Category:Letter
MONTHYEARML24023A0342024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0038 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML23341A2102024-01-22022 January 2024 LTR-23-0216-1 - Closure Letter - 2.206 Petition for License Renewal Plant Reactor Pressure Vessel Embrittlement ML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report ML23340A0332023-12-0101 December 2023 FPL to Fws, Comments Submitted by Florida Power and Light on the Species Status Assessment Accompanying the September 20, 2023 Proposed Threatened Species Status with Section 4(d) Rule for the Miami Cave Crayfish L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23333A0152023-11-27027 November 2023 Attachment G - Arcadis Memo Re FPL Year 4 Raasr Final (June 2, 2023, Appended to Derm letter)-1 ML23333A0102023-11-27027 November 2023 Attachment B - 11/07/2022 - Waterkeeper Scoping Comments-1 L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles IR 05000250/20230032023-11-0909 November 2023 Integrated Inspection Report 05000250/2023003 and 05000251/2023003 ML23310A1342023-11-0404 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 Petition Amendment; Turkey Point Subsequent Renewal with Petitioner 11/04/2023 ML24016A2622023-10-25025 October 2023 Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected Project L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications ML23265A5492023-09-22022 September 2023 Transmittal of WCAP-18830-P/NP Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles to Support a License Amendment Request from FPL - License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23243A9522023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9542023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9532023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9552023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application - Tribe- Section 106 Letters ML23199A2352023-09-0505 September 2023 Letter to EPA-Turkey Point Nuclear Generating Station, Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal ML23199A2482023-09-0505 September 2023 Ltr to Florida Power and Light Co - Turkey Point Nuclear Generating Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project IR 05000250/20230052023-08-21021 August 2023 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2023005 and 05000251/2023005) L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000250/20230022023-08-14014 August 2023 Integrated Inspection Report 05000250/2023002 and 05000251/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23242A0922023-08-0606 August 2023 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23198A2702023-08-0303 August 2023 Issuance of the Site-Specific Environmental Impact Statement Scoping Process Summary Report Associated with the Turkey Point Nuclear Generating Unit Numbers 3 and 4, Subsequent License Renewal Application, Environmental Report Supplement 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23178A1872023-07-25025 July 2023 Review of the Spring 2022 Steam Generator Tube Inspections During Refueling Outage No. 33 ML23188A1242023-07-20020 July 2023 Acknowledgment of Temporary Suspension Request for License Request for License Amendment Request Reactor Protection System, Engineered Safety Features System, and Nuclear Instrumentation System ML23200A0672023-07-18018 July 2023 Tp 2023 RQ Inspection Notification Letter ML23173A0812023-07-17017 July 2023 Supplement to Regulatory Audit Plan in Support of Review of License Amendment Request Supporting Digital Instrumentation & Control Modernization Project (EPID L-2022-LLA-0105) - Non-Proprietary L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) 2024-02-05
