 SiteFromIssue dateTitleTopic
ML23291A034Brian Green
NRC/NRR/DRO/IOLB
31 December 20232023 Hfes NRC Slides Regulatory Achievements in Operating, New, and Future Reactor Regulation in the UsExemption Request
ML23291A035NRC/NRR/VPOB
Egli R
31 December 20232023 Hfes NRC Slides Digital and Conventional MCR Designs
ML23277A222Wolfe A
NRC/NRR/DRO/IOLB
31 December 2023Q4 2023 OL Exam, Onsite Validation, and Brq Schedule
SECY-23-0094, Weekly Information Report Week Ending November 3, 2023Marissa Bailey
NRC/EDO/AO
14 November 2023SECY-23-0094: Weekly Information Report Week Ending November 3, 2023Ultimate heat sink
Aging Management
ML23317A071Calvert Cliffs
Dresden
Peach Bottom
Nine Mile Point
Byron
Braidwood
Limerick
Ginna
Clinton
Quad Cities
FitzPatrick
LaSalle
Constellation14 November 2023NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides)
ML23318A028NRC/SECY
Torres M
14 November 2023M231116: Slides - Briefing on Region I Activities and External Engagement Region I Commission M. Torres
IR 05000458/2023003River BendWilliam Schaup
NRC/RGN-IV/DORS/PBC
13 November 2023Integrated Inspection Report 05000458/2023003Time of Discovery
Reactor Vessel Water Level
Ultimate heat sink
Mission time
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
Incorporated by reference
Condition Adverse to Quality
Significance Determination Process
Process Control Program
Operability Determination
Time Critical Operator Action
Maintenance Rule Program
Fire Protection Program
Substantial potential for an overexposure
Downpower
Overexposure
IR 05000498/2023003South TexasPatricia Vossmar
NRC/RGN-IV/DORS/PBA
13 November 2023Integrated Inspection Report 05000498/2023003 and 05000499/2023003, and Notice of ViolationHigh winds
Offsite Dose Calculation Manual
Stroke time
Enforcement Discretion
Functionality Assessment
Condition Adverse to Quality
FLEX
Significance Determination Process
Large early release frequency
Operability Determination
Fire Protection Program
Fire Watch
Siren
ML23311A078Adelaide Giantelli
NRC/NMSS/DMSST/ASPB
13 November 2023STC-23-075 Annual County of Active Radioactive Material Licenses in the NMP
IR 05000454/2023003ByronHironori Peterson
NRC/RGN-III/DORS/RPB3
13 November 2023Integrated Inspection Report 05000454/2023003 and 05000455/2023003 and Exercise of Enforcement DiscretionCommercial Grade Dedication
Enforcement Discretion
Temporary Modification
VT-2
Functionality Assessment
FLEX
B.5.b
Significance Determination Process
Foreign Material Exclusion
Process Control Program
Operability Determination
Fire Protection Program
Hourly Fire Watch
Coast down
ML23312A335Julie Winslow
NRC/NRR/DRO/IOEB
13 November 2023OpESS 2023/02 (Public Draft for Comment) Probabilistic Risk Assessment Configuration ControlProbabilistic Risk Assessment
Surveillance Frequency Control Program
Open Phase Condition
Fire Protection Program
IR 05000390/2023003Watts BarLouis Mckown
Division Reactor Projects II
13 November 2023Integrated Inspection Report 05000390/2023003 and 05000391/2023003 and Apparent ViolationSafe Shutdown
Unanalyzed Condition
Boric Acid
Fire Barrier
Internal Flooding
Past operability
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
FLEX
Significance Determination Process
Annual Radiological Environmental Operating Report
Operability Determination
Fire Protection Program
GOTHIC
Siren
IR 05000275/2023003Diablo CanyonPatricia Vossmar
NRC/RGN-IV/DORS/PBA
13 November 2023Integrated Inspection Report 05000275/2023003 and 05000323/2023003Ultimate heat sink
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
Significance Determination Process
Operability Determination
Offsite Circuit
Fire Protection Program
Siren
IR 05000313/2023003Arkansas NuclearJohn Dixon
NRC/RGN-IV/DORS/PBD
13 November 2023Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001Boric Acid
Stroke time
Enforcement Discretion
Functionality Assessment
FLEX
Job Performance Measure
Operability Determination
Fire Protection Program
Downpower
ML23317A073MillstoneRichard Guzman
NRC/NRR/DORL/LPL1
13 November 2023Acceptance Review Determination - License Amendment Request Modification of TS SR 4.3.6.aSurveillance Frequency Control Program
IR 05000237/2023003DresdenRobert Ruiz
NRC/RGN-III/DORS/RPB1
13 November 2023Integrated Inspection Report 05000237/2023003 and 05000249/2023003 and Exercise of Enforcement DiscretionSafe Shutdown
Ultimate heat sink
Internal Flooding
Enforcement Discretion
Temporary Modification
Functionality Assessment
FLEX
Significance Determination Process
Operability Determination
Spent Fuel Pool Instrumentation
Continuous fire watch
Fire Protection Program
Fire Watch
Substantial potential for an overexposure
Coast down
Overexposure
ML23317A11107000925Cimarron Environmental Response Trust13 November 2023Cimarron Environmental Response Trust - October 18, 2023, Project Status Teleconference Notes
IR 05000272/2023003SalemBrice Bickett
NRC/RGN-I/DORS
13 November 2023Integrated Inspection Report 05000272/2023003 and 05000311/2023003Boric Acid
Temporary Modification
Functionality Assessment
Significance Determination Process
Operability Determination
Maintenance Rule Program
Biofouling
Through Wall Leak
Fire Protection Program
Operability Assessment
IR 05000333/2023003FitzPatrickErin Carfang
NRC/RGN-I/DORS
