| Site | From | Issue date | Title | Topic |
---|
ML23291A034 | | Brian Green NRC/NRR/DRO/IOLB | 31 December 2023 | 2023 Hfes NRC Slides Regulatory Achievements in Operating, New, and Future Reactor Regulation in the Us | Exemption Request |
ML23291A035 | | NRC/NRR/VPOB Egli R | 31 December 2023 | 2023 Hfes NRC Slides Digital and Conventional MCR Designs | |
ML23277A222 | | Wolfe A NRC/NRR/DRO/IOLB | 31 December 2023 | Q4 2023 OL Exam, Onsite Validation, and Brq Schedule | |
SECY-23-0094, Weekly Information Report Week Ending November 3, 2023 | | Marissa Bailey NRC/EDO/AO | 14 November 2023 | SECY-23-0094: Weekly Information Report Week Ending November 3, 2023 | Ultimate heat sink Aging Management |
ML23317A071 | Calvert Cliffs Dresden Peach Bottom Nine Mile Point Byron Braidwood Limerick Ginna Clinton Quad Cities FitzPatrick LaSalle | Constellation | 14 November 2023 | NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) | |
ML23318A028 | | NRC/SECY Torres M | 14 November 2023 | M231116: Slides - Briefing on Region I Activities and External Engagement Region I Commission M. Torres | |
IR 05000458/2023003 | River Bend | William Schaup NRC/RGN-IV/DORS/PBC | 13 November 2023 | Integrated Inspection Report 05000458/2023003 | Time of Discovery Reactor Vessel Water Level Ultimate heat sink Mission time Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment Incorporated by reference Condition Adverse to Quality Significance Determination Process Process Control Program Operability Determination Time Critical Operator Action Maintenance Rule Program Fire Protection Program Substantial potential for an overexposure Downpower Overexposure |
IR 05000498/2023003 | South Texas | Patricia Vossmar NRC/RGN-IV/DORS/PBA | 13 November 2023 | Integrated Inspection Report 05000498/2023003 and 05000499/2023003, and Notice of Violation | High winds Offsite Dose Calculation Manual Stroke time Enforcement Discretion Functionality Assessment Condition Adverse to Quality FLEX Significance Determination Process Large early release frequency Operability Determination Fire Protection Program Fire Watch Siren |
ML23311A078 | | Adelaide Giantelli NRC/NMSS/DMSST/ASPB | 13 November 2023 | STC-23-075 Annual County of Active Radioactive Material Licenses in the NMP | |
IR 05000454/2023003 | Byron | Hironori Peterson NRC/RGN-III/DORS/RPB3 | 13 November 2023 | Integrated Inspection Report 05000454/2023003 and 05000455/2023003 and Exercise of Enforcement Discretion | Commercial Grade Dedication Enforcement Discretion Temporary Modification VT-2 Functionality Assessment FLEX B.5.b Significance Determination Process Foreign Material Exclusion Process Control Program Operability Determination Fire Protection Program Hourly Fire Watch Coast down |
ML23312A335 | | Julie Winslow NRC/NRR/DRO/IOEB | 13 November 2023 | OpESS 2023/02 (Public Draft for Comment) Probabilistic Risk Assessment Configuration Control | Probabilistic Risk Assessment Surveillance Frequency Control Program Open Phase Condition Fire Protection Program |
IR 05000390/2023003 | Watts Bar | Louis Mckown Division Reactor Projects II | 13 November 2023 | Integrated Inspection Report 05000390/2023003 and 05000391/2023003 and Apparent Violation | Safe Shutdown Unanalyzed Condition Boric Acid Fire Barrier Internal Flooding Past operability Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment FLEX Significance Determination Process Annual Radiological Environmental Operating Report Operability Determination Fire Protection Program GOTHIC Siren |
IR 05000275/2023003 | Diablo Canyon | Patricia Vossmar NRC/RGN-IV/DORS/PBA | 13 November 2023 | Integrated Inspection Report 05000275/2023003 and 05000323/2023003 | Ultimate heat sink Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment Significance Determination Process Operability Determination Offsite Circuit Fire Protection Program Siren |
IR 05000313/2023003 | Arkansas Nuclear | John Dixon NRC/RGN-IV/DORS/PBD | 13 November 2023 | Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 | Boric Acid Stroke time Enforcement Discretion Functionality Assessment FLEX Job Performance Measure Operability Determination Fire Protection Program Downpower |
ML23317A073 | Millstone | Richard Guzman NRC/NRR/DORL/LPL1 | 13 November 2023 | Acceptance Review Determination - License Amendment Request Modification of TS SR 4.3.6.a | Surveillance Frequency Control Program |
IR 05000237/2023003 | Dresden | Robert Ruiz NRC/RGN-III/DORS/RPB1 | 13 November 2023 | Integrated Inspection Report 05000237/2023003 and 05000249/2023003 and Exercise of Enforcement Discretion | Safe Shutdown Ultimate heat sink Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment FLEX Significance Determination Process Operability Determination Spent Fuel Pool Instrumentation Continuous fire watch Fire Protection Program Fire Watch Substantial potential for an overexposure Coast down Overexposure |
ML23317A111 | 07000925 | Cimarron Environmental Response Trust | 13 November 2023 | Cimarron Environmental Response Trust - October 18, 2023, Project Status Teleconference Notes | |
IR 05000272/2023003 | Salem | Brice Bickett NRC/RGN-I/DORS | 13 November 2023 | Integrated Inspection Report 05000272/2023003 and 05000311/2023003 | Boric Acid Temporary Modification Functionality Assessment Significance Determination Process Operability Determination Maintenance Rule Program Biofouling Through Wall Leak Fire Protection Program Operability Assessment |