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications ML23249A2412023-09-25025 September 2023 Regulatory Audit Summary for the Review of License Amendment Request to Revise the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23082A0402023-04-0505 April 2023 Correction of Typographical Errors Incurred During Issuance of License Amendment Nos. 260 and 255 ML22028A0662022-05-24024 May 2022 Issuance of Amendment Nos. 296 and 289 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident (Fsloca) Methodology (EPID L-2021-LLA-0070)- Non-Proprietary ML22098A0902022-04-13013 April 2022 Nextera/Fpl Non-Proprietary Presentation for April 13, 2022 Public Meeting Re Planned Turkey Point Digital Instrumentation and Controls License Amendment Request (EPID L-2021-LRM-0007) (Slides) ML22020A4032022-02-0707 February 2022 Summary of November 17, 2021, Meeting with Florida Power and Light/Nextera on Improved Technical Specification Conversion License Amendment Requests (EPIDs L-2021-LLI-0000 and L-2021-LLI-0002) ML21279A0432021-10-15015 October 2021 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade for Turkey Point, Units 3 and 4 ML21119A3552021-05-26026 May 2021 Correction to Amendment Concerning Extension of Containment Leak Rate Testing Frequency Amendments ML21032A0202021-02-26026 February 2021 Issuance of Amendment Nos. 295 and 268 Concerning Extension of Containment Leak Rate Testing Frequency ML20198M4982021-01-27027 January 2021 Issuance of Amendment Nos. 294 and 267 Regarding Emergency Action Level Scheme Upgrade (EPID L-2019-LLA-0271) (L-2019-203) ML20237F3852020-10-20020 October 2020 Issuance of Amendment Nos. 293 and 286 Regarding Containment Atmospheric Radioactivity Ventilation Isolation and Leakage Detection System ML20104B5272020-04-16016 April 2020 Issuance of Exigent Amendment No. 291 Concerning the Deferral of Steam Generator Inspections ML19357A1952020-02-10010 February 2020 Unit No.1; & Turkey Point Nuclear Generating Unit Nos. 3 & 4 - Issuance of Amendments Nos. 265, 268, 164, 290, and 284 Revise Technical Specifications to Adopt TSTF-563 ML19266A5852019-12-17017 December 2019 Issuance of Amendment Nos. 289 and 283 Technical Specification Applicability to Equipment Shared Between Units and Exception to Technical Specification 4.0.4 ML19310D7772019-12-0404 December 2019 Florida Power & Light Company - Turkey Point Nuclear Generating Unit 3 Subsequent Renewed Facility Operating License ML19305C8792019-12-0404 December 2019 LTR - Issuance of Subsequent Renewed Facility Operating License Nos. DPR-31 and DPR-41 for Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML19310D7782019-12-0404 December 2019 Florida Power & Light Company - Turkey Point Nuclear Generating Unit 4 Subsequent Renewed Facility Operating License ML19031C8912019-08-15015 August 2019 Issuance of Amendment Nos. 288 and 282 Regarding Revised Reactor Core Safety Limit to Reflect WCAP-17642-PA Revision 1 ML19148A7442019-07-31031 July 2019 Issuance of Amendment Nos. 161, 249, 200, 287, and 281 to Add Technical Specification Limiting Condition for Operation 3.0.6 L-2019-088, Subsequent License Renewal Application FPL Comments Regarding the NRC Biological Assessment2019-04-18018 April 2019 Subsequent License Renewal Application FPL Comments Regarding the NRC Biological Assessment ML19064A9032019-03-27027 March 2019 Issuance of Amendments Regarding Transition License Conditions for Reactor Coolant Pump Seals ML18354A6732019-03-18018 March 2019 Issuance of Amendments Regarding Technical Specifications Changes to Modify Emergency Diesel Generator Partial-Load Rejection Surveillance Requirement ML18270A4292018-12-0303 December 2018 Issuance of Amendments Nos. 284 and 278 Regarding Adoption of Risk-Informed Completion Times in Technical Specifications (CAC Nos. MF5455 and MF5456; EPID L-2014-LLA-0002) ML18255A3602018-11-14014 November 2018 Issuance of Amendments Regarding Technical Specifications Changes to Address Non-Conservative Actions for Containment and Control Room Ventilation Functions ML18019A0782018-03-19019 March 2018 Issuance of Amendments Regarding the Elimination of Certain Technical Specification Reporting Requirements (CAC Nos. MF9601 and MF9602; EPID L-2017-LLA-0213) ML18018A5592018-02-20020 February 2018 Issuance of Amendments Regarding the Technical Specification Requirements Pertaining to Mode Change Limitations (CAC Nos. MF9903 and MF9904; EPID L-2017-LLA-0254) ML17228A5632017-10-26026 October 2017 Issuance of Amendments Regarding Technical Specifications for High-Range Noble Gas Effluent Monitors ML17209A3192017-09-28028 