| Q | CCA | Title |
---|
05000373/FIN-2017004-01 | 2017Q4 | | Complete versus Truncated Shifts on Proficiency Watches |
05000374/FIN-2017010-01 | 2017Q4 | H.8 | Failure To Ensure Fire Door Was Engaged And Pinned |
05000373/FIN-2017004-02 | 2017Q4 | H.5 | Failure to Establish Brazing Repair Procedures with Appropriate Acceptance Criteria |
05000373/FIN-2017004-03 | 2017Q4 | | Primary Containment Structure, Suppression Pool Columns, Downcomer Vent and Downcomer Vent Bracing Did Not Meet Seismic Category I Requirements |
05000373/FIN-2017004-04 | 2017Q4 | | Failure of Offsite Power Backfeed Procedure to be Appropriate to the Circumstances Caused Unit 1 Scram |
05000373/FIN-2018001-02 | 2018Q1 | | Failure to Update Throttle Valve Position in Accordance with Station Procedures |
05000373/FIN-2018001-03 | 2018Q1 | | Enforcement Action (EA) 18035: Licensee Implementation of Enforcement Guidance Memorandum 15002, Enforcement Discretion for Tornado-Generated Missile Protection Noncompliance |
05000373/FIN-2018001-01 | 2018Q1 | | Post-Maintenance Testing Failed to Demonstrate Testable Check Valve Function |
05000373/FIN-2018002-02 | 2018Q2 | | Failure to Follow Procedure and Perform Database Revision Review Requirements |
05000373/FIN-2018002-04 | 2018Q2 | | Minor Violation - Follow-up of Events and Notices of Enforcement Discretion |
05000373/FIN-2018002-01 | 2018Q2 | | Failure to Implement a Preventative Maintenance Strategy for Residual Heat Removal Service Water Pump Shorting Relays |
05000373/FIN-2018010-01 | 2018Q2 | H.12 | Failure to Translate Reactor Building Superstructure Design Basis |
05000373/FIN-2018003-01 | 2018Q3 | H.12 | Failure to Establish Heat Exchanger Inspection Procedures Appropriate for the Circumstances |
05000373/FIN-2018003-02 | 2018Q3 | | Failure to Establish an Appropriate Inservice Testing Procedure |
05000373/FIN-2018003-03 | 2018Q3 | | Failure to Establish Goals to Monitor Steam Tunnel Check Dampers |
05000373/FIN-2018003-04 | 2018Q3 | H.13 | Failure to Manage the Increase in Risk During a Battery Charger Capacity Tes |
05000373/FIN-2018003-05 | 2018Q3 | | Failure to Translate Fuel Oil Relief Valve Setting into Design Drawing of Record. |
05000373/FIN-2018003-06 | 2018Q3 | | Potential Failure to Inspect Containment Post-Tensioned Tendons per Code Requirements and to Follow Corrective Action Program Process |
05000374/FIN-2018003-07 | 2018Q3 | | Potential Failure to Promptly Correct the Unit 2 Primary Containment Wall Cavity Leakage Condition and to Follow Corrective Action Program Process |
05000373/FIN-2018003-08 | 2018Q3 | H.4 | Failure to Implement Engineering Change Results in Reactor Coolant Boundary Leakage |
05000373/FIN-2018201-01 | 2018Q3 | | Security |