1CAN071802, Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (1R27)

From kanterella
Jump to navigation Jump to search
Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (1R27)
ML18211A300
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 07/25/2018
From: Pyle S
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
1CAN071802
Download: ML18211A300 (6)


Text

~Entergy Entergy Operations, Inc.

1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4704 Stephenie L. Pyle Manager, Regulatory Assurance Arkansas Nuclear One 1CAN071802 July 25, 2018 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

lnservice Inspection Summary Report ,for the Twenty-Seventh Refueling Outage (1 R27) '

Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51

Dear Sir or Madam:

Article IWA-6000 of Section XI of the 2007 Edition with the 2008 Addenda of the American Society of Mechanical Engineers (ASME) Code requires an inservice inspection summary report be submitted by the regulatory and enforcement authorities having jurisdiction at the plant site.

The summary report is to contain the completed Form NIS-1, "Owner's Report for lnservice Inspection," and Form NIS-2, "Owner's Report for Repair or Replacement Activity." This 2007 Edition with the 2008 Addenda of the ASME Code is the code of record for the fifth 10-year interval at Arkansas Nuclear One, Unit-1 (AN0-1).

ASME Code Case N-532 allows Entergy Operations, Inc., to prepare an Owner's Activity Report Form OAR-1 in place of the code-required NIS-1 and NIS-2 forms. The latest revision of this code case used in this report, N-532-5, is listed in Regulatory Guide (RG) 1.147, "In service Inspection Code Case Acceptability, ASME Section XI, Division 1," Revision 18, Table 1, r

"Acceptable Section XI Code Cases." Therefore, prior NRC approval to implement this code case is not required.

(

This report is to be prepared at the completion of a refueling outage and submitted within 90 calendar days of the completion of the refueling outage. In this case the report is to the twenty-seventh refueling outage for AN0-1 (1 R27). This outage was completed on May 22, 2018.

Enclosed is the completed Form OAR-1 'for 1R27 for your information. Included with the form are tables listing the "Items with Flaws or Relevant Conditions Required Evaluation for Continued Service" and "Abstract of Repair/ Replacement Activities Required for Continued Service" in accordance with Code Case N-532-5. The results that are contained in this submittal are for 1R27.

1CAN071802 Page 2 of 2 This letter contains no new commitments.

By means of this submittal, the reporting requirements of the ASME Code, Section XI, Article IWA-6000 are fulfilled for 1R27.

Should you have any questions regarding this submittal, please contact me.

SLP/rwc

Enclosure:

Form OAR-1, Owner's Activity Report {

cc: Mr. Kriss M. Kennedy Regional Administrator

- U.S. Nuclear Regulatory Commission Region IV 1600 East l:.amar Boulevard Arlington, TX 76011-4511 NRG Senior Resident Inspector Arkansas Nuclear One P. 0. Box 310 London, AR 72847 U.S. Nuclear Regulatory Commission Attn: Mr. Thomas Wengert MS 0-8B1A One White Flint North 11555 Rockville Pike Rockville, MD 20852

ENCLOSURE TO 1CAN071802 Form OAR-1 Owner's Activity Report

\

FORM OAR-1 OWNERS ACTIVITY REPORT Report Number: _ _. , O:. :. A_,_,R. ,_*. .,1. :5. :.1. ,_1_ __,__ Page _I_ of _3_

Plant: --~A~r~ka=n~s...a=s.....N"""'u=c""'le=a=r""'O""'n-'-'e"""'/c....1.,_4.,__4,.,8'--'S=."""R:.:..-=3=3=3,L-'R'-'=us=s:.::e=llv.,_,i=l e=,..:.A..::R..,,.'-'7'-"2=8=0=2c......_ _ _ _ _ _ _ __

Unit No: _ _1.__ Commercial Service Date: December 19, 1974 Refueling Outage No.: 1 R27 (if applicable)

Current Inspection Interval: -~F....if~th'"'--'(5=t=h_,_)__ln'""s=p=e=c~ti=o__,n'"""l""'n"""te""'rv"'""'a,_I- - - - - - - - - - - - - - - -

(1st, 2nd, 3rd, 4th, Other)

Current Inspection Period: _ _,_F.., irc,:s,. .t. ._(1.,_,s""t"--).!!ln.,,s,.,p,.,,e""c"'ti_,._o:.:.n_,_P..,e""r~io..,.d.__________________

(1st. 2nd, 3rd)

Edition and Addenda of Section XI applicable to the Inspection Plans: 2007 Edition with 2008 Addenda Date and Revision of Inspection Plans: August 23, 2017 / Revision 4 (SEP-IS1-AN01-101)

Ed!!l_on and Addenda of Section XI applicable to repair/replacement activities, if different than the Inspection Plans: -=S~a""'m~e,___ _

Code Cases used for inspection and evaluation: ...,,.,..:.N..:.,*,:::5'-'-1,:::3'-:,'-3""--'N,::.*..::5.,,3..,2,._*5=-,,.,,...,.,.....,,-~~....,.,..-...,..,--,----

(if applicable, including cases modified by Case N-532 and later revisions)

CERTIFICATE OF CONFORMANCE l,

I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 1R27 conform to the requirements of Section XI.

