IR 05000255/2018412

From kanterella
Jump to navigation Jump to search
NRC Security Baseline Inspection Report 05000255/2018412 (Cover Letter Only) (DRS-N.Egan)
ML19009A457
Person / Time
Site: Palisades Entergy icon.png
Issue date: 01/09/2019
From: Steven Orth
Plant Support Branch II
To: Arnone C
Entergy Nuclear Operations
References
IR 2018412
Download: ML19009A457 (3)


Text

ary 9, 2019

SUBJECT:

PALISADES NUCLEAR PLANTNRC SECURITY BASELINE INSPECTION REPORT 05000255/2018412

Dear Mr. Arnone:

On October 26, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a Security Inspection at your Palisades Nuclear Plant. On November 29, 2018, the NRC inspector discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

The inspector documented one NRC-identified finding of very-low security significance (Green)

in this report. This finding involved a violation of NRC requirements. The NRC is treating this violation as a Non-Cited Violation consistent with Section 2.3.2.a of the Enforcement Policy.

One cross-cutting aspect was assigned to the above finding in the area of Human Performance - Bases for Decisions. Specifically, leaders failed to ensure that the bases for operational and organizational decisions are communicated in a timely manner [H.10].

If you contest the violation or significance of the Non-Cited Violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555 0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement; and the NRC Resident Inspector at the Palisades Nuclear Plant.

If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; and the NRC Resident Inspector at the Palisades Nuclear Plant.

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (CFR), Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-255 License No. DPR-20 Enclosure:

Inspection Report 05000255/2018412 cc: D. Asselin, State Liaison Officer, State of Michigan cc w/o encl: Distribution via LISTSERV