September 2017 Issuance of Amendments Regarding Technical Specifications for Auxiliary Feedwater Actuation ML17172A1152017-08-0303 August 2017 Turkey Point Nuclear Plant Generating Unit Nos. 3 and 4 - Issuance of Amendments Regarding Technical Specifications for Control Room Emergency Ventilation System (CAC Nos. MF8221 and MF8222) ML17027A0782017-04-0707 April 2017 Issuance of Amendments Regarding Technical Specifications for Inservice Testing Programs (CAC Nos. MF8202 Through MF8209) ML17004A2922017-02-0909 February 2017 Issuance of Amendments Regarding Technical Specifications for Snubbers ML16120A4732016-06-20020 June 2016 Issuance of Amendments Regarding Technical Specifications for Moderator Temperature Coefficient Measurements ML16004A0192016-04-26026 April 2016 Issuance of Amendments Regarding Technical Specification Figure for the Boric Acid Tank Minimum Volume ML16040A3732016-03-29029 March 2016 Issuance of Amendments Regarding Technical Specifications for Communications and the Manipulator Crane ML16008B0722016-02-25025 February 2016 Issuance of Amendments Regarding Technical Specifications for Facility Staff Qualifications for Licensed Operators ML15294A4432015-11-0909 November 2015 Issuance of Amendments Regarding Emergency Core Cooling System Technical Specifications ML15233A3792015-09-28028 September 2015 Issuance of Amendments Regarding Cyber Security Milestone 8 Completion Date in the Renewed Facility Operating Licenses ML15205A1742015-08-14014 August 2015 Issuance of Amendments Regarding Removal of Reactor Coolant System Chemistry Requirements from the Technical Specifications and Relocation of Requirements in Licensee-Controlled Documents ML15181A1792015-07-27027 July 2015 Issuance of Amendments Regarding Adoption of Technical Specification Task Force Traveler 523 (TSTF-523), Revision 2 ML13329A0922014-06-13013 June 2014 Issuance of Amendments Regarding Operating License Conditions and Technical Specifications ML13329A1392014-02-21021 February 2014 Issuance of Amendments Regarding the Use of Optimized Zirlo Fuel Rod Cladding Material ML13207A0952013-09-10010 September 2013 Issuance of Amendment No. 258 Regarding a One-Time Extension of Unit 3 Technical Specification Surveillance Requirement 4.5.1.1.d ML13059A2242013-04-0202 April 2013 Issuance of Amendments Regarding the Recirculation Ph Control System and Sodium Tetraborate Basket Loading ML12339A1122012-12-17017 December 2012 Issuance of Amendments Regarding Revision of Cyber Security ML12297A2402012-11-0606 November 2012 Issuance of Amendments Regarding Adoption of TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection ML12291A7302012-11-0505 November 2012 Issuance of Amendments Regarding Revision to Technical Specifications 3.7.5 Control Room Emergency Ventilation System ML12292A3422012-11-0505 November 2012 Issuance of Amendments Regarding Permanent Alternate Repair Criteria for Steam Generator Tubes ML12208A2982012-08-0808 August 2012 Issuance of Amendments Regarding Change to Direct Current Source Surveillance Requirements ML12130A0892012-06-21021 June 2012 Issuance of Amendments Regarding Section 5.0 Design Features 2024-01-22
[Table view] Category:Safety Evaluation
MONTHYEARML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications ML22307A1152022-11-28028 November 2022 Authorization of Relief Request No. 10 Part II Related to Repair of Intake Cooling Water Discharge Piping (EPID L-2022-LLR-0032) (Non-Proprietary) ML22028A0662022-05-24024 May 2022 Issuance of Amendment Nos. 296 and 289 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident (Fsloca) Methodology (EPID L-2021-LLA-0070)- Non-Proprietary ML22123A1922022-05-10010 May 2022 Authorization of Relief Request Nos. 8 and 9 Regarding Extension of Inspection Interval for Reactor Pressure Vessel Welds ML22069A7112022-03-16016 March 2022 Authorization of Relief Request No. 10 Regarding Use of ASME Code Case N-513-4 for Extended Period for Intake Cooling Water Discharge Piping ML21032A0202021-02-26026 February 2021 Issuance of Amendment Nos. 295 and 268 Concerning Extension of Containment Leak Rate Testing Frequency ML20198M4982021-01-27027 