Pages that link to "L-2008-149, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4"
Jump to navigation
Jump to search
The following pages link to L-2008-149, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4:
Displayed 50 items.
- ML15280A392 (← links)
- ML15198A030 (← links)
- ML15084A011 (← links)
- ML110730298 (← links)
- ML110730284 (← links)
- L-2016-087, Florida Power & Light Company, on Periodic Report of Changes to the St. Lucie Unit 2 Technical Specification Base (← links)
- L-2015-091, St. Lucie, Unit 2 - Supplemental Information for Technical Specification Change and Exemption Request Regarding the Transitioning to Areva Fuel (← links)
- ML18096B513 (← links)
- ML18096B494 (← links)
- ML18096B448 (← links)
- ML18088B305 (← links)
- ML18088B285 (← links)
- ML18088B274 (← links)
- ML18088B264 (← links)
- ML18088A951 (← links)
- ML18088A948 (← links)
- L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 4; Technical Specifications Bases Markups (← links)
- L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages (← links)
- L-2010-259, St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 4; Technical Specifications Bases Markups (← links)
- ML103560428 (← links)
- L-2010-259, St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages (← links)
- ML103560427 (← links)
- L-2010-078, Attachment 4, St. Lucie License Amendment Request Extended Power Uprate, Technical Specifications Bases Markups (for Information Only) (← links)
- ML101160192 (← links)
- L-2008-149, St. Lucie, Unit 2, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 (redirect page) (← links)
- L-2008-149 (redirect page) (← links)
- ML081840104 (redirect page) (← links)
- ML072980860 (← links)
- ML053570330 (← links)
- L-2018-215, Resubmittal of Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (← links)
- L-2018-178, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 (← links)
- L-77-107, Proposed Amendment to Facility Operating License. Specification 6.8.3.C Time Limit for Facility Review Group Review & Plant Manager Approval of Temporary Procedure Changes Is Extended from 7 Days to 14 Days (← links)
- L-76-159, Proposed Amendment to Facility Operating License DPR-67. Proposed Change to Technical Specification 3.1.1.5 with Regard to Deletion of Special Testing Exception Pertaining to Control Rod (← links)
- L-76-172, Proposed Amendment to Facility Operating License DPR-67. Allow FPL to Perform as Much of the Power Ascension Test Program as Possible (← links)
- L-76-191, Proposed Amendment to Facility Operating License DPR-67. Proposed Deletion of Applicability of Specification 3.2.3 to Mode 2 (← links)
- L-76-190, Proposed Amendment to License No. DPR-067. Provides Additional Information to Supplement Letters of 04/27/1976 & 04/30/1976. Appendix a Contains Additional ECCS Information & Appendix B Contains Calorimetric Information (← links)
- L-76-207, Proposed Amendment to License No. DPR-067. Proposed Change Concerns to Surveillance Requirement Consisting of Revision to Appendix a with Regarding to Safety Related Hydraulic Snubbers (← links)
- L-76-213, Proposed Amendment to Facility Operating License DPR-67. Proposed Changes Modify Technical Specifications So They Are in Compliance with Appendix to 10 CFR 50 (← links)
- L-76-223, Proposed Amendment to License No. DPR-067. Proposed Change Concerns Revision to Surveillance Requirement 4.2.1.4.b.7 (← links)
- L-76-255, Proposed Amendment to Facility Operating License DPR-67. Proposed Change Concerns a Revision of Technical Specification 4.1.3.1.3 Regarding the CEA Block Circuit Surveillance Requirements (← links)
- L-76-296, Proposed Amendment to Facility Operating License DPR-67 Proposed Change Concerns Revision to Technical Specification 3.9.4.C to Permit Automatic Actuation of Containment Vacuum Relief Valve (← links)
- L-76-377, Application for Proposed Amendment to License No. DPR-067. Proposed Change Concerns Revision to Table 3.3-5 (Engineered Safety Features Response Times), Item 1.e and 6 (← links)
- L-76-386, Application for Proposed Amendment to License No. DPR-067. Proposed Change Concerns Revision to Surveillance Requirement 4.8.1.1.2.C.6 to Verify Operability of the Automatic Sequence Timers (← links)
- L-77-151, Proposed Amendment to Facility Operating License DPR-67 Regarding Secondary Water Chemistry Program (← links)
- L-77-214, Proposed Amendment to Facility Operating License. Relationship Between Linear Heat Rate & Thermal Power in Specification 4.2.1.3.c Is Revised & Rod Bow Penalty Factor in Specification 4.2.1.4.b Is Deleted (← links)
- L-77-339, Proposed Amendment to Facility Operating License No. DPR-67. Proposed Change Concerns Deletion of the Requirement for Annual Operating Report (← links)
- L-78-129, Application for Proposed Amendment to License No. DPR-067. Proposed Change Concerns Operability and Surveillance of Subject Facility Overpressure Mitigating System (← links)
- L-78-121, License No. DPR-67 Application for Amendment: Appendix a Technical Specification Proposed Change Concerning Supporting Operation of the Containment Spray Additive System Scheduled to Be Installed at Facility (← links)
- L-78-110, License No. DPR-67 Application for Amendment: Appendix a Technical Specification Proposed Change Concerning Revision to Specification on Decay Time for Fuel Assemblies Stored in Modules Nearest the Fuel Cask Compartment (← links)
- L-78-119, Application for Proposed Amendment to License No. DPR-067. Proposed Change Concerns Revision to Surveillance Requirement 4.6.6.1.A to Include Testing of Sbvs Auxiliary Heaters (← links)