MONTHYEAR2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)2023-08-10010 August 2023 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)2023-03-20020 March 2023 Inspection Summary Report for the Thirtieth Refueling Outage (1R30) 2CAN052202, Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage (2R28) - Revision 12022-05-31031 May 2022 Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage (2R28) - Revision 1 ML22126A0332022-05-10010 May 2022 Review of the Spring 2021 Steam Generator Tube Inspections During Refueling Outage 1R29 2CAN022201, Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage (2R28)2022-02-0808 February 2022 Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage (2R28) ML22034A8992022-02-0303 February 2022 Steam Generator Tube Inspection Reports in Support of TSTF-577 1CAN102104, Steam Generator Tube Inspection Report - 1R292021-10-22022 October 2021 Steam Generator Tube Inspection Report - 1R29 2CAN082103, Unit 2 - Fifth 10-Year Interval Snubber Program Plan2021-08-31031 August 2021 Unit 2 - Fifth 10-Year Interval Snubber Program Plan 1CAN072102, Inservice Inspection Summary Report for the Twenty-Ninth Refueling Outage (1R29)2021-07-19019 July 2021 Inservice Inspection Summary Report for the Twenty-Ninth Refueling Outage (1R29) 2CAN122001, Submittal of 40-Year Containment Building Tendon Surveillance and Concrete Inspection2020-12-0404 December 2020 Submittal of 40-Year Containment Building Tendon Surveillance and Concrete Inspection 2CAN112005, Unit 2 - Inservice Testing Plan for the Fifth 10-Year Interval2020-11-24024 November 2020 Unit 2 - Inservice Testing Plan for the Fifth 10-Year Interval 2CAN072001, Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (2R27)2020-07-0808 July 2020 Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (2R27) 1CAN012004, Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage2020-01-28028 January 2020 Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage 2CAN091901, Entergy Operations, Inc. - Request for Alternatives Subject to the Fifth 10-Year Interval of the Inservice Testing Program2019-09-0303 September 2019 Entergy Operations, Inc. - Request for Alternatives Subject to the Fifth 10-Year Interval of the Inservice Testing Program 2CAN021906, Steam Generator Tube Inspection Report2019-02-28028 February 2019 Steam Generator Tube Inspection Report 2CAN011903, Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage2019-01-23023 January 2019 Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage 1CAN101802, Submittal of 45th-Year Reactor Building Inspection Report2018-10-10010 October 2018 Submittal of 45th-Year Reactor Building Inspection Report 1CAN091802, Snubber Testing Program for Fifth Inservice Test Interval2018-09-24024 September 2018 Snubber Testing Program for Fifth Inservice Test Interval 1CAN081808, Inservice Testing Plan for the Fifth 10-Year Interval2018-08-27027 August 2018 Inservice Testing Plan for the Fifth 10-Year Interval 1CAN071802, Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (1R27)2018-07-25025 July 2018 Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (1R27) 2CAN101701, Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (2R25)2017-10-0606 October 2017 Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (2R25) 1CAN091703, Inservice Inspection, Pressure Test and Containment Inservice Inspection Program Plans for the Fifth 10-Year Interval2017-09-21021 September 2017 Inservice Inspection, Pressure Test and Containment Inservice Inspection Program Plans for the Fifth 10-Year Interval 1CAN031703, Steam Generator Tube Inspection Report - 1R262017-03-22022 March 2017 Steam Generator Tube Inspection Report - 1R26 1CAN031702, Reactor Building Inspection Summary Report - 1R262017-03-14014 March 2017 Reactor Building Inspection Summary Report - 1R26 1CAN031705, Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage (1R26)2017-03-14014 March 2017 Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage (1R26) 1CAN111602, Fifth Ten-Year Interval Inservice Testing Program, Relief Request VRR-ANO1-2017-12016-11-16016 November 2016 Fifth Ten-Year Interval Inservice Testing Program, Relief Request VRR-ANO1-2017-1 1CAN011602, Amended Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (1R25)2016-01-18018 January 2016 Amended Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (1R25) 1CAN051502, Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (1R25)2015-05-28028 May 2015 Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (1R25) 2CAN011503, Year Containment Building Tendon Surveillance and Concrete Inspection2015-01-16016 January 2015 Year Containment Building Tendon Surveillance and Concrete Inspection 2CAN081406, Inservice Inspection Summary Report for the Twenty-Third Refueling Outage (2R23)2014-08-21021 August 2014 Inservice Inspection Summary Report for the Twenty-Third Refueling Outage (2R23) 2CAN081404, Steam Generator Tube Inspection Report - 2R232014-08-18018 August 2014 Steam Generator Tube Inspection Report - 2R23 1CAN111301, Revised Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24)2013-11-0505 November 2013 