January 2021 Issuance of Amendment Nos. 294 and 267 Regarding Emergency Action Level Scheme Upgrade (EPID L-2019-LLA-0271) (L-2019-203) ML20287A5512020-11-0606 November 2020 Approval of Alternative to Use ASME Code Section XI IWA-4340 - for Repairs of Component Cooling Water System Piping ML20237F3852020-10-20020 October 2020 Issuance of Amendment Nos. 293 and 286 Regarding Containment Atmospheric Radioactivity Ventilation Isolation and Leakage Detection System ML20104B5272020-04-16016 April 2020 Issuance of Exigent Amendment No. 291 Concerning the Deferral of Steam Generator Inspections ML19357A1952020-02-10010 February 2020 Unit No.1; & Turkey Point Nuclear Generating Unit Nos. 3 & 4 - Issuance of Amendments Nos. 265, 268, 164, 290, and 284 Revise Technical Specifications to Adopt TSTF-563 ML20015A1232020-02-0606 February 2020 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19266A5852019-12-17017 December 2019 Issuance of Amendment Nos. 289 and 283 Technical Specification Applicability to Equipment Shared Between Units and Exception to Technical Specification 4.0.4 ML19031C8912019-08-15015 August 2019 Issuance of Amendment Nos. 288 and 282 Regarding Revised Reactor Core Safety Limit to Reflect WCAP-17642-PA Revision 1 ML19148A7442019-07-31031 July 2019 Issuance of Amendment Nos. 161, 249, 200, 287, and 281 to Add Technical Specification Limiting Condition for Operation 3.0.6 ML19064A9032019-03-27027 March 2019 Issuance of Amendments Regarding Transition License Conditions for Reactor Coolant Pump Seals ML18354A6732019-03-18018 March 2019 Issuance of Amendments Regarding Technical Specifications Changes to Modify Emergency Diesel Generator Partial-Load Rejection Surveillance Requirement ML18270A4292018-12-0303 December 2018 Issuance of Amendments Nos. 284 and 278 Regarding Adoption of Risk-Informed Completion Times in Technical Specifications (CAC Nos. MF5455 and MF5456; EPID L-2014-LLA-0002) ML18255A3602018-11-14014 November 2018 Issuance of Amendments Regarding Technical Specifications Changes to Address Non-Conservative Actions for Containment and Control Room Ventilation Functions ML18130A4662018-06-12012 June 2018 Amendments Regarding Technical Specifications Pertaining to IST Program and ISI Program Requirements and Surveillance Frequency Control Program Applicability ML18106B1212018-04-25025 April 2018 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML18071A0802018-04-0606 April 2018 Correction to Safety Evaluation for Amendment Nos. 278 and 273 Regarding the Technical Specification Requirements Pertaining to Mode Change Limitations (CAC Nos. MF9903 and MF9904; EPID L-2017-LLA-0254) ML18019A0782018-03-19019 March 2018 Issuance of Amendments Regarding the Elimination of Certain Technical Specification Reporting Requirements (CAC Nos. MF9601 and MF9602; EPID L-2017-LLA-0213) ML18018A5592018-02-20020 February 2018 Issuance of Amendments Regarding the Technical Specification Requirements Pertaining to Mode Change Limitations (CAC Nos. MF9903 and MF9904; EPID L-2017-LLA-0254) ML17228A5632017-10-26026 October 2017 Issuance of Amendments Regarding Technical Specifications for High-Range Noble Gas Effluent Monitors ML17209A3192017-09-28028 September 2017 Issuance of Amendments Regarding Technical Specifications for Auxiliary Feedwater Actuation ML17213A8632017-08-29029 August 2017 Safety Evaluation for Relief Request No. PR-03, for the Fifth 10 Year Inservice Testing Interval Regarding Boric Acid Transfer Pump Testing Instrumentation ML17172A1152017-08-0303 August 2017 Turkey Point Nuclear Plant Generating Unit Nos. 3 and 4 - Issuance of Amendments Regarding Technical Specifications for Control Room Emergency Ventilation System (CAC Nos. MF8221 and MF8222) ML17122A1402017-05-10010 May 2017 Safety Evaluation for Relief Request No. 5 for Fifth 10-Year Inservice Inspection Interval ML17027A0782017-04-0707 April 2017 Issuance of Amendments Regarding Technical Specifications for Inservice Testing Programs (CAC Nos. MF8202 Through MF8209) ML16335A1952017-02-14014 February 2017 Issuance of Amendments Regarding Technical Specifications for Auxiliary Feedwater Pumps