Pages that link to "ML20151X988"
Jump to navigation
Jump to search
The following pages link to ML20151X988:
Displayed 13 items.
- PNO-II-85-081, on 850820,during Full Power,Reactor Tripped. Caused by Valving Procedure Error by Technician Replacing Reactor Coolant Loop Flow Transmitter.Source Range Channel Being Replaced.Restart Scheduled for 850824 (← links)
- ML20151X452 (← links)
- PNO-II-88-038, on 880603,outage Exceeded 48 H to Repair Leaking Tubes on Condenser B.Reactor Subsequently Tripped from Unrelated Switch Problem During Surveillance Test.Eddy Current Test Determined 30 Tubes Would Not Pass Probe (← links)
- PNO-II-86-039, on 860531,plant Taken Out of Svc to Repair Damage to non-nuclear Components Caused by Water Hammer in Low Pressure Condensate Sys.Caused by Personnel Error During Restart.Plant Will Be Down for Several Days (← links)
- PNO-II-94-010, on 940225,licensed Reactor Operator Tested Positive During Random Drug Test (← links)
- PNO-II-86-087, on 861107,employee Received Calculated Exposure of 75 Rems to One Hand,Exceeding 10CFR20,18.75 Rems Limit.Cause of Contamination Undetermined.Region II Radiation Specialist Dispatched for Followup (← links)
- ML20249A906 (← links)
- ML20249A812 (← links)
- ML20249A044 (← links)
- PNO-II-89-040, on 890530,rapid RCS Pressure Decreased to Less than 2,000 Psi.Licensee Investigating Incident to Determine Root Cause & Corrective Action.Anticipated That Unit Will Be Down for Approx 2 Wks (← links)
- PNO-II-89-064, on 890907,plant Shut Down for More than 48 H to Determine Cause of Out of Spec Secondary Chemistry.Msiv a Test Circuitry Discovered Energized & Valve Declared Inoperable on 890908.Caused by Water Hammer in Flush Line (← links)
- PNO-II-89-020, on 890214,plant Shut Down Due to Continuing SG Conductivity & Sulphate Problems Associated W/Resin Intrusion Event.During Shutdown Steam Generators Flushed & Mechanically Cleaned Along W/Dearating Tank (← links)
- PNO-II-89-060A, on 890825,reactor Manually Tripped from 97% Power Due to Pressurizer a Safety Valve Lifting.Licensee Plans to Go to Cold Shutdown & Replace Valve.Repairs Expected to Take 1 Wk (← links)