Revised Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24) 1CAN101306, Unit 1, Steam Generator Tube Inspection Report - 1R242013-10-23023 October 2013 Unit 1, Steam Generator Tube Inspection Report - 1R24 1CAN101304, Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24)2013-10-21021 October 2013 Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24) 1CAN101301, Request for Relief from Volumetric Examination Frequency Requirements, Request for Relief ANO1-ISI-0232013-10-0808 October 2013 Request for Relief from Volumetric Examination Frequency Requirements, Request for Relief ANO1-ISI-023 1CAN041305, Unit 1, Response to Request for Additional Information Related to Fall 2011 Steam Generator Tube Inservice Inspections2013-04-30030 April 2013 Unit 1, Response to Request for Additional Information Related to Fall 2011 Steam Generator Tube Inservice Inspections 2CAN121204, Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (2R22)2012-12-13013 December 2012 Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (2R22) 1CAN031203, Unit 1, Steam Generator Tube Inspection Report - 1R232012-03-22022 March 2012 Unit 1, Steam Generator Tube Inspection Report - 1R23 2CAN051102, Inservice Inspection Summary Report for the Twenty-First Refueling Outage2011-05-25025 May 2011 Inservice Inspection Summary Report for the Twenty-First Refueling Outage 2CAN011105, Program Section SEP-ISI-105 for ASME Section XI, Division 1, Arkansas Nuclear One, Unit 2, Inservice Inspection Program2011-01-25025 January 2011 Program Section SEP-ISI-105 for ASME Section XI, Division 1, Arkansas Nuclear One, Unit 2, Inservice Inspection Program ML1036305792010-12-29029 December 2010 Notification of Inspection (NRC Inspection Report 050-368/2011002) and Request for Information ML1022504182010-07-29029 July 2010 Steam Generator Tube Inspection Report - 1R22 1CAN061004, Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (1R22)2010-06-29029 June 2010 Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (1R22) 2CAN031006, Inservice Testing Plan for the Fourth 10-Year Interval2010-03-25025 March 2010 Inservice Testing Plan for the Fourth 10-Year Interval 1CAN021002, Response to Second Set of Requests for Additional Information on the Third 10-Year Inservice Inspection Interval Relief Requests2010-02-0909 February 2010 Response to Second Set of Requests for Additional Information on the Third 10-Year Inservice Inspection Interval Relief Requests 2CAN120901, Inservice Inspection Summary Report for the Twentieth Refueling Outage (2R20)2009-12-0707 December 2009 Inservice Inspection Summary Report for the Twentieth Refueling Outage (2R20) 1CAN030907, Steam Generator Tube Inspection Report - 1R212009-03-30030 March 2009 Steam Generator Tube Inspection Report - 1R21 1CAN030902, Inservice Inspection Summary Report for the Twenty-First Refueling Outage (1R21)2009-03-0404 March 2009 Inservice Inspection Summary Report for the Twenty-First Refueling Outage (1R21) CNRO-2009-00002, Relief Request CEP-ISI-011 for Third 120 Month Inservice Inspection Interval2009-03-0404 March 2009 Relief Request CEP-ISI-011 for Third 120 Month Inservice Inspection Interval 2CAN070802, Inservice Inspection Summary Report for the Nineteenth Refueling Outage (2R19)2008-07-0101 July 2008 Inservice Inspection Summary Report for the Nineteenth Refueling Outage (2R19) 2023-08-10
[Table view] Category:Letter type:
MONTHYEAR2CAN012401, U.S. Additional Protocol2024-01-17017 January 2024 U.S. Additional Protocol 2CAN012403, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42024-01-11011 January 2024 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN012401, Registration of Cask Use2024-01-10010 January 2024 Registration of Cask Use 1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037)2023-12-14014 December 2023 Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037) 2CAN112302, Submittal of Amendment 31 to Safety Analysis Report2023-11-16016 November 2023 Submittal of Amendment 31 to Safety Analysis Report 0CAN102303, Registration of Cask Use2023-10-24024 October 2023 Registration of Cask Use 0CAN102302, (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 32023-10-11011 October 2023 (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 3 0CAN102301, Evacuation Time Estimate (ETE) Study2023-10-0404 October 2023 Evacuation Time Estimate (ETE) Study 1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-09-21021 September 2023 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN092302, Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2023-09-14014 September 2023 Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 2CAN092301, Reply to a Notice of Violation2023-09-0808 September 2023 Reply to a Notice of Violation 0CAN092301, Emergency Plan Implementing Procedure Revision2023-09-0505 September 2023 Emergency Plan Implementing Procedure Revision 0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 03412023-08-17017 August 2023 Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)2023-08-10010 August 2023 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) 0CAN072301, Registration