ML17004A2922017-02-0909 February 2017 Issuance of Amendments Regarding Technical Specifications for Snubbers ML16330A1182016-12-15015 December 2016 NextEra Fleet - Safety Evaluation for Proposed Alternative to the American Society of Mechanical Engineers Operation and Maintenance Code by Adoption of Approved Code Case OMN-20, Inservice Test Frequency (CAC Nos. MF8195 Through MF8201) ML16279A4552016-10-28028 October 2016 Turkey Point Nuclear Generating Station Units 3 & 4 - Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16293A7782016-10-26026 October 2016 Turkey Point Nuclear Generating, Unit Nos. 3 and 4 - Safety Evaluation for Relief Request No. 4 for Fifth 10 Year Inservice Inspection Interval - Risk-Informed Inservice Inspection Program (CAC Nos. MF7277 and MF7278) ML16120A4732016-06-20020 June 2016 Issuance of Amendments Regarding Technical Specifications for Moderator Temperature Coefficient Measurements ML16004A0192016-04-26026 April 2016 Issuance of Amendments Regarding Technical Specification Figure for the Boric Acid Tank Minimum Volume ML16040A3732016-03-29029 March 2016 Issuance of Amendments Regarding Technical Specifications for Communications and the Manipulator Crane ML16047A1182016-03-0909 March 2016 Safety Evaluation for Relief Request No. 3 for Fifth 10-Year Inservice Inspection Interval - Alternative for Examination of Snubbers (CAC Nos. MF6386 and MF6387) ML16008B0722016-02-25025 February 2016 Issuance of Amendments Regarding Technical Specifications for Facility Staff Qualifications for Licensed Operators ML16011A4402016-02-0101 February 2016 Safety Evaluation for Relief Request No. 2 for the Fifth 10-Year Inservice Inspection Interval Regarding the Amount of Coverage Obtained During Specific Examinations of the Regenerative Heat Exchanger Welds (MF6384-MF6385) ML16011A2052016-01-22022 January 2016 Safety Evaluation for Relief Request No. PR-02, for the Fifth 10-Year Inservice Testing Interval Regarding Requirements for the Quarterly Testing of the Residual Heat Removal Pumps (CAC Nos. MF6388 & MF6389) ML15350A2032015-12-23023 December 2015 Safety Evaluation for Relief Request No. 16, for the Fourth 10-Year Inservice Inspection Interval Regarding the Amount of Coverage Obtained During Specific Examinations ML15352A1622015-12-23023 December 2015 Safety Evaluation for Relief Request No. 17, for the Fourth 10-Year Inservice Inspection Interval Regarding the Amount of Coverage Obtained During Specific Examinations ML15328A2402015-12-11011 December 2015 Safety Evaluation for Relief Request No. 15, for the Fourth 10-Year Inservice Inspection Interval Regarding the Amount of Coverage Obtained During Specific Examinations ML15328A1082015-12-0909 December 2015 Safety Evaluation for Relief Request No. PR-01, for the Fifth 10-Yeaer Inservice Testing Interval Regarding Requirements for the Quarterly Testing of the Boric Acid Transfer Pumps ML15294A4432015-11-0909 November 2015 Issuance of Amendments Regarding Emergency Core Cooling System Technical Specifications ML15271A3252015-10-14014 October 2015 Safety Evaluation for Relief Request No. 1, Revision 1 for Fifth 10-Year Inservice Inspection Interval - Repair of Pressurizer Stainless Steel Heater Sleeve Without Flaw Removal ML15233A3792015-09-28028 September 2015 Issuance of Amendments Regarding Cyber Security Milestone 8 Completion Date in the Renewed Facility Operating Licenses 2024-01-22
[Table view] |
Text
September 5, 2007 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420
SUBJECT:
TURKEY POINT UNITS 3 AND 4 - ISSUANCE OF AMENDMENTS REGARDING ADDITION OF A NEW TECHNICAL SPECIFICATION 3.0.6 (TAC NOS. MD5583 AND MD5584)
Dear Mr. Stall:
The U.S. Nuclear Regulatory Commission has issued the enclosed Amendment No. 235 to Renewed Facility Operating License No. DPR-31 and Amendment No. 230 to Renewed Facility Operating License No. DPR-41 for the Turkey Point Plant, Units Nos. 3 and 4, respectively.
The amendments consist of changes to the Technical Specifications (TSs) in response to your application dated April 26, 2007.
This amendment would revise the TSs to add new Limiting Condition for Operation 3.0.6.
