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION (RAI)
REGARDING LICENSE AMENDMENT REQUEST PROPOSING TO ADD A QUALIFIED OFFSITE CIRCUIT TO TECHNICAL SPECIFICATION 3.8.1, "AC SOURCES - OPERATING" AND THE USE OF LOAD TAP CHANGERS IN THE AUTOMATIC MODE OF OPERATION ON THE STARTUP TRANSFORMERS
REFERENCES:
- 1. Duke Energy letter, License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating" and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers, dated September 27, 2017 (ADAMS Accession No. ML17270A041 ).
- 2. Nuclear Regulatory Commission email, Robinson RA/s- LAR to Revise TS to Add a 2nd Qualified Offsite Power Circuit and Revise UFSAR to Operate L TCs in Automatic Mode, dated April 18, 2018 (ADAMS Accession No. ML18108A759).
Ladies and Gentlemen:
By letter dated September 27, 2017 (Reference 1), Duke Energy Progress, LLC (Duke Energy) submitted a License Amendment Request (LAR) for H.B. Robinson Steam Electric Plant, Unit No. 2 (HBRSEP). The proposed amendment would revise Technical Specifications (TSs) to reflect the addition of a second qualified offsite power circuit. In addition, the proposed amendment would revise the licensing basis to allow for the use of load tap changers (LTCs) in automatic mode on the new 230 kV and replacement 115 kV startup transformers.
By email dated April 18, 2018 (Reference 2), a request for additional information (RAI) was sent to Duke Energy regarding the original application. Duke Energy's response to the RAI is provided in the Enclosure to this letter.
U.S. Nuclear Regulatory Commission Serial: RNP-RA/18-0036 Page2 In accordance with 10 CFR 50.91, "Notice for Public Comment; State Consultation," a copy of this application, with attachments, is being provided to the designated South Carolina Official.
If you should have any questions regarding this submittal, please contact Mr. Kevin Ellis, Manager - Regulatory Affairs at 843-951-1329.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on OMNU Ernest J. Kapopoulos, Jr.
Site Vice President EJK/jrc
Enclosure:
Response to NRC Request for Additional Information
U.S. Nuclear Regulatory Commission Serial: RNP-RA/18-0036 Page 3 cc (with Enclosure):
C. Haney, NRC Region II - Regional Administrator J. Rotton, NRC Senior Resident Inspector- RNP D. Galvin, NRR Project Manager - RNP S. E. Jenkins, Chief, Bureau of Radiological Health (SC)
A. Wilson, Attorney General (SC)
U.S. Nuclear Regulatory Commission Serial: RNP-RA/18-0036 Page 4 bee (with Attachments):
Chris Nolan Art Zaremba Jordan Vaughan John Caves File: (Corporate)
Electronic Licensing Library (ELL)
Ernie Kapopoulos Jim Kammer John Krakuszeski Chuck Sherman Kevin Ellis Ken Ashe Mark Woodrum Neil Belanger Christine Caudell (For RNP Licensing/Nuclear Records Files)
U.S. Nuclear Regulatory Commission Enclosure to Serial: RNP-RA/18-0036 Page 1 ENCLOSURE Response to NRC Request for Additional Information LICENSE AMENDMENT REQUEST REGARDING REVISION TO TECHNICAL SPECIFICATION 3.8.1 AND ADDITION OF A SECOND QUALIFIED OFFSITE CIRCUIT WITH NEW STARTUP TRANSFORMERS AND LOAD TAP CHANGERS IN AUTOMATIC MODE H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 (HBRSEP)
DOCKET NO. 50-261 RENEWED LICENSE NO. DPR-23
U.S. Nuclear Regulatory Commission Enclosure to Serial: RNP-RA/18-0036 Page2 Response to NRC Request for Additional Information By letter dated September 27, 2017 (ADAMS Accession No. ML17270A041 ), Duke Energy Progress, LLC (Duke Energy) submitted a License Amendment Request (LAR) for H.B.
Robinson Steam Electric Plant, Unit No. 2 (HBRSEP). The proposed amendment would revise Technical Specifications (TSs) to reflect the addition of a second qualified offsite power circuit.
In addition, the proposed amendment would revise the licensing basis to allow for the use of load tap changers (LTCs) in automatic mode on the new 230 kV and replacement 115 kV startup transformers.
By email dated April 18, 2018 (ADAMS Accession No. ML18108A759), a Request for Additional Information (RAI) was sent to Duke Energy regarding the original application. Duke Energy's response to the RAI is provided below.