IR 05000333/2023003 | FitzPatrick | Erin Carfang NRC/RGN-I/DORS | 13 November 2023 | Integrated Inspection Report 05000333/2023003 | Commercial Grade Dedication Enforcement Discretion Probabilistic Risk Assessment Functionality Assessment Condition Adverse to Quality Missed surveillance Significance Determination Process Operability Determination Battery sizing Maintenance Rule Program Fire Protection Program Power change Unidentified leakage |
IR 05000338/2023003 | North Anna | NRC Region 2 Matthew Fannon | 13 November 2023 | Integrated Inspection Report 05000338/2023003 and 05000339/2023003 | Safe Shutdown Boric Acid High Radiation Area Nondestructive Examination Temporary Modification Functionality Assessment FLEX Process Control Program Operability Determination Fire Protection Program Exclusive Use |
ML23317A358 | Hermes | NRC/SECY Carrie Safford | 13 November 2023 | Order (Adopting Transcript Corrections and Admitting Revised Exhibit) | |
PMNS20231060, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application | | Office of Nuclear Reactor Regulation | 13 November 2023 | Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application | |
PMNS20231061, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application | | Office of Nuclear Reactor Regulation | 13 November 2023 | Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application | |
PMNS20231131, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application | | Office of Nuclear Reactor Regulation | 13 November 2023 | Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application | |
PMNS20231132, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application | | Office of Nuclear Reactor Regulation | 13 November 2023 | Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application | |
PMNS20231133, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application | | Office of Nuclear Reactor Regulation | 13 November 2023 | Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application | |
PMNS20231134, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application | | Office of Nuclear Reactor Regulation | 13 November 2023 | Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application | |
PMNS20231227, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-591 | Calvert Cliffs Dresden Peach Bottom Nine Mile Point Byron Braidwood Limerick Ginna Clinton Quad Cities FitzPatrick LaSalle | Office of Nuclear Reactor Regulation | 13 November 2023 | Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-591 | |
ML23317A223 | | Jason Lising NRC/OCHCO/ADHRTD | 12 November 2023 | OPM-2023 Fevs Agency Results | |
ML23315A000 | | Lundy Pressley NRC/NRR/DRA/APOB | 10 November 2023 | Pcc Status - ROP Public Meeting - 16 NOV 23 (003) | |
ML21200A185 | | Office of Nuclear Material Safety and Safeguards | 9 November 2023 | Rulemaking: Final Rule: Part 50 OMB Supporting Statement Emergency Preparedness for Small Modular Reactors and Other New Technologies | Exemption Request |
ML21200A190 | | Office of Nuclear Material Safety and Safeguards | 9 November 2023 | Rulemaking: Final Rule: Part 52 OMB Supporting Statement Emergency Preparedness for Small Modular Reactors and Other New Technologies | Exemption Request |
ML23187A531 | | Deanna Zhang NRC/NRR/DRO/IQVB | 9 November 2023 | DG-1415 (RG 1.164 Rev 1) Dedication of Commercial-Grade Items for Use in Nuclear Power Plants | Incorporated by reference Backfit |
ML23187A534 | | Deanna Zhang NRC/NRR/DRO/IQVB | 9 November 2023 | DG-1415 (RG 1.164 Rev 1) Regulatory Analysis | |
ML23187A549 | | Deanna Zhang NRC/NRR/DRO/IQVB | 9 November 2023 | DG-1416 - RG 1.234 Rev. 1, Evaluating Deviations and Reporting Defects and Noncompliance Under 10 CFR Part 21 | Incorporated by reference |
ML23187A550 | | Deanna Zhang NRC/NRR/DRO/IQVB | 9 November 2023 | DG-1416 (RG 1.234) Rev 1 Regulatory Analysis | |
ML23226A027 | | Office of Nuclear Material Safety and Safeguards | 9 November 2023 | Response to SRM-M230814 - Rulemaking - Final Rule - Regulatory Analysis - Emergency Preparedness for Small Modular Reactors and Other New Technologies | Probabilistic Risk Assessment License Renewal Exemption Request Backfit Siren |
ML23226A031 | | Office of Nuclear Material Safety and Safeguards | 9 November 2023 | Response to SRM-M230814 - Rulemaking - Final Rule - Environmental Assessment - Emergency Preparedness for Small Modular Reactors and Other New Technologies | License Renewal |
ML23226A036 | | Charles Murray Office of Nuclear Material Safety and Safeguards Office of Nuclear Security and Incident Response | 9 November 2023 | Rulemaking - Final Rule - Regulatory Guide - 1.242, Revision 0 - Emergency Preparedness for Small Modular Reactors and Other New Technologies | Ultimate heat sink Probabilistic Risk Assessment Safeguards Contingency Plan |
ML23229A227 | | Office of Nuclear Material Safety and Safeguards Office of Nuclear Security and Incident Response | 9 November 2023 | Response to SRM-M230814 - Rulemaking - Final Rule - Comment Response Document - Emergency Preparedness for Small Modular Reactors and Other New Technologies | Ultimate heat sink Probabilistic Risk Assessment Safeguards Contingency Plan Exemption Request Earthquake Nuclear Energy Innovation and Modernization Act Pandemic Chernobyl COVID-19 Environmental Justice Fatality Siren |
IR 05000274/2023203 | U.S. Geological Survey | Travis Tate NRC/NRR/DANU/UNPO | 9 November 2023 | United States Geological Survey - U.S. Nuclear Regulatory Commission Security Inspection Report No. 05000274/2023203 (Public) | Affidavit |