of Cask Use2023-07-18018 July 2023 Registration of Cask Use 1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2023-06-29029 June 2023 Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 0CAN062301, Status of Actions to Return to Compliance2023-06-26026 June 2023 Status of Actions to Return to Compliance 0CAN062302, Submittal of Revision 22 of the ANO Fire Hazards Analysis2023-06-20020 June 2023 Submittal of Revision 22 of the ANO Fire Hazards Analysis 1CAN062301, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037)2023-06-0808 June 2023 Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037) 0CAN052303, Annual 10 CFR 50.46 Report for Calendar Year 20222023-05-24024 May 2023 Annual 10 CFR 50.46 Report for Calendar Year 2022 0CAN052302, Emergency Plan Rev. 482023-05-11011 May 2023 Emergency Plan Rev. 48 0CAN052301, Units 1 and 2 - Annual Radiological Environmental Operating Report for 20222023-05-0909 May 2023 Units 1 and 2 - Annual Radiological Environmental Operating Report for 2022 2CAN052301, Cycle 30 Core Operating Limits Report (COLR)2023-05-0303 May 2023 Cycle 30 Core Operating Limits Report (COLR) 0CAN042302, Annual Occupational Radiation Exposure Report for 20222023-04-27027 April 2023 Annual Occupational Radiation Exposure Report for 2022 0CAN042301, Radioactive Effluent Release Report for 20222023-04-14014 April 2023 Radioactive Effluent Release Report for 2022 2CAN042301, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-04-0505 April 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 2CAN032303, Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032304, Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)2023-03-20020 March 2023 Inspection Summary Report for the Thirtieth Refueling Outage (1R30) 1CAN012301, Responses to Request for Additional Information for Request for Relief ANO1-ISI-0352023-01-30030 January 2023 Responses to Request for Additional Information for Request for Relief ANO1-ISI-035 2CAN012303, U.S. Additional Protocol2023-01-23023 January 2023 U.S. Additional Protocol 2CAN012302, Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-01-20020 January 2023 Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN122202, Registration of Cask Use2022-12-21021 December 2022 Registration of Cask Use 0CAN122201, Reply to a Notice of Violation; EA-22-0992022-12-0808 December 2022 Reply to a Notice of Violation; EA-22-099 0CAN112201, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2022-11-10010 November 2022 Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 1CAN102202, Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2022-10-31031 October 2022 Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 1CAN102203, Cycle 31 Core Operating Limits Report2022-10-24024 October 2022 Cycle 31 Core Operating Limits Report 1CAN102201, Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-10-13013 October 2022 Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 0CAN092201, Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-09-29029 September 2022 Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN092201, Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-09-0808 September 2022 Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 0CAN082201, License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-08-30030 August 2022 License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN082201, Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-08-24024 August 2022 Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 2CAN072201, Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods2022-07-20020 July 2022 Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods 0CAN072201, Registration of Cask Use2022-07-14014 July 2022 Registration of Cask Use 0CAN062202, Registration of Cask Use2022-06-0909 June 2022 Registration of Cask Use 1CAN062201, Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-06-0202 June 2022 Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 1CAN052201, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-0352022-05-31031 May 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-035 2024-01-17
[Table view] |
Text
~Entergy Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4704 Stephenie L. Pyle Manager, Regulatory Assurance Arkansas Nuclear One 1CAN071802 July 25, 2018 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
lnservice Inspection Summary Report ,for the Twenty-Seventh Refueling Outage (1 R27) '
Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51
Dear Sir or Madam:
Article IWA-6000 of Section XI of the 2007 Edition with the 2008 Addenda of the American Society of Mechanical Engineers (ASME) Code requires an inservice inspection summary report be submitted by the regulatory and enforcement authorities having jurisdiction at the plant site.
The summary report is to contain the completed Form NIS-1, "Owner's Report for lnservice Inspection," and Form NIS-2, "Owner's Report for Repair or Replacement Activity." This 2007 Edition with the 2008 Addenda of the ASME Code is the code of record for the fifth 10-year interval at Arkansas Nuclear One, Unit-1 (AN0-1).
