Pages that link to "AEP-NRC-2024-10, Form OAR-1, Owners Activity Report"
Jump to navigation
Jump to search
The following pages link to AEP-NRC-2024-10, Form OAR-1, Owners Activity Report:
Displayed 50 items.
- AEP-NRC-2022-42, Unit 2 Updated Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements (← links)
- AEP-NRC-2022-35, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes (← links)
- AEP-NRC-2022-47, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan, Revision 47 (← links)
- AEP-NRC-2022-30, Core Operating Limits Report (← links)
- AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report (← links)
- AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 (← links)
- AEP-NRC-2022-51, Evacuation Time Estimate Analysis (← links)
- AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring (← links)
- AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in (← links)
- AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation (← links)
- AEP-NRC-2022-56, Unit 2 - Transmittal of Report of Changes to the Emergency Plan (← links)
- AEP-NRC-2023-20, Annual Report of Property Insurance (← links)
- AEP-NRC-2023-15, Decommissioning Funding Status Report (← links)
- AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump (← links)
- AEP-NRC-2023-23, Annual Report of Individual Monitoring for 2022 (← links)
- AEP-NRC-2023-19, Annual Radioactive Effluent Release Report (← links)
- AEP-NRC-2023-27, Annual Radiological Environmental Operating Report (← links)
- AEP-NRC-2023-29, Core Operating Limits Report (← links)
- AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations (← links)
- AEP-NRC-2023-33, Renewable Operating Permit (← links)
- AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump (← links)
- AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation (← links)
- AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes (← links)
- ML23338A264 (← links)
- AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation (← links)
- AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor (← links)
- ML23352A350 (← links)
- AEP-NRC-2024-01, Emergency Plan Revision 48 (← links)
- ML24004A158 (← links)
- IR 05000315/2023004 (← links)
- AEP-NRC-2024-47, Form OAR-1, Owners Activity Report (← links)
- IR 05000315/2024002 (← links)
- ML24197A126 (← links)
- ML24191A069 (← links)
- AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask (← links)
- AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating (← links)
- ML24183A016 (← links)
- ML24169A214 (← links)
- AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring (← links)
- AEP-NRC-2024-23, Core Operating Limits Report (← links)
- ML24141A216 (← links)
- AEP-NRC-2024-40, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating (← links)
- AEP-NRC-2024-41, Annual Radiological Environmental Operating Report (← links)
- AEP-NRC-2024-35, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations (← links)
- AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan (← links)
- AEP-NRC-2024-26, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 49 (← links)
- IR 05000315/2024001 (← links)
- AEP-NRC-2024-24, Form OAR-1, Owners Activity Report (← links)
- AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report (← links)
- ML24116A000 (← links)