EEOB RAl-1 Section 3.3 of the LAR summarizes additional information the licensee generated to support the proposed change: (1) Grid Voltage Profile Summary (i.e., Grid Stability Study), (2) Steady State and Transient Load Flow Summaries, and (3) Short Circuit Analysis (i.e., Fault Analysis)
Summary.
The reference section of the LAR does not list the actual calculations/analyses supporting this information. For example, calculation(s) that provide the basis for LAR Figure 3 is not identified.
The staff requests this information to establish the basis for the summary results presented in the LAR.
Please provide a list of the calculations/analyses supporting the (Grid Stability Study), Steady State and Transient Load Flow Summaries/analysis, and Short Circuit Analysis (i.e., Fault Analysis) in Section 3.3 of the LAR, including document number, title, and revision number, etc.
Duke Energy Response to EEOB RAl-1 Calculation RNP-E-8.066, "RNP-E-8.002 Interim", Revision 0 (draft) supports the proposed modifications and includes the Grid Stability Study, Steady State and Transient Load Flow Summaries/Analysis, and Short Circuit Analysis (i.e., Fault Analysis). It should be noted, RNP-E-8.002, "The AC Auxiliary Electrical Distribution System Voltage/Load Flow/Fault Current Study" is the calculation for the existing plant configuration (U FSAR reference 8.3.1-1). Upon completion of the modifications, the content of RNP-E-8.066 will be incorporated into RNP-E-8.002.
U.S. Nuclear Regulatory Commission Enclosure to Serial: RNP-RA/18-0036 Page3 EEOB RAl-2 Robinson was licensed to draft General Design Criteria (GDC) published in the in Federal Register on July 11, 1967, as described in the Robinson UFSAR Section 3.1 (ADAMS Accession No. ML17298A849). Robinson UFSAR Section 3.1.2.39, "Emergency Power," states, in part, that:
An emergency power source shall be provided and designed with adequate independency, redundancy, capacity, and testability to permit the functioning of the engineered safety features and protection systems required to avoid undue risk to the health and safety of the public. This power source shall provide this capacity assuming a failure of a single active components. (GDC 39).
NUREG-0800, the Standard Review Plan (SRP), Section 8.2 (ADAMS Accession No. ML100740246), Subsection 111.1.E states in part that the NRC staff should evaluate the capacity and electrical characteristics of the offsite power system to ensure that there is adequate capability to supply the maximum connected load during all plant conditions.
Section 3.3.1 of the LAR states in part that the automatic load tap changing transformers will compensate for the loss of nearby generation sources relied on for voltage support for Robinson. The LAR further states that the transmission system will be managed to ensure adequate Robinson switchyard voltage is maintained in per Figure 3 of the LAR, "Minimum Required Switchyard Voltage Profile Bounding Graph." Thus, with the addition of the load tap changers and changes in local generation sources, it appears that Figure 3 represents part of the design basis of the offsite power system, and thus it or equivalent information should be included in the UFSAR. However, Figure 3 was not included in the proposed UFSAR change sheets.
Please clarify whether information in Figure 3 of the LAR or its equivalent will be included in the UFSAR or explain why such information is not appropriately included in the UFSAR.
Duke Energy Response to EEOB RAl-2 The UFSAR will be updated to include information equivalent to Figure 3 of the LAR. The following will be added to Section 8.2.2:
A minimum required switchyard voltage profile for the HBRSEP 115kV and 230kV switchyards was developed for the design of the startup transformers. The profile assumed an initial minimum scheduled switchyard voltage. The profile dropped to a minimum switchyard voltage of 0.9305 per unit (based on the nominal voltage of 115 or 230 kV) for the first second following an HBRSEP Unit trip, then ramped linearly to 0.96 per unit voltage over the next 6.5 seconds, reaching a steady state value of 0.96 per unit. Simulations were performed to validate the ability of the transmission system to maintain this voltage profile under a variety of credible contingencies. The 115kV and 230kV switchyard voltage response simulations confirm that the minimum required switchyard voltage profile can be expected to conservatively represent anticipated transmission system performance.
U.S. Nuclear Regulatory Commission Enclosure to Serial: RNP-RA/18-0036 Page 4 EEOB RAl-3 Robinson UFSAR Section 3.1.2.39, "Emergency Power," states, in part, that:
An emergency power source shall be provided and designed with adequate independency, redundancy, capacity, and testability to permit the functioning of the engineered safety features and protection systems required to avoid undue risk to the health and safety of the public. This power source shall provide this capacity assuming a failure of a single active components. (GDC 39).
