Pages that link to "05000295/LER-1997-015, Forwards LER 97-015-01,per 10CFR50.73(a)(2)(iv),which Requires Written Rept When Any Event Occurs That Resulted in Manual or Automatic Actuation of Any Esg.No Commitments Were Made within Rept"
Jump to navigation
Jump to search
The following pages link to 05000295/LER-1997-015, Forwards LER 97-015-01,per 10CFR50.73(a)(2)(iv),which Requires Written Rept When Any Event Occurs That Resulted in Manual or Automatic Actuation of Any Esg.No Commitments Were Made within Rept:
Displayed 34 items.
- 05000295/LER-1997-008, Forwards LER 97-008-00 Which Repts Condition That Resulted in Condition of Npp.Listed Commitments Included in Rept (← links)
- 05000295/LER-1997-007, Forwards LER 97-007-00 Re Automatic Actuation of Esf. Submitted Table Identifies Actions Committed to by Util (← links)
- 05000295/LER-1997-006, Forwards LER 97-006-00 Reporting an Event or Condition That Is Prohibited by Tss.Commitments Made in Rept,Listed (← links)
- 05000295/LER-1997-002, Forwards LER 97-002-00.Commitments Made by Util Listed (← links)
- 05000295/LER-1997-012, Forwards LER 97-012-00,which Documents 970423 Event That Occurred at Zion Generating Station.Commitments Made by Util,Listed (← links)
- 05000295/LER-1997-009, Forwards LER 97-009-00 IAW 10CFR50.73(A)(2)(i)(B) Which Requires Listed Corrective Actions (← links)
- 05000295/LER-1997-010, Forwards LER 97-010-00 IAW 10CFR50.73(a)(2)(i)(B).Corrective Actions Listed (← links)
- 05000304/LER-1997-007, Forwards LER 97-007-00 Per 10CFR50.73(a)(2)(v)(B) Which Requires Written Rept for Any Event or Condition That Could Prevent Fulfillment of Safety Function of Structures or Sys Needed to Remove Residual Heat.W/Commitments Attach (← links)
- 05000304/LER-1997-006, Forwards LER 97-006-00 Per 10CFR50.73(a)92)(ii)(B) Which Requires 30 Day Written Rept When Any Event or Condition Occurs That Resulted in Condition of Nuclear Power Plant. Regulatory Commitments Encl (← links)
- 05000295/LER-1997-022, Forwards LER 97-022-00 Which Documents Event That Occurred at Zion Nuclear Power Station,Unit 1.Commitments Made within Ltr,Encl (← links)
- 05000304/LER-1997-005, Forwards LER 97-005-00 Which Documents Event That Occurred at Zion Nuclear Power Station,Unit 2.Commitment Made within Ltr,Encl (← links)
- 05000295/LER-1997-001, Forwards LER 97-001-01,which Clarifies Info on Root Cause,Safety Analysis & Event Description.Corrective Actions Updated to Show Status of Items (← links)
- 05000304/LER-1997-003, Forwards LER 97-003-00 Re Unit 2 RHR Sys Declared Inoperable,Per 10CFR50.73(a)(2)(v)(B) (← links)
- 05000304/LER-1997-004, Forwards LER 97-004-00,per 10CFR50.73(a)(2)(i).Commitments Associated W/Correspondence,Encl (← links)
- 05000304/LER-1997-002, Forwards LER 97-002-00,per 10CFR50.73(a)(2)(v)(B),which Requires 30 Day Written Rept.Commitments Associated W/Correspondence,Encl (← links)
- 05000295/LER-1997-026, Forwards LER 97-026-00,per 10CFR50.73(a)(2)(i)(B) Which Requires 30-day Written Rept.Commitments Associated W/Correspondence,Encl (← links)
- 05000304/LER-1997-009, Forwards LER 97-009-00,re Event Which Occurred at Zion Nuclear Power Station,Unit 2.Commitments Made within Ltr Also Encl (← links)
- 05000295/LER-1997-025, Forwards LER 97-025-00,re Event Which Occurred at Zion Nuclear Power Station.Commitments Made within Ltr Aslo Encl (← links)
- 05000304/LER-1997-008, Forwards LER 97-008-00 Per 10CFR50.73(a)(2)(i)(B),which Requires 30 Day Written Rept.Attachment a Provides Commitments Associated W/Correspondence (← links)
- 05000295/LER-1997-011, Forwards LER 97-011-02,re Two Supplements Mistakenly Sent to Nrc.Questions or Comments Should Be Addressed to R Godley.Commitments Listed (← links)
- 05000295/LER-1997-005, Forwards LER 97-005-01,which Requires Thirty Day Written Rept Following Any Operation Prohibited by Plants Tss. Attachment a Provides Commitments Associated with Correspondence (← links)
- 05000295/LER-1997-024, Forwards LER 97-024-00,per 10CFR50.73(a)(2)(i)(B). Commitments Made by Util,Encl (← links)
- 05000295/LER-1997-023, Forwards LER 97-023-00,per 10CFR50.73(a)(2)(ii)(B). Commitments Made by Util,Encl (← links)
- 05000295/LER-1997-021, Forwards LER 97-021-00 Which Requires 30 Day Written Rept When Any Operation or Condition Is Prohibited by Ts,Per 10CFR50.73(a)(2)(ii) (← links)
- ML20217P842 (redirect page) (← links)
- 05000295/LER-1997-015 (redirect page) (← links)
- 05000295/LER-1997-020, Forwards LER 97-020-00 Per 10CFR50.73(a)(2)(ii) & 10CFR50.72(b)(2)(i).Util Is Unclear Whether Plant Is within or Outside Design Basis,Therefore Event Assumed Reportable. Commitments Made by Util,Encl (← links)
- 05000295/LER-1997-004, Forwards LER 97-004-01,which Clarifies Info on Event Description,Root Cause & Safety Analysis.Cas Have Been Updated.No Commitments Have Been Made (← links)
- 05000295/LER-1997-016, Forwards LER 97-016-00 Re Failure to Recognize That 125 Vdc Buses Were Inoperable During Inter Unit cross-tie.Event Investigation Is Ongoing & Corrective Actions Will Be Provided in Supplemental LER (← links)
- 05000295/LER-1997-018, Forwards LER 97-018-01,which Clarifies Info on Event Description,Root Causes & Safety Analysis.Corrective Actions Have Also Been Updated.Commitments Made within Ltr,Encl (← links)
- 05000295/LER-1997-017, Forwards LER 97-017-01,which Clarifies Info on Event Description,Root Causes & Analysis.Cas Have Been Updated. Attachment a Provides Commitments Associated W/ Correspondence (← links)
- 05000304/LER-1997-001, Forwards LER 97-001-00 Per 10CFR50.73(a)(2)(iv) Which Requires Written Rept Using NRC Form 366, License Event Rept, within 90 Days of Discovery of Event.Attachment a Contains Commitments Associated W/Ltr (← links)
- Illinois Department of Nuclear Safety (← links)
- 05000295/LER-1997-019, Forwards LER 97-019-00 Re Failure to Test Safety Related Logic Circuits Required by Tech Specs.Attachment a Provides Commitments Associated W/Correspondence (← links)