(refueling outage number)

Signed: c;....._{)4.A!~ OwnerorOwner's!::ig:Aue£:fJCr.rtJ~ER Date: 7 - ,J-/

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of_

Hartford Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or prope.,,rt~r loss of any kind arising from or connected with this inspection.

__4_l}-C) ___________Commissions: #14374 I.N.R

  • Inspector's Signature {National Board Number and Endorsement)

Date: _ _ _ o_,_/_11_/_tf____

FORM OAR-1 OWNERS ACTIVITY REPORT Report Number: ---=O""'"A--"RC.:..-.C-1'-"'5'--1--'1_ _ _ _ __ Page _L of __J_

Plant: -----'A"""r~k=a'-'-ns=a=s'"""'N~uc=l=ea=r---'O""n"'"'e,._.,_/-'-14-'-4..,_,8=-=S,_,_.R_..._.3=3=3.._,.,_,R=u=ss=e=ll:..:..v=il =e,_,,A'"'"R'-'-'-.7.,_,2=8=0=2.___ _ _ _ _ _ __

Unit No: __1.,____ Commercial Service Date: December 19. 1974 Refueling Outage No.: 1R-27 (if applicable)

TABLE 1:

ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Item Description Evaluation Description Category and Item Number C-H CV-1407 valve replacement weld See Operability evaluation CR-AN0-1-2018-01591 end prep on the up-stream side on C7.10 the existing piping, pitting was identified in the weld prep area of the ID.*

D-B Perform a base metal repair BMR-1 See Operability evaluation CR-ANO-C-2018-01743 on the inside of existing Service DZ.JO Water pipe spool*

B-J CCA-5-2 1/2". Install Plug per EC- See Operability evaluation CR-ANO-C-2018-03567 7 817 6 due to cracked weld**

B9.40 B-J Replace tubing adapter for leak See Operability evaluation CR-AN0-1-2018-03738 repair***

B9.40 E-A Re-evaluation of the degraded liner EC-76205 plate El.11

  • Item was Repaired/Replaced during 1R27 refueling outage
    • Item was Repaired/Replaced during 1F018-01
      • Item was Repaired/Replaced during IF018-02

)

FORM OAR-1 OWNERS ACTIVITY REPORT Report Number: -~O~A~R~-~1~5~1~1_ _ _ _ __ Page _J_ of _J_

Plant: ----<A_,.,r..,_,k"'"an'""s""a:,::s'--'N-'-'u,,_,c"""le,,_,a,,.,r...,O~n'-"e=<-/._1..,_4..,_4.,_,,8::..:S=<-.:.1.R.!!.*. >:3, ,3""3.._;,__,R"""us,,_,s, _., e<!!l -"'vi"'"l e, ,.1,...,A_,.,R'-'-'-.7,_.2:..,8,,..,,0""2,___ _ _ _ _ _ __

Unit No: _ _1.,__ _ Commercial Service Date: December 19, 1974 Refueling Outage No.: 1R-27 (if applicable)

TABLE 2:

ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Item Description Description of Work Date Repair/Replacement Class Completed Plan Number 3 E-176 REPLACE CONDENSOR 6-6-18 247760-01 2 PSS penetration Replace Penetration Flued Head 5-23-18 475837-03 2 P63 penetration Replace Penetration Flued Head 5-23-18 475837-04 2 CV1407 Replace CV-1407 Valve 5-11-18 409632-20 2 CV1407 Replace CV-1407 Valve Piping (Elbow to Tee) 5-11-18 409632-37 2 VCC-2A/B Replace HBB-3-10" SW Return Piping located in 7-5-18 475840-02 the Aux Bldg for VCC-2A and VCC-28. Piping replacement to be from P-63 penetration to CV-3814 Valve and replace piping to Item# 4 on HBD-21-10" Tee.

7-5-18 2 I HBB-3 PIPE Replace Service Water Supply Piping located 475840-01 inside the Aux Bldg for VCC-2A and VCC-2B.

Piping replacement to be from CV-3812 Valve to P-55 Penetration.

5-21-18 I DH-17 DH-17 (check valve) replacement 418605-01 5-21-18 I DH-18 DH-18 (check valve) replacement 418604-01 4-30-18 T3 HBD-14-18 Replace section of pipe on HBD-15-18" SW Piping 440605-01 between FW-66 and Vendor Weld 2 shown on Dwg 13-SW-134 R-1 I CROM #52 flange bolt & nut ring segment 5-29-18 466956-14 replacement R-1 I CRDM #47 flange bolt & nut ring segment 5-29-18 466956-14 replacement R-1

[ CROM #51 flange bolt & nut ring segment 5-29-18 466956-14 replacement

[ CV-1216 Replaced Disk 5-9-18 353893-30 2 CV-1234 Replaced Disc 5-14-18 500437-11 2 CV-1234 Replaced Bonnet 5-14-18 461871-03 I CV-1214 Replaced Disc 5-9-18 353895-03 I CRDM-67 Replace CRDM-67 Closure insert Assembly 5-29-18 482542-13 I CRDM-7 Replace CROM-7 Closure Insert Assembly 5-29-18 482542-13 T3 lHBD-21-14" Piping IHBD-21-14" Piping replacement 5-14-18 460878-01