Post Outage 90-Day Lnservice Inspection (ISI) Summary Report
ML20028D377
Person / Time
Site: Clinton Constellation icon.png
Issue date: 01/15/2020
From: Kowalski J
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
U-604527
Download: ML20028D377 (1)


Text

Clinton Power Station 8401 Power Road Clinton, IL 61727 U-604527 10 CFR 55.55a(g)

Janu ary 15, 2020 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRG Docket No. 50-461

Subject:

Post Outage 90-Day lnservice Inspection (ISi) Summary Report In accordance with 10 CFR 50.55a, Codes and Standards, paragr aph (g), "lnservice Inspection Requirements," Exelon Generating Company (EGG)

, LLC is required to maintain an lnservice Inspection Program in accordance with the Americ an Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code. Please find enclosed the Post-Outage (90-Day) ISi Summary Report for the Clinton Power Station, Unit 1, for examinations and repair/replacement activities performed between May 22, 2018, (i.e., end of the 18th refueling outage) and October 17, 2019 (i.e., end of the 19th refueling outage

).

, ~,.. I , .: ** ; ~ '

The Post Out~ge Sum~ ary 'ReporLi~ being submitted in acc~rd ance with the requirements of ASME Section Xl,.Article .IWA-6200; Paragraph IWA-6230. The 19th refueling outage was the

  • secon d refueling outage in the third inspection period of the third inspection interval that began on July 1, 201 o.

. ; ~-, *, . . . ', : . . -~ l ._: ~-.

'This lett~r.cont~ins ~o reguia*t~ry com~i tments .

Please direct any questions you may have regarding this submit tal to Mr. Dale A. Shelton, Regulatory Assurance Manager, at (217) 937-2800.

Respectfully,

-~

John J. Kowalski Plant Manag er Clinton Power Station NS Attach ment Clinton Power Station, lnservice Inspection Summary Report cc{

. .. , ,* ~ ' '

Regional Admin istrato r~NRC *Region Ill NRG Senior.. Resident Inspection - Clinton- Power Station.:

Ao.4-7

' : ..

  • Office of Nuclear Facility Safety - I EMA Division of Nuclea r Safety

/\(JK r:-. .~  :.

..\'