ASME Code Case N-532 allows Entergy Operations, Inc., to prepare an Owner's Activity Report Form OAR-1 in place of the code-required NIS-1 and NIS-2 forms. The latest revision of this code case used in this report, N-532-5, is listed in Regulatory Guide (RG) 1.147, "In service Inspection Code Case Acceptability, ASME Section XI, Division 1," Revision 18, Table 1, r
"Acceptable Section XI Code Cases." Therefore, prior NRC approval to implement this code case is not required.
(
This report is to be prepared at the completion of a refueling outage and submitted within 90 calendar days of the completion of the refueling outage. In this case the report is to the twenty-seventh refueling outage for AN0-1 (1 R27). This outage was completed on May 22, 2018.
Enclosed is the completed Form OAR-1 'for 1R27 for your information. Included with the form are tables listing the "Items with Flaws or Relevant Conditions Required Evaluation for Continued Service" and "Abstract of Repair/ Replacement Activities Required for Continued Service" in accordance with Code Case N-532-5. The results that are contained in this submittal are for 1R27.
1CAN071802 Page 2 of 2 This letter contains no new commitments.
By means of this submittal, the reporting requirements of the ASME Code, Section XI, Article IWA-6000 are fulfilled for 1R27.
Should you have any questions regarding this submittal, please contact me.
SLP/rwc
Enclosure:
Form OAR-1, Owner's Activity Report {
cc: Mr. Kriss M. Kennedy Regional Administrator
- U.S. Nuclear Regulatory Commission Region IV 1600 East l:.amar Boulevard Arlington, TX 76011-4511 NRG Senior Resident Inspector Arkansas Nuclear One P. 0. Box 310 London, AR 72847 U.S. Nuclear Regulatory Commission Attn: Mr. Thomas Wengert MS 0-8B1A One White Flint North 11555 Rockville Pike Rockville, MD 20852
ENCLOSURE TO 1CAN071802 Form OAR-1 Owner's Activity Report
\
FORM OAR-1 OWNERS ACTIVITY REPORT Report Number: _ _. , O:. :. A_,_,R. ,_*. .,1. :5. :.1. ,_1_ __,__ Page _I_ of _3_
Plant: --~A~r~ka=n~s...a=s.....N"""'u=c""'le=a=r""'O""'n-'-'e"""'/c....1.,_4.,__4,.,8'--'S=."""R:.:..-=3=3=3,L-'R'-'=us=s:.::e=llv.,_,i=l e=,..:.A..::R..,,.'-'7'-"2=8=0=2c......_ _ _ _ _ _ _ __
Unit No: _ _1.__ Commercial Service Date: December 19, 1974 Refueling Outage No.: 1 R27 (if applicable)
Current Inspection Interval: -~F....if~th'"'--'(5=t=h_,_)__ln'""s=p=e=c~ti=o__,n'"""l""'n"""te""'rv"'""'a,_I- - - - - - - - - - - - - - - -
(1st, 2nd, 3rd, 4th, Other)
Current Inspection Period: _ _,_F.., irc,:s,. .t. ._(1.,_,s""t"--).!!ln.,,s,.,p,.,,e""c"'ti_,._o:.:.n_,_P..,e""r~io..,.d.__________________
(1st. 2nd, 3rd)
Edition and Addenda of Section XI applicable to the Inspection Plans: 2007 Edition with 2008 Addenda Date and Revision of Inspection Plans: August 23, 2017 / Revision 4 (SEP-IS1-AN01-101)
Ed!!l_on and Addenda of Section XI applicable to repair/replacement activities, if different than the Inspection Plans: -=S~a""'m~e,___ _
Code Cases used for inspection and evaluation: ...,,.,..:.N..:.,*,:::5'-'-1,:::3'-:,'-3""--'N,::.*..::5.,,3..,2,._*5=-,,.,,...,.,.....,,-~~....,.,..-...,..,--,----
(if applicable, including cases modified by Case N-532 and later revisions)
CERTIFICATE OF CONFORMANCE l,
I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 1R27 conform to the requirements of Section XI.
(refueling outage number)
Signed: c;....._{)4.A!~ OwnerorOwner's!::ig:Aue£:fJCr.rtJ~ER Date: 7 - ,J-/
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of_
Hartford Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or prope.,,rt~r loss of any kind arising from or connected with this inspection.
