ML17184A012

From kanterella
Jump to navigation Jump to search

Acceptance for Review of Application Concerning Revisions to the Technical Specifications (CAC No. MF9818) (L-17-042)
ML17184A012
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 07/13/2017
From: Kimberly Green
Plant Licensing Branch III
To: Hamilton D
FirstEnergy Nuclear Operating Co
Green K
References
CAC MF9818, L-17-042
Download: ML17184A012 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 13, 2017 Mr. David B. Hamilton Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081-0097

SUBJECT:

PERRY NUCLEAR POWER PLANT, UNIT 1 -ACCEPTANCE FOR REVIEW OF APPLICATION CONCERNING REVISIONS TO THE TECHNICAL SPECIFICATIONS FOR THE ALTERNATIVE SOURCE TERM INITIATIVE (CAC NO. MF9818) (L-17-042)

Dear Mr. Hamilton:

By letter dated June 8, 2017, First Energy Nuclear Operating Company (FENOC) submitted a license amendment request (LAR) for the Perry Nuclear Power Plant (PNPP). The proposed amendment would revise the technical specifications (TSs) to reflect previously approved license basis changes as part of the alternative source term initiative; align some TS sections with NUREG-1434, Revision 4, "Standard Technical Specifications - General Electric BWR/6 Plants"; and delete two TS sections. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of the proposed LAR.

The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 1O of the Code of Federal Regulations (1 O CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 525 hours21.875 days <br />3.125 weeks <br />0.719 months <br /> to complete. The NRC staff expects to complete this review by the requested dated of June 11, 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted

D. Hamilton completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates will be communicated, during the routine interactions.

These estimates are based on the staff's initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.

If you have any questions, please contact me at (301) 415-1627.

Sincerely, Kimberly J. Gree , Senior Project Manager Plant Licensing Branch 111 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-440 cc: Distribution via ListServ

ML17184A012 OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/DORL/LPL3/BC NRR/DORL/LPL3/PM NAME KGreen SRohrer DWrona KGreen DATE 07/06/2017 07/05/2017 07/13/2017 07/13/2017