Pages that link to "ML20249A591"
Jump to navigation
Jump to search
The following pages link to ML20249A591:
Displayed 24 items.
- PNO-IV-85-043, on 850820,util Achieved Criticality.Plant Had Been Shut Down Since 840910 to Replace Reactor Recirculation Piping.Licensee Has 19-day Power Ascension & Testing Period Before Resuming Commercial Operation (← links)
- PNO-IV-85-054, on 851005,reactor Manually Tripped Due to Sudden Increase in Vibration of Low Pressure Turbine Elements in Main Turbine Condensate Activity.Caused by Possible Damage to Condenser Tubes.State of Ne Informed (← links)
- PNO-II-96-085, on 961226,tractor Trailer Carrying Vectra Shipping Cask Broke Down on Highway in Sc.Trailer low-boy Type & One of Welds Broke,Caused Trailer to Fall to Ground. Cask in Transit to Barnwell Waste Disposal Site (← links)
- PNO-IV-85-036, on 850719,site Meteorological Tower Struck by Lightning Resulting in Loss of All Meteorological Instrumentation.Unusual Event Declared.Repairs Will Start When Weather Conditions Permit (← links)
- PNO-IV-85-034, on 850718,on-coming Shift Supervisor Suffered Apparent Heart Attack or Seizure & Taken by Ambulance to Local Hosp.Operator License Did Not Have Restriction Requiring Second Person on Duty (← links)
- ML20151X443 (← links)
- PNO-IV-88-063, on 880803,contract Electrician Discovered Unconscious at Work Location at Cooper Plant.Individual Transported to Hosp & Pronounced Dead.Cause of Death Under Investigation (← links)
- PNO-IV-88-057, on 880715,rept of Fire on Turbine Bldg Received.Fire Brigade Manned & Electrical Arcing Found in Main Generator Outlet Bus Ducting.Licensee Evaluating Cause & Repairs Not Expected Due to Preliminary Insp (← links)
- PNO-IV-88-003, on 880109,derailment of Railroad Car Carrying Empty Spent Fuel Shipping Cask Occurred.Caused by Track Switch in Wrong Position.Railroad Car Remained in Upright Position.No Personnel Injuries Reported (← links)
- PNO-IV-88-052, on 880617,criticality Achieved Following 104- Day Refueling Outage.Scheduled 52-day Outage Extended Due to Problems W/Turbine Stationary Blading,Core Dummy Fuel Assemblies & Seismic Concerns Re Safety Sys Supports (← links)
- PNO-IV-86-014, on 860418,two Util Engineers Filed Suit in Us District Court in Lincoln,Ne,Challenging Util Alcohol & Drug Testing Requirement.Engineers Say Test Violates Constitutional Rights.Util Responding to Media Inquiries (← links)
- PNO-IV-86-026, on 860721,licensee Began Inspecting Limitorque Motor Operators for Environ Qualification.Several Motor Operators Found W/Jumper Wires on Limit & Unidentified Torque Switches.Items Replaced Upon Discovery (← links)
- PNO-IV-87-027, on 870518,reactor Shut Down Due to High Conductivity in Reactor Coolant Due to Condenser Tube Leaks. Shut Down Expected to Exceed 48 H (← links)
- PNO-IV-99-040, on 990924,licensee Was Replacing Motor Operator for Suction Valve on B Recirculation Loop.After Completing Repairs,Operators Plan to Restart Reactor.Info Has Been Discussed with Licensee (← links)
- ML20236U935 (← links)
- ML20236L321 (← links)
- PNO-IV-87-030, on 870710,NRC Informed of First Instance of Employee Testing Positive for Drugs,Per Fitness for Duty Program.Access Privileges for Employee Suspended & Denied for Three Contractor Employees (← links)
- PNO-IV-84-013F, on 840621,licensee Terminated Notification of Unusual Event.Level at Site Was 896.7 Above Mean Sea Level & Slowly Dropping (← links)
- PNO-IV-84-013E, on 840618 Level of Missouri River at Site Was 897-25 Feet Above Mean Sea Level.Licensee Maitaining All Flood Preparations in State of Readiness (← links)
- PNO-IV-84-013D, on 840616,level of Missouri River at Site Was 898.6 Feet Above Mean Sea Level (← links)
- PNO-IV-84-013C, on 840615,level of Missouri River at Site Was 897-75 Feet Above Mean Sea Level (← links)
- PNO-IV-84-013B, on 840615,licensee Determined That Water Level in Missouri River Had Reached 897 Feet Above Mean Sea Level (← links)
- PNO-IV-88-009A, failed RHR Pump Motor B Removed from Facility.Ge Confirmed Ground Deep in Motor Coil.Evaluation of Motor for Possible Generic Problems Continuing.Best Estimate of Startup Is 880206 (← links)
- PNO-IV-93-039, on 931214,while Plant Was Operating at 100% Power,Partial Loss of Feedwater Event Occurred.Hpci Sys Was Secured Approx 41 Into Event & All safety-related Sys Responded as Designed.State of Ne Informed (← links)