Pages that link to "ML18136A866"
Jump to navigation
Jump to search
The following pages link to ML18136A866:
Displayed 50 items.
- ML14210A484 (← links)
- ML12272A304 (← links)
- ML18159A303 (← links)
- LR-N16-0003, License Amendment Request to Amend the Accident Monitoring Instrumentation Technical Specifications (← links)
- LR-N16-0093, License Amendment Request to Extend the Implementation Period for Salem, Unit 1 License Amendment No. 311 and Salem, Unit 2 License Amendment No. 292 (← links)
- RA-14-032, Braidwood, Units 1 and 2, Attachment 2, Discussion of Revision to the Radiological Emergency Plan Annex, EP-AA-1001, NEI 99-01, Rev. 6, Development of Emergency Action Levels for Non-Passive Reactors, Enclosure 2B, and 2C, Pages Bw 3-81 - (← links)
- LR-N18-0038, License Amendment Request (LAR) to Amend the Salem Technical Specifications (TS) to Extend the Refueling Water Storage Tank (RWST) Allowed Outage Time (← links)
- ML102580241 (← links)
- ML102150092 (← links)
- ML092960584 (← links)
- ML092430231 (← links)
- ML092400532 (← links)
- ML092400531 (← links)
- ML091470279 (← links)
- ML18264A012 (← links)
- ML18250A313 (← links)
- ML061160122 (← links)
- ML18267A171 (← links)
- LR-N17-0058, License Amendment Request to Revise the Implementation Period for License Amendment No. 294 (← links)
- LR-N16-0044, Emergency License Amendment Request to Modify Technical Specification Requirements for One Inoperable Subcooling Margin Monitor Channel (← links)
- LR-N15-0189, Supplemental Information Needed for Review of Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve Position Indication Instrumentation from Accident Monitoring Instrumentation Technical Specifications (← links)
- LR-N15-0187, Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve (PORV) Position Indication Instrumentation from the Accident Monitoring Instrumentation Technical Specifications (← links)
- LR-N10-0098, License Amendment Request - One Time On-Line Safety-Related Battery Replacement (← links)
- LR-N18-0116, Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension (← links)
- LR-N18-0113, Supplement to License Amendment Request: Revise Reactor Trip System Instrumentation, Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves and Add Main Feedwater Isolation Technical Specification (← links)
- LR-N18-0112, Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension (← links)
- LR-N18-0108, Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension (← links)
- LR-N17-0144, License Amendment Request: Revise Reactor Trip System Instrumentation, Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves and Add Main Feedwater Isolation Technical Specification (← links)
- LR-N18-0067, Supplement to License Amendment Request for Vital Instrument Bus Inverter Allowed Outage Time (AOT) Extension (← links)
- LR-N18-0022, License Amendment Request to Revise Technical Specification Actions for Rod Position Indicators (← links)
- LR-N17-0135, License Amendment Request for Implementation of WCAP-14333 and WCAP-15376, Reactor Trip System Instrumentation and Engineered Safety Feature Actuation System Instrumentation Test Times and Completion Times (← links)
- LR-N17-0121, License Amendment Request to Relocate the Reactor Coolant System Pressure Isolation Valve Table from the Technical Specifications to the Technical Requirements Manual (← links)
- LR-N16-0173, License Amendment Request: Containment Fan Cooler Unit (Cfcu) Allowed Outage Time (AOT) Extension (← links)
- LR-N16-0114, License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing Using the Consolidated Line . (← links)
- LR-N16-0057, Supplement for License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems (← links)
- LR-N16-0015, Supplemental Information for License Amendment to Revise Technical Specification 3/4.3.1, Reactor Trip System Instrumentation (← links)
- LR-N15-0084, License Amendment Request Modifying Chilled Water System Requirements (← links)
- LR-N15-0021, License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems (← links)
- LR-N15-0020, License Amendment Request to Revise Technical Specification 3/4.3.1, Reactor Trip System Instrumentation (← links)
- LR-N14-0185, License Amendment Request to Isolate Unborated Water Sources and Use Gamma-Metrics Post-Accident Neutron Monitors During Mode 6 (Refueling) (← links)
- LR-N14-0074, License Amendment Request to Revise Power Distribution Limits for Axial Flux Difference and Heat Flux Hot Channel Factor (← links)
- LR-N12-0289, License Amendment Request: Change to PSEG Nuclear LLC, Emergency Plan to Remove the Salem Backup R45 Plant Vent Radiation Monitor Indications (← links)
- LR-N12-0183, License Amendment Request: Revision to Technical Specification (TS) 3.7.6.1 (Unit 1) and 3.7.6 (Unit 2) Control Room Emergency Air Conditioning System (← links)
- LR-N10-0363, License Amendment Request: Changes to Snubber Surveillance Requirements (← links)
- LR-N10-0118, Corrections to the License Renewal Application Environmental Report (← links)
- LR-N10-0088, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (← links)
- LR-N09-0164, License Amendment Request to Correct Technical Specification and Facility Operating License Editorial Items (← links)
- LR-N09-0034, License Amendment Request to Relocate Communications, Manipulator Crane, and Crane Travel Requirements from Technical Specifications (← links)
- LR-N09-0042, License Amendment Request to Revise the Definition of Fully Withdrawn for the Rod Cluster Control Assemblies (← links)
- LR-N08-0132, License Amendment Request to Remove References to NRC Generic Letter 82-12, Nuclear Power Plant Staff Working Hours. (← links)