Pages that link to "RC-13-0037, Permanent ILRT Interval Extension Risk Impact Assessment"
Jump to navigation
Jump to search
The following pages link to RC-13-0037, Permanent ILRT Interval Extension Risk Impact Assessment:
Displayed 50 items.
- ML17206A459 (← links)
- ML15296A377 (← links)
- ML15194A055 (← links)
- ML15061A033 (← links)
- ML14314A033 (← links)
- ML14261A276 (← links)
- ML14141A461 (← links)
- ML14122A156 (← links)
- ML14051A363 (← links)
- ML14037A228 (← links)
- ML14034A339 (← links)
- ML14010A415 (← links)
- ML13309B053 (← links)
- ML13095A110 (redirect page) (← links)
- ML13095A109 (← links)
- ML12047A146 (← links)
- ML12030A035 (← links)
- ML11321A172 (← links)
- ML18092B510 (← links)
- RC-15-0020, Attachment 5 - Westinghouse LTR-PAFM-12-86 Flaw Tolerance Evaluation to Support Re-Categorization of V.C. Summer Unit 1 Steam Generator Nozzle to Safe End Dissimilar Metal Weld Inspection Requirements (← links)
- RC-15-0020, Attachment 2 - Ihi Southwest Inner Diameter Examination Data, Part 2 of 2 (← links)
- RC-14-0032, Virgil C. Summer Unit 1, License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. Attachment I: Analysis of Proposed Emergency Action Levels Enclosed (← links)
- RC-13-0130, WCAP-17758-NP, Rev. 0, Technical Basis for Westinghouse Embedded Flaw Repair for V.C. Summer Unit 1 Reactor Vessel Head Penetration Nozzles and Attachment Welds. (← links)
- ML18179A416 (← links)
- RC-13-0037 (redirect page) (← links)
- RC-13-0037, Virgil C. Summer Nuclear Station, Unit 1, License Amendment Request - LAR (13-00705) Technical Specification Change to Extend Integrated Leak Rate Test Frequency to 15 Years (← links)
- RC-12-0175, WCAP-17688-NP, Rev 0, V.C. Summer Unit 1 Seismic Walkdown Inspection Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. (← links)
- RC-12-0173, Technical Basis for Westinghouse Embedded Flaw Repair for V. C. Summer Unit 1 Reactor Vessel Head Penetration Nozzles (← links)
- RC-12-0170, LTR-PAFM-12-137-NP, Rev. 1, Technical Basis for Westinghouse Embedded Flaw Repair for V. C. Summer, Unit 1, Reactor Vessel Head Penetration Nozzles. (← links)
- RC-12-0110, LTR-PAFM-12-86-NP, Rev. 0, Flaw Tolerance Evaluation to Support Re-categorization of V. C. Summer Unit 1 Steam Generator Nozzle to Safe End Dissimilar Metal Weld Inspection Requirements. (← links)
- RC-11-0062, V. C. Summer, License Amendment Request - LAR 04-02961, License Amendment Request for Slave Relay Surveillance Testing (← links)
- ML092100133 (← links)
- RC-09-0072, Virgil C. Summer, Unit 1, Submittal of Supplement Information to License Amendment Request LAR 04-02911 and Related Technical Specification Changes to Implement Full-Scope Alternative Source Term in Accordance with 10 CFR 50.67 (← links)
- ML091680063 (← links)
- ML081070177 (← links)
- RC-07-0169, Virgil Summer - 10 CFR 50.59 Biennial Report Covering the Period from October 1, 2005 Until October 1, 2007 (← links)
- RC-06-0202, V. C. Summer - ECCS Evaluation Model Revisions Report, Addresses the Effect of Using a Finer Break Spectrum (← links)
- ML060410276 (← links)
- RC-06-0024, 1007930 - On-Line Monitoring of Instrument Channel Performance, Volume 3: Applications to Nuclear Power Plant Technical Specification Instrumentation (← links)
- RC-18-0079, Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error (← links)
- RC-17-0089, Focused Evaluation for External Flooding (← links)
- RC-17-0057, Emergency Core Cooling System Evaluation Model Revisions Annual Report (← links)
- RC-16-0170, Mitigating Strategies Assessment (MSA) Report Submittal (← links)
- RC-16-0092, License Amendment Request LAR-12-02439, Technical Specification 3.5.4, Limiting Condition for Operation Refueling Water Storage Tank (← links)
- RC-16-0086, Special Report 2016-003 Regarding Fire Barrier Not Restored to Operability Status within 7 Days of Inoperability (← links)
- RC-16-0008, Transmittal of Expedited Seismic Evaluation Process Report, Revision 1 (← links)
- RC-15-0171, License Amendment Request - LAR-15-01424, Implementation of WCAP-15376-P-A, Revision 1 - Risk-Informed Assessment of the RTS and ESFAS Surveillance Test Intervals and Reactor Trip Breaker Test and Completion Times. (← links)
- RC-15-0153, Submittal of 10 CFR 50.59 Biennial Report (← links)
- RC-15-0113, License Amendment Request LAR-08-001, 62Request to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF)-523, Generic Letter 2008-01, Managing Gas Accumulation (← links)
- RC-15-0109, License Amendment Request - LAR 14-02981, Proposed Revision to Technical Specification 6.0, Administrative Controls. (← links)