ML18068A087

From kanterella
Jump to navigation Jump to search
Letter Notifying Entergy Operations, Inc. and Entergy Nuclear Operations, Inc., Are No Longer Members of the Nuclear Energy Institute Effective 02/01/2018
ML18068A087
Person / Time
Site: Palisades, Indian Point, Grand Gulf, Pilgrim, Arkansas Nuclear, River Bend, Waterford  Entergy icon.png
Issue date: 03/09/2018
From: Halter M
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CNRO-2018-0006
Download: ML18068A087 (2)


Text

Entergy Nuclear Operations, Inc.

Entergy Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213 601-368-5000 Mandy Halter Director, Nuclear Licensing CNRO-2018-0006 March 9, 2018 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Nuclear Energy Institute Commitments Arkansas Nuclear One Units 1 & 2 Pilgrim Nuclear Power Station Docket Nos. 50-313 & 50-368 Docket No. 50-293 Grand Gulf Nuclear Station River Bend Station Docket No. 50-416 Docket No. 50-458 Indian Point Nuclear Generating Units 2 & 3 Waterford 3 Steam Electric Station Docket Nos. 50-247 & 50-286 Docket No. 50-382 Palisades Nuclear Power Plant Docket No. 50-255

Dear Sir or Madam:

Effective February 1, 2018, Entergy Operations, Inc. and Entergy Nuclear Operations, Inc.

(collectively referred to as Entergy) are no longer members of the Nuclear Energy Institute (NEI). This letter is to inform the NRC that the withdrawal from NEI does not impact any prior commitments made by the Entergy operating fleet to NEI documents or any commitments made on behalf of the Entergy operating fleet by NEI.

This letter contains no new regulatory commitments.

If you have any questions or require additional information, please contact Mandy Halter at (601) 368-5573.

MH/pc Cc list (next page)

CNRO-2018-0006 / Page 2 of 2 cc: USNRC Regional Administrator, Region I USNRC Regional Administrator, Region III USNRC Regional Administrator, Region IV USNRC Project Manager, ANO 1/2 USNRC Project Manager, Grand Gulf USNRC Project Manager, Indian Point 2/3 USNRC Project Manager, Palisades USNRC Project Manager, Pilgrim USNRC Project Manager, River Bend USNRC Project Manager, Waterford 3 USNRC Senior Resident Inspector, ANO 1/2 USNRC Senior Resident Inspector, Grand Gulf USNRC Senior Resident Inspector, Indian Point 2/3 USNRC Senior Resident Inspector, Palisades USNRC Senior Resident Inspector, Pilgrim USNRC Senior Resident Inspector, River Bend USNRC Senior Resident Inspector, Waterford 3 Mr. A. Bakken III (ECH)

Mr. J. Ventosa (ECH)

Mr. C. Costanzo (ECH)

Mr. L. Coyle (ECH)

Mr. R. Anderson (ANO)

Mr. E. Larson (GGNS)

Mr. A. Vitale (IPEC)

Mr. C. Arnone (PAL)

Mr. B. Sullivan (PNPS)

Mr. W. Maguire (RBS)

Mr. J. Dinelli (WF3)

Mr. R. Gaston (ECH)

Ms. M. Halter (ECH)