ML15083A059

From kanterella
Jump to navigation Jump to search
2015 Point Beach Nuclear Plant Initial License Examination Form ES-201-1
ML15083A059
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/06/2015
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Florida Power & Light Energy Point Beach
References
Download: ML15083A059 (1)


Text

ES-201, Rev. 9 Examination Preparation Checklist Form ES-201-1 Facility: Point Beach Nuclear Power Plant Date of Examination: 03/04/2015 Developed by: Written - Facility NRC // Operating - Facility NRC n/a Chief Target Task Description (Reference) Examiner=s Date*

Initials

-180 1. Examination administration date confirmed (C.1.a; C.2.a and b) dm

-120 2. NRC examiners and facility contact assigned (C.1.d; C.2.e) dm

-120 3. Facility contact briefed on security and other requirements (C.2.c) dm

-120 4. Corporate notification letter sent (C.2.d) dm

[-90] [5. Reference material due (C.1.e; C.3.c; Attachment 2)] dm

6. Integrated examination outline(s) due, including Forms ES-201-2, ES-201-

{-75} 3, ES-301-1, ES-301-2, ES-301-5, ES-D-1's, ES-401-1/2, ES-401-3, and dm ES-401-4, as applicable (C.1.e and f; C.3.d)

{7. Examination outline(s) reviewed by NRC and feedback provided to facility

{-70} dm licensee (C.2.h; C.3.e)}

8. Proposed examinations (including written, walk-through JPMs, and scenarios, as applicable), supporting documentation (including Forms

{-45} dm ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, and any Form ES-201-3 updates), and reference materials due (C.1.e, f, g and h; C.3.d)

9. Preliminary license applications (NRC Form 398s) due (C.1.l; C.2.g;

-30 dm ES-202)

10. Final license applications due and Form ES-201-4 prepared (C.1.l; C.2.i;

-14 dm ES-202)

11. Examination approved by NRC supervisor for facility licensee review

-14 dm (C.2.h; C.3.f)

-14 12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g) dm

13. Written examinations and operating tests approved by NRC supervisor

-7 dm (C.2.i; C.3.h)

14. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm

-7 qualifications / eligibility; and examination approval and waiver letters sent dm (C.2.i; Attachment 4; ES-202, C.2.e; ES-204)

15. Proctoring/written exam administration guidelines reviewed

-7 dm with facility licensee (C.3.k)

16. Approved scenarios, job performance measures, and questions

-7 dm distributed to NRC examiners (C.3.i)

  • Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.

[Applies only] {Does not apply} to examinations prepared by the NRC.