Pages that link to "CNRO-2007-00042, Entergy Operations, Inc. - Relief Requests for 10 Year Updates to the 120 Month Inservice Testing Intervals"
Jump to navigation
Jump to search
The following pages link to CNRO-2007-00042, Entergy Operations, Inc. - Relief Requests for 10 Year Updates to the 120 Month Inservice Testing Intervals:
Displayed 50 items.
- ML17242A237 (← links)
- ML17325B762 (← links)
- ML14224A279 (← links)
- ML081570002 (← links)
- ML081560726 (← links)
- TAC:MD7521 (← links)
- ML081050587 (← links)
- ML073511442 (redirect page) (← links)
- ML17107A002 (← links)
- ML081050587 (← links)
- ML081010019 (← links)
- GNRO-2006/00002, Lnservice Inspection Summary Report for Grand Gulf Nuclear Station Unit 1 (← links)
- CNRO-2007-00042 (redirect page) (← links)
- ML17107A002 (← links)
- ML081050587 (← links)
- ML081010019 (← links)
- 1CAN030804, Revised Relief Request for 10 Year Update to the 120 Month Inservice Testing Interval, Arkansas Nuclear One, Unit 1 (← links)
- CNRO-2007-00042, Entergy Operations, Inc. - Relief Requests for 10 Year Updates to the 120 Month Inservice Testing Intervals (← links)
- CNRO-2007-00044, Unit 1 and Arkansas Nuclear One, Units 1 & 2 - Inservice Testing Plan (← links)
- GNRO-2018/00047, Submittal of 2018 Inservice Inspection Summary Report (← links)
- GNRO-2017/00039, Steam Dryer Visual Inspection Results for the First Two Scheduled Refueling Outages (← links)
- GNRO-2016/00033, Submittal of 2016 Inservice Inspection Summary Report (← links)
- GNRO-2014/00043, Inservice Inspection Summary Report (← links)
- GNRO-2012/00110, Submittal of Inservice Inspection Summary Report (← links)
- GNRO-2008/00071, Inservice Inspection (ISI) Program Third 10-Year Interval, Rev. 0 (← links)
- GNRO-2009/00070, Supplement to Request to Use Portion of Later Edition to the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants for Main Steam Safety Relief Valve Inservice Testing (← links)
- RBG-47825, Request for Alternative in Accordance with 10 CFR 50.55a (a)(3)(i) Proposed Alternative to 10 CFR 50.55a Examination Requirements for Reactor Pressure Vessel Weld Inspections (RR-RBS-ISI-015) (← links)
- RBG-47808, Inservice Inspection Plan for the Fourth Ten-Year Interval (← links)
- RBG-47763, Submittal of Owner'S Activity Report Form (OAR-1) for Activities Occurring Between March 2015 and March 2017 (← links)
- RBG-47737, Relief Requests for 10-year Updates to the 120-Month Inservice Testing Intervals (← links)
- RBG-47581, Submittal of Owner'S Activity Report Form (OAR- 1) (← links)
- RBG-47456, Relief Request; ASME Code Case OMN-17, Alternative Rules for Testing ASME Class 1 Pressure Relief/Safety Valves (← links)
- RBG-47367, Submittal of Cycle 17 Owner'S Activity Report Form (OAR-1) (← links)
- RBG-47166, Requests for Relief RBS-ISI-016 & RBS-ISI-017, Requests for Relief from ASME Code Section Xl Inservice Inspection Requirements for Pressure Retaining Welds in Control Rod Housings and Pressure Retaining Welds in Pumps & Valves (← links)
- RBG-47110, Inservice Inspection Plan for the Third 10-Year Interval (← links)
- RBG-46990, Submittal of Cycle 15 Owner'S Activity Report Form (OAR-1) Occured Between March 2008 and October 2009 (← links)
- RBG-46978, Request for Alternative RBS-ISI-014, Proposed Alternative to 10 CFR 50.55a Examination Requirements for Reactor Pressure Vessel Weld Inspections (← links)
- RBG-46922, Request for Alternative - Implementation of a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-716 (← links)
- GNRO-2009/00004, Inservice Inspection Summary Report (← links)
- GNRO-2008/00057, Transmittal of Inservice Inspection Program Third 10-Year Interval, Revision 0 (← links)
- RBG-46816, Submittal of Owner'S Activity Report Form (OAR-1) for Cycle 14, Between May 2006, and March 2008 (← links)
- GNRO-2007/00046, Inservice Inspection Summary Report (← links)
- GNRO-2006/00044, Corrections to Inservice Inspection Summary Report (← links)
- RBG-47921, Snubber Examination, Testing, and Service Life Monitoring Program Plan for Fourth Inservice Testing Interval (← links)
- GNRO-2018/00054, Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval (← links)
- GNRO-2019/00014, Snubber Testing Program for Fourth Inspection Interval (← links)
- RBG-46977, Request for Alternative RBS-ISI-015 Proposed Alternative to 10 CFR 50.55a Examination Requirements for Reactor Pressure Vessel Weld Inspections (← links)
- RBG-46923, Request for Alternative RBS-ISI-012 Request to Extend the Second ASME Inservice Inspection Interval (← links)
- RBG-47005, Supplement to Requests for Relief from ASME Section XI Volumetric and Visual Examination Requirements - Second 10-Year Interval (← links)
- W3F1-2019-0041, Submittal of Owner'S Activity Report Form for Lnservice Inspection Performed During Operating Cycle 22 / Refuel 22 (← links)
- W3F1-2019-0009, Proposed Inservice Inspection Program Alternative WF3-RR-19-1 for Application of Dissimilar Metal Weld Full Structural Weld Overlay - Reactor Coolant System Cold Leg Drain Nozzles (← links)
- W3F1-2017-0075, Submittal of the Inservice Testing Plan for the Fourth 10-Year Interval (← links)
- W3F1-2017-0082, Submittal of the Inservice Inspection Plan and Containment Inservice Inspection Plan for the Fourth 10-Year Interval (← links)
- W3F1-2016-0017, Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 20 / Refuel 20 (← links)
- W3F1-2014-0041, 180 Day Steam Generator Tube Inspection Report for the 19TH Refueling Outage (← links)
- W3F1-2013-0018, Request for Relief from American Society of Mechanical Engineers (ASME) Code, Section XI for the Third 10-year Interval - Inservice Inspection Request for Relief W3-ISI-022 (← links)
- W3F1-2012-0099, Request for Alternative W3-1SI-021, ASME Code Case N-770-1 Baseline Examination Request for Alternative (← links)
- W3F1-2011-0072, Day Steam Generator Tube Inspection Report for the 17th Refueling Outage (← links)
- W3F1-2011-0013, Request for Alternative W3-ISI-018, Inspection of Reactor Pressure Vessel Head Control Element Drive Mechanism Nozzles During the Third Ten-Year Inservice Inspection Interval (← links)