05000390/FIN-2016003-02
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Inappropriate Procedure used for Work Order Scope Change Results in Loss of 1B-B Shutdown Board. |
Description | A self-revealed non-cited violation (NCV) of 10 Code of Federal Regulations (CFR) 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, was identified for the licensees failure to use a procedure appropriate to the circumstances when work scope changed which contributed to the loss of the 1B-B shutdown board on May 17, 2016. The violation was entered into the licensees CAP as CR 1172243. The failure to use a procedure appropriate to the circumstances, such as NPG-SPP-07.6, NPG Work Management Planning Procedure, Revision (Rev.) 14, for a work scope change associated with a design change work order on the 1B-B shutdown board on May 17, 2016, was a performance deficiency. The performance deficiency was more than minor because it affected the equipment performance attribute of the mitigating systems cornerstone objective because the loss of the 1B-B shutdown board caused the inoperability of the B train of the onsite electrical distribution system and also resulted in the inoperability of all B train structures, systems, or components (SSCs) powered from the 1B-B shutdown board. The inspectors performed an initial screening of the finding and determined that this finding was of very low safety significance (Green) because the finding did not represent an actual loss of function of a single train for greater than its technical specification (TS) allowed outage time. The finding had a cross-cutting aspect in the Work Management component of the Human Performance area because the licensee failed to implement a process of planning, controlling, and executing work activities such that nuclear safety is the overriding priority. Specifically, the process of planning and executing the work activities for Design Change Notice (DCN) 64063 failed to identify and manage the risk associated with system restoration due to either equipment failure or personnel error [H.5]. |
Site: | Watts Bar |
---|---|
Report | IR 05000390/2016003 Section 4OA2 |
Date counted | Sep 30, 2016 (2016Q3) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | A Blamey A Nielsen A Wilson C Dykes J Hamman J Jandovitz J Nadel J Panfel J Rivera |
Violation of: | 10 CFR 50 Appendix B 10 CFR 50 Appendix B Criterion V |
CCA | H.5, Work Management |
INPO aspect | WP.1 |
' | |
Finding - Watts Bar - IR 05000390/2016003 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|