A copy of the Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
/RA/
Brenda L. Mozafari, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251
Enclosures:
- 1. Amendment No. 235 to DPR-31
- 2. Amendment No. 230 to DPR-41
- 3. Safety Evaluation cc w/enclosures: See next page
ML072200269 TS: ML072420209 Pkg: ML072180644 OFFICE NSPDP LPL2-2/PM LPL2-2/LA ITSB/BC OGC LPL2-2/BC NAME SAnderson BMozafari BClayton TKobetz EWilliamson TBoyce MVaaler for NLO EMarinos for DATE 8/23/07 8/13/07 8/10/07 8/22/07 (also by 8/17/07 8/23/07 memo dtd 8/1/07)
FLORIDA POWER AND LIGHT COMPANY TURKEY POINT PLANT, UNIT NO. 3 DOCKET NO. 50-250 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 235 Renewed License No. DPR-31
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Florida Power and Light Company (the licensee) dated April 26, 2007, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Renewed Facility Operating License No. DPR-31 is hereby amended to read as follows:
B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 235 are hereby incorporated into this renewed license. The Environmental Protection Plan contained in Appendix B is hereby incorporated into this renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 60 days within issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA Evangelos C. Marinos for/
Thomas H. Boyce, Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Operating License and Technical Specifications Date of Issuance: September 5, 2007
FLORIDA POWER AND LIGHT COMPANY TURKEY POINT PLANT, UNIT NO. 4 DOCKET NO. 50-251 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 230 Renewed License No. DPR-41
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Florida Power and Light Company (the licensee) dated April 26, 2007, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Renewed Facility Operating License No. DPR-41 is hereby amended to read as follows:
B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 230 are hereby incorporated into this renewed license. The Environmental Protection Plan contained in Appendix B is hereby incorporated into this renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 60 days within issuance.
FOR THE NUCLEAR REGULATORY COMMISSION RA Evangelos C. Marinos for/
Thomas H. Boyce, Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Operating License and Technical Specifications Date of Issuance: September 5, 2007
ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO. 235 RENEWED FACILITY OPERATING LICENSE NO. DPR-31 AMENDMENT NO. 230 RENEWED FACILITY OPERATING LICENSE NO. DPR-41 DOCKET NOS. 50-250 AND 50-251 Replace Page 3 of Renewed Operating License DPR-31 with the attached Page 3.
Replace Page 3 of Renewed Operating License DPR-41 with the attached Page 3.
Revise the Appendix A Technical Specifications by removing the pages identified below and inserting the attached pages. The revised pages are identified by the captioned amendment number and contain marginal lines indicating the area of change.
REMOVE INSERT 3/4 0-1 3/4 0-1 3/4 0-2 3/4 0-2
3 E. Pursuant to the Act and 10 CFR Parts 40 and 70 to receive, possess, and use at any time 100 milligrams each of any source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactively contaminated apparatus; F. Pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of Turkey Point Units Nos. 3 and 4.
- 3. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations: 10 CFR Part 20, Section 30.34 of 10 CFR Part 30, Section 40.41 of 10 CFR Part 40, Sections 50.54 and 50.59 of 10 CFR Part 50, and Section 70.32 of 10 CFR Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect, and is subject to the additional conditions specified below:
A. Maximum Power Level The applicant is authorized to operate the facility at reactor core power levels not in excess of 2300 megawatts (thermal).
B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 235 are hereby incorporated into this renewed license. The Environmental Protection Plan contained in Appendix B is hereby incorporated into this renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(C) Final Safety Analysis Report The licensees Final Safety Analysis Report supplement submitted pursuant to 10 CFR 54.21(d), as revised on November 1, 2001, describes certain future inspection activities to be completed before the period of extended operation. The licensee shall complete these activities no later than July 19, 2012.
The Final Safety Analysis Report supplement as revised on November 1, 2001, described above, shall be included in the next scheduled update to the Final Safety Analysis Report required by 10 CFR 50.71(e)(4), following the issuance of this renewed license. Until that update is complete, the licensee may make changes to the programs described in such supplement without prior Commission approval, provided that the licensee evaluates each such change pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.
Unit 3 Renewed License No. DPR-31 Amendment No. 235
3 E. Pursuant to the Act and 10 CFR Parts 40 and 70 to receive, possess, and use at any time 100 milligrams each of any source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactively contaminated apparatus; F. Pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of Turkey Point Units Nos. 3 and 4.