Section 8.2 Subsection 111.1.E of the SRP states in part that the NRC staff should evaluate the preferred power source for each path ensure that there is adequate capability to supply the maximum connected load during all plant conditions. The design should also be examined to ensure that during transfer from one power source to another the design limits of equipment are not exceeded.
In Section 3.3.2.4 of the LAR, the licensee states, "In the normal or shutdown bus alignments and when EOG A or EOG B are running in parallel with an offsite power source for surveillance testing, the momentary short circuit ratings of E1/E2 switchgear, respectively, are exceeded.
HBRSEP will implement changes to procedures prior to implementation of the transmission upgrade modifications in order to limit loads on the applicable emergency bus. Limiting loads on the applicable bus will bring the fault current within the duty cycle." The LAR did not discuss how the EOG test loading requirement in Robinson TS Surveillance Requirement 3.8.1.8 with power 0.9 YZwill be met with the proposed limiting of loads on the applicable emergency buses E1/E2.
Please provide a discussion on how EOG test loading requirements will be met when loads are limited and EDGs are running in parallel with an offsite power source.
Duke Energy Response to EEOB RAl-3 Although NOTE 2 of TS Surveillance Requirement (SR) 3.8.1.8 discusses the capability to perform this test while synchronized with offsite power, HBRSEP currently satisfies SR 3.8.1.8 by operating each Emergency Diesel Generator (EOG) in turn on an isolated bus and not in parallel with any other power source. This test approach is not changing. Restrictions to the operation of loads on the emergency busses to limit available fault current to within the duty cycle of the E1/E2 switchgear applies only to operations when the EDGs are in parallel with an offsite power source. This emergency bus loading restriction does not impact the performance of SR 3.8.1.8.
U.S. Nuclear Regulatory Commission Enclosure to Serial: RNP-RA/18-0036 Page5 EEOB RAl-4 In Section 3.3.3.7 of the LAR, the conclusion section for the Transient Load Flows Summary, the licensee states, "In bus alignments N2, N3, N5, and N6, the voltage excursions fell below the maximum DGVR pick-up voltage of 433 V. As such, it would be necessary to disable DGVR relay during RCP start as required in the existing plant configuration."
However, bus alignment "N6" is not previously discussed in Section 3.3.3 of the LAR. For example bus alignment N6 is missing in the description of bus alignments in LAR Section 3.3.3 and from the discussion of bus transients - pump starts in Section 3.3.3.2 of the LAR.
Therefore, the NRC staff is unable to review the licensee's conclusion regarding bus alignment N6 in Section 3.3.3. 7 of the LAR.
Please provide a discussion of bus alignment N6 sufficient to support the conclusion in LAR Section 3.3.3.7, including a description of the bus alignment N6 and applicable transients.
Duke Energy Response to EEOB RAl-4 Inclusion of the N6 alignment in the conclusion section 3.3.3.7 was in error. This alignment represented operation of the unit at 100% power with both the Unit Auxiliary Transformer and the 230kV Startup Transformer both out of seNice. This distribution system alignment resulted in exceeding equipment ratings during fault conditions and HBRSEP eliminated this as a possible alignment.
The verbiage of section 3.3.3. 7 is hereby revised as indicated below:
LAR, section 3.3.3.7, second paragraph:
However, in bus alignments N2, N3, N5 and N6, the voltage excursions do fall below the maximum DGVR pickup voltage of 433V. Therefore, while operating in these bus alignments, it is necessary to disable the DGVR relay during a RCP start as already required in the existing plant configuration.
Revised:
However, in bus alignments N2, N3, and N5, the voltage excursions do fall below the maximum DGVR pickup voltage of 433V. Therefore, while operating in these bus alignments, it is necessary to disable the DGVR relay during a RCP start as already required in the existing plant configuration.
LAR, section 3.3.3. 7, fourth paragraph:
In bus alignments N5 and N6, while starting a RCP with the LTC in automatic position, results in bus oveNoltage conditions due to the LTC overshooting the setpoint. In these bus alignments, the LTC will be placed in the manual position during a RCP start.
Revised:
In bus alignment N5, starting a RCP with the LTC in automatic position results in a bus oveNoltage condition due to the LTC overshooting the setpoint. In bus alignment N5, the LTC will be placed in the manual position during a RCP start.