Pages that link to "L-MT-24-006, Subsequent License Renewal Application Annual Update 1 and Supplement 9"
Jump to navigation
Jump to search
The following pages link to L-MT-24-006, Subsequent License Renewal Application Annual Update 1 and Supplement 9:
Displayed 50 items.
- L-MT-21-067, Update to the Monticello Technical Specification Bases (← links)
- L-MT-21-068, 2021 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 (← links)
- L-MT-21-072, License Amendment Request: Revise MNGP Technical Specifications to Support a Ten-Year Inspection of the Diesel Generator Fuel Oil Storage Tank (← links)
- L-MT-22-003, Submittal of Revision 1 of the Core Operating Limits Report for Cycle 31 (← links)
- L-MT-22-004, Technical Specification 5.6.4 Post Accident Monitoring Report (← links)
- L-MT-22-006, 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-26 (L-MT-22-006) (← links)
- L-MT-22-010, License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency (← links)
- L-MT-22-012, Special Report for the Bypass of the Offgas Treatment Storage System (← links)
- L-MT-22-008, 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval Alternative Related to Excess Flow Check Valve Testing Frequency (L-MT-22-008) (← links)
- L-MT-22-016, 2021 Annual Report of Individual Monitoring (← links)
- L-MT-22-019, Withdrawal of Requests for Relief from ASME OM Code for the Sixth Inservice Testing Interval (← links)
- L-MT-22-018, 2021 Annual Radioactive Effluent Release Report (← links)
- L-MT-22-017, 2021 Annual Radiological Environmental Operating Report (← links)
- L-MT-22-022, Response to a Request for Additional Information: Monticello Alternative VR-10, Excess Flow Check Valve Testing Frequency (← links)
- L-MT-22-024, Response to a Request for Additional Information for the Monticello Nuclear Generating Plant Related to the Amendment to Adopt Advanced Framatome Methodologies (← links)
- L-MT-22-026, Changes to the Emergency Plan (← links)
- L-MT-22-007, Response to Request for Additional Information for the Monticello Nuclear Generating Plant Alternative Request VR-08 (EPID: L-MT-22-007) (← links)
- L-MT-22-030, Sixth Interval Inservice Testing (1ST) Plan (← links)
- L-MT-22-037, Supplement to 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval, Alternative VR-10, Excess Flow Check Valve Testing Frequency (← links)
- L-MT-22-048, Update to the Monticello Technical Specification Bases (← links)
- L-MT-22-047, Withdrawal of Request for Relief from ASME OM Code for the Sixth Inservice Testing Interval (← links)
- L-MT-22-052, L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative (← links)
- L-MT-22-049, Industry Groundwater Protection Initiative Special Report (← links)
- L-MT-22-046, 2022 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 (← links)
- L-MT-23-005, Response to the NRC Request for Additional Information Regarding the 50.55a Request Pr 08, HPCI Pump Quarterly Testing (EPID Number L-2022-LLR-0088) (← links)
- L-MT-23-004, CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program (← links)
- L-MT-22-045, Letter Submitting Post-Exam Package (← links)
- L-MT-23-008, 10CFR50.55a Request to Use Later Edition of ASME Section XI for ISI Code of Record (RR-003) (← links)
- L-MT-23-013, Core Operating Limits Report (COLR) for Cycle 31, Revision 3 (← links)
- L-MT-23-012, Core Operating Limits Report (COLR) for Monticello Nuclear Generating Plant Cycle 31, Revision 2 (← links)
- L-MT-23-017, 2022 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) (← links)
- L-MT-23-020, Submittal of 2022 Annual Radioactive Effluent Release Report (← links)
- L-MT-23-019, Submittal of 2022 Annual Radiological Environmental Operating Report (← links)
- L-MT-23-021, Core Operating Limits Report (COLR) for the Monticello Nuclear Generating Plant for Cycle 32 (← links)
- L-MT-23-028, 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report (← links)
- L-MT-23-032, 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-11 (← links)
- L-MT-23-031, Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 1 (← links)
- L-MT-23-030, Subsequent License Renewal Application Supplement 3 (← links)
- L-MT-23-025, Subsequent License Renewal Application Supplement 2 (← links)
- L-MT-23-010, Subsequent License Renewal Application Supplement 1 (← links)
- L-MT-21-063, Notice of Intent to Pursue Subsequent License Renewal for Plant (← links)
- L-MT-23-034, Subsequent License Renewal Application Response to Request for Additional Information Set 1 (← links)
- L-MT-23-035, Subsequent License Renewal Application Supplement 5 (← links)
- L-MT-23-036, Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 6 (← links)
- L-MT-23-037, Subsequent License Renewal Application Response to Request for Additional Information Set 3 (← links)
- L-MT-23-041, Subsequent License Renewal Application Response to Request for Confirmation of Information Set 2 (← links)
- L-MT-23-052, Subsequent License Renewal Application Supplement 7 (← links)
- L-MT-23-049, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 (← links)
- L-MT-23-051, Update to the Technical Specification Bases (← links)
- L-MT-23-043, 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-09 (← links)