- 3. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations: 10 CFR Part 20, Section 30.34 of 10 CFR Part 30, Section 40.41 of 10 CFR Part 40, Sections 50.54 and 50.59 of 10 CFR Part 50, and Section 70.32 of 10 CFR Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect, and is subject to the additional conditions specified below:
A. Maximum Power Level The applicant is authorized to operate the facility at reactor core power levels not in excess of 2300 megawatts (thermal).
B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 230 are hereby incorporated into this renewed license. The Environmental Protection Plan contained in Appendix B is hereby incorporated into this renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
C. Final Safety Analysis Report The licensees Final Safety Analysis Report supplement submitted pursuant to 10 CFR 54.21(d), as revised on November 1, 2001, describes certain future inspection activities to be completed before the period of extended operation. The licensee shall complete these activities no later than April 10, 2013.
The Final Safety Analysis Report supplement as revised on November 1, 2001, described above, shall be included in the next scheduled update to the Final Safety Analysis Report required by 10 CFR 50.71(e)(4), following the issuance of this renewed license. Until that update is complete, the licensee may make changes to the programs described in such supplement without prior Commission approval, provided that the licensee evaluates each such change pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.
Unit 4 Renewed License No. DPR-41 Amendment No. 230
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 235 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-31 AND AMENDMENT NO. 230 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-41 FLORIDA POWER AND LIGHT COMPANY TURKEY POINT PLANT, UNIT NOS. 3 AND 4 DOCKET NOS. 50-250 AND 50-251
1.0 INTRODUCTION
By application dated April 26, 2007 Florida Power and Light Company (FPL, the licensee) requested changes to the Technical Specifications (TSs) for Turkey Point Plant, Units 3 and 4 (Reference 7.1). The staffs proposed no significant hazards consideration determination was published in the Federal Register on July 3, 2007 (72 FR 36522).
The proposed changes would add limiting condition for operation (LCO) 3.0.6 to allow temporary exceptions to TS Actions that require equipment to be taken out of service.
The LCO 3.0.6 exception allows equipment to be temporarily returned to service under administrative controls for the purpose of operability testing.
2.0 REGULATORY EVALUATION
Section 182a of the Atomic Energy Act (the Act) requires applicants for nuclear power plant operating licenses to include TSs as part of the license. The TSs ensure the operational capability of structures, systems, and components that are required to protect the health and safety of the public. The Commissions regulatory requirements related to the content of the TSs are contained in Title 10 of the Code of Federal Regulations (10 CFR), Section 50.36. This regulation requires that the TSs include items in the following categories: (1) Safety limits, limiting safety system settings, and limiting control settings (50.36(c)(1)); (2) Limiting conditions for operation (50.36(c)(2)); (3) Surveillance requirements (50.36(c)(3)); (4) Design features (50.36(c)(4)); and (5) Administrative controls (50.36(c)(5)).
In general there are two classes of changes to TSs: (1) Changes needed to reflect modifications to the design basis (TSs are derived from the design basis), and (2) voluntary changes to take advantage of the evolution in policy and guidance as to the required content and preferred format of TSs over time. This amendment deals with the second class of changes. In determining the acceptability of adding LCO 3.0.6, the staff used the accumulation
of generically approved guidance in NUREG-1431, Revision 3, Standard Technical Specifications for Westinghouse Plants.
Section LCO 3.0, Limiting Condition for Operation Applicability of the TSs establishes general requirements applicable to all TSs unless otherwise stated. In general, these requirements state the relationships between testing, equipment operability, and operational modes.
On August 28, 1990, TS amendments were issued for Turkey Point that approved the use of the standard TS format (Unit 3 Amendment No.137, Unit 4 Amendment 132). Since that time the applicable standard TSs have been improved in response to the evolution of policy and preferred format under NUREG-1431, Standard Technical Specifications for Westinghouse Plants.
The proposed amendment is a request to adopt the improvements provided by NUREG-1431 LCO 3.0.5 to allow equipment that has been removed from service due to TS required ACTIONS to be tested. The sole purpose of this exception is to allow equipment to be returned to service under administrative controls for the purpose of performing testing to demonstrate operability for that or other equipment.
This amendment is consistent with NUREG-1431, and two amendments approved for other plants. Similar changes have been approved on June 16, 1998, for Seabrook Station (Ref. 7.2), and on April 17, 2000, for Milestone Unit 3 (Ref 7.3).