__4_l}-C) ___________Commissions: #14374 I.N.R
- Inspector's Signature {National Board Number and Endorsement)
Date: _ _ _ o_,_/_11_/_tf____
FORM OAR-1 OWNERS ACTIVITY REPORT Report Number: ---=O""'"A--"RC.:..-.C-1'-"'5'--1--'1_ _ _ _ __ Page _L of __J_
Plant: -----'A"""r~k=a'-'-ns=a=s'"""'N~uc=l=ea=r---'O""n"'"'e,._.,_/-'-14-'-4..,_,8=-=S,_,_.R_..._.3=3=3.._,.,_,R=u=ss=e=ll:..:..v=il =e,_,,A'"'"R'-'-'-.7.,_,2=8=0=2.___ _ _ _ _ _ __
Unit No: __1.,____ Commercial Service Date: December 19. 1974 Refueling Outage No.: 1R-27 (if applicable)
TABLE 1:
ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Item Description Evaluation Description Category and Item Number C-H CV-1407 valve replacement weld See Operability evaluation CR-AN0-1-2018-01591 end prep on the up-stream side on C7.10 the existing piping, pitting was identified in the weld prep area of the ID.*
D-B Perform a base metal repair BMR-1 See Operability evaluation CR-ANO-C-2018-01743 on the inside of existing Service DZ.JO Water pipe spool*
B-J CCA-5-2 1/2". Install Plug per EC- See Operability evaluation CR-ANO-C-2018-03567 7 817 6 due to cracked weld**
B9.40 B-J Replace tubing adapter for leak See Operability evaluation CR-AN0-1-2018-03738 repair***
B9.40 E-A Re-evaluation of the degraded liner EC-76205 plate El.11
- Item was Repaired/Replaced during 1R27 refueling outage
- Item was Repaired/Replaced during 1F018-01
- Item was Repaired/Replaced during IF018-02
)
FORM OAR-1 OWNERS ACTIVITY REPORT Report Number: -~O~A~R~-~1~5~1~1_ _ _ _ __ Page _J_ of _J_
Plant: ----<A_,.,r..,_,k"'"an'""s""a:,::s'--'N-'-'u,,_,c"""le,,_,a,,.,r...,O~n'-"e=<-/._1..,_4..,_4.,_,,8::..:S=<-.:.1.R.!!.*. >:3, ,3""3.._;,__,R"""us,,_,s, _., e<!!l -"'vi"'"l e, ,.1,...,A_,.,R'-'-'-.7,_.2:..,8,,..,,0""2,___ _ _ _ _ _ __
Unit No: _ _1.,__ _ Commercial Service Date: December 19, 1974 Refueling Outage No.: 1R-27 (if applicable)
TABLE 2:
ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Item Description Description of Work Date Repair/Replacement Class Completed Plan Number 3 E-176 REPLACE CONDENSOR 6-6-18 247760-01 2 PSS penetration Replace Penetration Flued Head 5-23-18 475837-03 2 P63 penetration Replace Penetration Flued Head 5-23-18 475837-04 2 CV1407 Replace CV-1407 Valve 5-11-18 409632-20 2 CV1407 Replace CV-1407 Valve Piping (Elbow to Tee) 5-11-18 409632-37 2 VCC-2A/B Replace HBB-3-10" SW Return Piping located in 7-5-18 475840-02 the Aux Bldg for VCC-2A and VCC-28. Piping replacement to be from P-63 penetration to CV-3814 Valve and replace piping to Item# 4 on HBD-21-10" Tee.
7-5-18 2 I HBB-3 PIPE Replace Service Water Supply Piping located 475840-01 inside the Aux Bldg for VCC-2A and VCC-2B.
Piping replacement to be from CV-3812 Valve to P-55 Penetration.
5-21-18 I DH-17 DH-17 (check valve) replacement 418605-01 5-21-18 I DH-18 DH-18 (check valve) replacement 418604-01 4-30-18 T3 HBD-14-18 Replace section of pipe on HBD-15-18" SW Piping 440605-01 between FW-66 and Vendor Weld 2 shown on Dwg 13-SW-134 R-1 I CROM #52 flange bolt & nut ring segment 5-29-18 466956-14 replacement R-1 I CRDM #47 flange bolt & nut ring segment 5-29-18 466956-14 replacement R-1
[ CROM #51 flange bolt & nut ring segment 5-29-18 466956-14 replacement
[ CV-1216 Replaced Disk 5-9-18 353893-30 2 CV-1234 Replaced Disc 5-14-18 500437-11 2 CV-1234 Replaced Bonnet 5-14-18 461871-03 I CV-1214 Replaced Disc 5-9-18 353895-03 I CRDM-67 Replace CRDM-67 Closure insert Assembly 5-29-18 482542-13 I CRDM-7 Replace CROM-7 Closure Insert Assembly 5-29-18 482542-13 T3 lHBD-21-14" Piping IHBD-21-14" Piping replacement 5-14-18 460878-01