13 November 2023Integrated Inspection Report 05000333/2023003Commercial Grade Dedication
Enforcement Discretion
Probabilistic Risk Assessment
Functionality Assessment
Condition Adverse to Quality
Missed surveillance
Significance Determination Process
Operability Determination
Battery sizing
Maintenance Rule Program
Fire Protection Program
Power change
Unidentified leakage
IR 05000338/2023003North AnnaNRC Region 2
Matthew Fannon
13 November 2023Integrated Inspection Report 05000338/2023003 and 05000339/2023003Safe Shutdown
Boric Acid
High Radiation Area
Nondestructive Examination
Temporary Modification
Functionality Assessment
FLEX
Process Control Program
Operability Determination
Fire Protection Program
Exclusive Use
ML23317A358HermesNRC/SECY
Carrie Safford
13 November 2023Order (Adopting Transcript Corrections and Admitting Revised Exhibit)
PMNS20231060, Meeting with NuScale Power, LLC on NuScale Standard Design Approval ApplicationOffice of Nuclear Reactor Regulation13 November 2023Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application
PMNS20231061, Meeting with NuScale Power, LLC on NuScale Standard Design Approval ApplicationOffice of Nuclear Reactor Regulation13 November 2023Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application
PMNS20231131, Meeting with NuScale Power, LLC on NuScale Standard Design Approval ApplicationOffice of Nuclear Reactor Regulation13 November 2023Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application
PMNS20231132, Meeting with NuScale Power, LLC on NuScale Standard Design Approval ApplicationOffice of Nuclear Reactor Regulation13 November 2023Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application
PMNS20231133, Meeting with NuScale Power, LLC on NuScale Standard Design Approval ApplicationOffice of Nuclear Reactor Regulation13 November 2023Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application
PMNS20231134, Meeting with NuScale Power, LLC on NuScale Standard Design Approval ApplicationOffice of Nuclear Reactor Regulation13 November 2023Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application
PMNS20231227, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-591Calvert Cliffs
Dresden
Peach Bottom
Nine Mile Point
Byron
Braidwood
Limerick
Ginna
Clinton
Quad Cities
FitzPatrick
LaSalle
Office of Nuclear Reactor Regulation13 November 2023Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-591
ML23317A223Jason Lising
NRC/OCHCO/ADHRTD
12 November 2023OPM-2023 Fevs Agency Results
ML23315A000Lundy Pressley
NRC/NRR/DRA/APOB
10 November 2023Pcc Status - ROP Public Meeting - 16 NOV 23 (003)
ML21200A185Office of Nuclear Material Safety and Safeguards9 November 2023Rulemaking: Final Rule: Part 50 OMB Supporting Statement Emergency Preparedness for Small Modular Reactors and Other New TechnologiesExemption Request
ML21200A190Office of Nuclear Material Safety and Safeguards9 November 2023Rulemaking: Final Rule: Part 52 OMB Supporting Statement Emergency Preparedness for Small Modular Reactors and Other New TechnologiesExemption Request
ML23187A531Deanna Zhang
NRC/NRR/DRO/IQVB
9 November 2023DG-1415 (RG 1.164 Rev 1) Dedication of Commercial-Grade Items for Use in Nuclear Power PlantsIncorporated by reference
Backfit
ML23187A534Deanna Zhang
NRC/NRR/DRO/IQVB
9 November 2023DG-1415 (RG 1.164 Rev 1) Regulatory Analysis
ML23187A549Deanna Zhang
NRC/NRR/DRO/IQVB
9 November 2023DG-1416 - RG 1.234 Rev. 1, Evaluating Deviations and Reporting Defects and Noncompliance Under 10 CFR Part 21Incorporated by reference
ML23187A550Deanna Zhang
NRC/NRR/DRO/IQVB
9 November 2023DG-1416 (RG 1.234) Rev 1 Regulatory Analysis
ML23226A027Office of Nuclear Material Safety and Safeguards9 November 2023Response to SRM-M230814 - Rulemaking - Final Rule - Regulatory Analysis - Emergency Preparedness for Small Modular Reactors and Other New TechnologiesProbabilistic Risk Assessment
License Renewal
Exemption Request
Backfit
Siren
ML23226A031Office of Nuclear Material Safety and Safeguards9 November 2023Response to SRM-M230814 - Rulemaking - Final Rule - Environmental Assessment - Emergency Preparedness for Small Modular Reactors and Other New TechnologiesLicense Renewal
ML23226A036Charles Murray
Office of Nuclear Material Safety and Safeguards
Office of Nuclear Security and Incident Response
9 November 2023Rulemaking - Final Rule - Regulatory Guide - 1.242, Revision 0 - Emergency Preparedness for Small Modular Reactors and Other New TechnologiesUltimate heat sink
Probabilistic Risk Assessment
Safeguards Contingency Plan
ML23229A227Office of Nuclear Material Safety and Safeguards
Office of Nuclear Security and Incident Response
9 November 2023Response to SRM-M230814 - Rulemaking - Final Rule - Comment Response Document - Emergency Preparedness for Small Modular Reactors and Other New TechnologiesUltimate heat sink
Probabilistic Risk Assessment
Safeguards Contingency Plan
Exemption Request
Earthquake
Nuclear Energy Innovation and Modernization Act
Pandemic
Chernobyl
COVID-19
Environmental Justice
Fatality
Siren
IR 05000274/2023203U.S. Geological SurveyTravis Tate
NRC/NRR/DANU/UNPO
9 November 2023United States Geological Survey - U.S. Nuclear Regulatory Commission Security Inspection Report No. 05000274/2023203 (Public)Affidavit