3.0 TECHNICAL EVALUATION
The Turkey Point TS ACTIONS require certain types of equipment to be taken out of service if that or other equipment does not meet operability requirements. TS Actions may require equipment to be de-energized, isolated, locked out, etc. It may be necessary to place that equipment back in service to perform operability testing. NUREG-1431 Revision 3, resolves this issue with LCO 3.0.5, which is a temporary relaxation of the TSs to allow equipment to be returned to service for the purpose of operability testing.
The licensees amendment adds new LCO 3.0.6 that is equivalent to LCO 3.0.5 in the current revision of the Standard Westinghouse TSs. Several minor changes were made to incorporate the new limiting condition into the Turkey Point TS. The new LCO 3.0.6 states:
Equipment removed from service or declared inoperable to comply with ACTION requirements may be returned to service under administrative controls solely to perform testing required to demonstrate its OPERABILITY or the OPERABILITY of other equipment. This is an exception to LCO 3.0.1 and 3.0.2 for the system returned to service under administrative control to perform the testing required to demonstrate OPERABILITY.
References to the new testing exception in LCO 3.0.6 are also made in LCOs 3.0.1 and 3.0.2 as part of this amendment.
The new LCO 3.0.6 is consistent with the current version of Westinghouse Standard TSs, NUREG-1431 Revision 3, and may enhance overall safety by returning systems or components to operable status in a more timely manner. It also has the potential to reduce the regulatory
burden associated with seeking case by case approval to perform appropriate testing not allowed by the current TS. Therefore, the proposed changes are acceptable.
4.0 STATE CONSULTATION
Based upon a letter dated May 2, 2003, from Michael N. Stephens of the Florida Department of Health, Bureau of Radiation Control, to Brenda L. Mozafari, Senior Project Manager, U.S. Nuclear Regulatory Commission, the State of Florida does not desire notification of issuance of license amendments.
5.0 ENVIRONMENTAL CONSIDERATION
This amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that this amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding (72 FR 36522). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
7.0 REFERENCES
7.1 Licensee submittal to incorporate new LCO 3.0.6 Requirements, April 26, 2007 (Agencywide Document Access and Management System (ADAMS) Accession No. ML071280265) 7.2 Safety Evaluation for Amendment No.57, Seabrook Station, June 16, 1998 (ADAMS Accession No. ML011840185) 7.3 Safety Evaluation for Amendment No.179, Millstone Unit 3, April 17, 2000 (ADAMS Accession No. ML003709001)
Principal Contributor: William Cartwright Date: September 5, 2007 Florida Power and Light Company TURKEY POINT PLANT
cc:
Mr. William E. Webster The Capitol Vice President, Nuclear Operations, Tallahassee, Florida 32304 South Region Florida Power & Light Company Michael O. Pearce P.O. Box 14000 Plant General Manager Juno Beach, FL 33408-0420 Turkey Point Nuclear Plant Florida Power and Light Company M. S. Ross, Managing Attorney 9760 SW. 344th Street Florida Power & Light Company Florida City, FL 33035 P.O. Box 14000 Juno Beach, FL 33408-0420 James Connolly, Licensing Manager Florida Power and Light Company Marjan Mashhadi, Senior Attorney Turkey Point Nuclear Plant Florida Power & Light Company 9760 SW. 344th Street 801 Pennsylvania Avenue, NW. Florida City, FL 33035 Suite 220 Washington, DC 20004 Don E. Grissette Vice President, Nuclear Training and William Jefferson, Jr. Performance Improvement Site Vice President Florida Power and Light Company Turkey Point Nuclear Plant P.O. Box 14000 Florida Power and Light Company Juno Beach, FL 33408-0420 9760 SW. 344th Street Florida City, FL 33035 Mr. Rajiv S. Kundalkar Vice President, Nuclear Technical Services County Manager Florida Power & Light Company Miami-Dade County P.O. Box 14000 111 Northwest 1 Street, 29th Floor Juno Beach, FL 33408-0420 Miami, Florida 33128 Senior Resident Inspector Turkey Point Nuclear Plant U.S. Nuclear Regulatory Commission 9762 SW. 344th Street Florida City, Florida 33035 Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida 32399-1741 Mr. Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Attorney General Department of Legal Affairs