05000373/FIN-2018002-01
From kanterella
Jump to navigation
Jump to search
Finding | |
|---|---|
| Title | Failure to Implement a Preventative Maintenance Strategy for Residual Heat Removal Service Water Pump Shorting Relays |
| Description | A self-revealed Green finding of very low safety significance was identified for the licensees failure to implement a preventative maintenance (PM) strategy for the residual heat removal service water (RHRSW) pump shorting relays in accordance with procedure MAAA716210, Performance Centered Maintenance (PCM) Process, Revision 11. Specifically, a PCM template was issued in 2002 that required periodic as-found testing and calibration for control and timing relays, but a maintenance strategy was never implemented. As a result, one of the normally closed contacts on the Unit 1 D RHRSW pump shorting relay developed a high contact resistance and prevented the Unit 1 D RHRSW pump from starting. |
| Site: | LaSalle |
|---|---|
| Report | IR 05000373/2018002 Section 1R18 |
| Date counted | Jun 30, 2018 (2018Q2) |
| Type: | Finding: Green |
| cornerstone | Mitigating Systems |
| Identified by: | Self-revealing |
| Inspection Procedure: | IP 71111.18 |
| Inspectors (proximate) | W Schaup J Havertape M Holmberg A Nguyen R Ng G Roach B Dickson |
| INPO aspect | |
| ' | |
Finding - LaSalle - IR 05000373/2018002 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (LaSalle) @ 2018Q2
Self-Identified List (LaSalle)
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||