MONTHYEARML24129A1762024-06-14014 June 2024 National Historic Preservation Act Section 106 Consultation – Results of Identification and Evaluation (Docket Number: 72-026) DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 ML23307A1622023-11-0303 November 2023 OIG-24-A-01 Inspector Generals Assessment of the Most Serious Management and Performance Challenges Facing the U.S. Nuclear Regulatory Commission in Fiscal Year 2024 ML23130A0052023-06-27027 June 2023 Report to Congress Regarding Diablo Canyon ML22108A2892022-05-0303 May 2022 Enclosure - Response to Representative Carbajal Regarding OIG Report on Diablo ML22108A1662022-05-0303 May 2022 Enclosure 1 - Assessment Event Inquiry Into the Nuclear Regulatory Commission Oversight of the Auxiliary Feedwater System at Diablo Canyon Nuclear L-22-003, Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation2022-03-0909 March 2022 Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation DCL-21-071, Federally Listed Species Affects Determination Memorandum2021-10-14014 October 2021 Federally Listed Species Affects Determination Memorandum ML21188A0362021-07-0707 July 2021 Draft PG&E Letter DCL-21-046 - Diablo Canyon Unit 1: Emergency License Amendment Request 21-05, Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML21076A6142021-03-17017 March 2021 NRC Examination Report 05000275/2021301 and 05000323/2021301 ML20353A3972020-12-18018 December 2020 NRC Response to Public Comment Regarding Spent Fuel Canister Drop from 2019 Regcon DCL-20-102, Nuclear Material Transaction Report for New Fuel2020-12-0909 December 2020 Nuclear Material Transaction Report for New Fuel ML20335A0132020-11-30030 November 2020 NRC Response to Public Watchdogs November 2 ML20328A3012020-11-23023 November 2020 NERC Reliability Standards for the Bulk Electric System of North America Updated July 20, 2020 (Cgnp Public Comments on Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Pre-submittal Meeting of 11/24/2020) ML20239A9562020-08-26026 August 2020 Evaluation of the Potential Piping Degradation Safety Concern on the Auxiliary Feedwater System at Diablo Canyon Unit 1 DCL-19-054, Submittal of Acceptance Report Following the Installation of Structural Weld Overlay, REP-RHR-SWOL for Unit 12019-07-0101 July 2019 Submittal of Acceptance Report Following the Installation of Structural Weld Overlay, REP-RHR-SWOL for Unit 1 ML18254A0402019-01-22022 January 2019 Staff Review of Seismic Probabilistic Risk Assessment Associated with Reevaluated Seismic Hazard Implementation of the Near Term Task Force Recommendation 2.1: Seismic DCL-18-050, Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 22018-09-11011 September 2018 Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 2 IR 05000275/20180052018-08-31031 August 2018 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2018005 and 05000323/2018005) DCL-18-058, Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-72018-08-0808 August 2018 Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-7 DCL-18-027, Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 & 2 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the Near-Term Task Force Review of Insight2018-04-24024 April 2018 Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 & 2 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the Near-Term Task Force Review of Insights ML17024A2072017-12-18018 December 2017 Staff Assessment of Response to 10 CFR 50.54(F) Information Request Flood-Causing Mechanism Reevaluation ML17341A0652017-11-30030 November 2017 Technical Evaluation Report Diablo Canyon Nuclear Power Plant Tsunami Hazard Reevaluation Review ML17334A1052017-11-29029 November 2017 Reactor Coolant System Pressure and Temperature Limits Report ML17229B6172017-08-17017 August 2017 Flaw Evaluation of Residual Heat Removal Suction Weld Joint DCL-17-064, Plant Focused Evaluation Report for External Flooding2017-07-19019 July 2017 Plant Focused Evaluation Report for External Flooding DCL-17-049, Flaw Evaluation of Unit 2 Residual Heat Removal Suction Weld Joint2017-05-18018 May 2017 Flaw Evaluation of Unit 2 Residual Heat Removal Suction Weld Joint DCL-16-117, Reactor Coolant System Pressure and Temperature Limits Report, Revision 152016-11-10010 November 2016 Reactor Coolant System Pressure and Temperature Limits Report, Revision 15 ML16314C6912016-11-0909 November 2016 Enclosure, Statement of the Problem Concerning PWR Primary Coolant System Pipe Rupture DCL-16-124, Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 52016-11-0909 November 2016 Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 5 ML16314B0822016-11-0909 November 2016 Criteria for Protection Against Dynamic Effects Associated with a Postulated Rupture of Piping ML16287A7552016-10-0606 October 2016 Technical Assessment Implementation of Alternative Source Terms Summary of Dose Analyses and Results Revision 4 ML16215A1092016-08-0202 August 2016 OEDO-16-00436 - Supplemental Information from Mr. Lochbaum 10 CFR 2.206 Petition on Apparent Violation of 10 CFR 50.9 at Diablo Canyon Nuclear Power Plant ML16169A2652016-05-18018 May 2016 Technical Report, Implementation of Alternative Source Terms Summary of Dose Analysis and Results, Revision 3 ML16146A0952016-04-21021 April 2016 54006-CALC-01, Diablo Canyon Power Plant: Evaluation of Risk Significance of Permanent ILRT Extension. ML16238A1042016-03-31031 March 2016 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm). DCL-16-081, 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm).2016-03-31031 March 2016 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm). ML16019A2242016-02-0101 February 2016 Record of Review, Dispositions to Diablo Canyon Nuclear Plant, Units 1 and 2, Internal Events, Internal Flooding, Seismic, and Fire PRA Facts and Observations ML16061A4642016-01-15015 January 2016 Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi ML16061A4682016-01-15015 January 2016 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV DCL-16-020, Diablo Canyon, Units 1 and 2 - 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV2016-01-15015 January 2016 Diablo Canyon, Units 1 and 2 - 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi2016-01-15015 January 2016 Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi ML16061A4592016-01-14014 January 2016 Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report2016-01-14014 January 2016 Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report ML16048A2072015-12-15015 December 2015 Once Through Cooling ML16048A2152015-12-15015 December 2015 Fleet Vehicle-Asset List ML16004A3542015-12-11011 December 2015 Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Terms Summary of Dose Analysis & Results, Revision 1 DCL-15-134, ISFSI - Submits 2014 Annual Commitment Change Summary Report2015-11-0505 November 2015 ISFSI - Submits 2014 Annual Commitment Change Summary Report DCL-15-102, 10 CFR 71.95 Report Regarding Energy Solutions' Model 8-120B Shipping Cask2015-08-24024 August 2015 10 CFR 71.95 Report Regarding Energy Solutions' Model 8-120B Shipping Cask 2024-06-14
[Table view] Category:Technical
MONTHYEARDCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage ML23307A1622023-11-0303 November 2023 OIG-24-A-01 Inspector Generals Assessment of the Most Serious Management and Performance Challenges Facing the U.S. Nuclear Regulatory Commission in Fiscal Year 2024 L-22-003, Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation2022-03-0909 March 2022 Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation ML21076A6142021-03-17017 March 2021 NRC Examination Report 05000275/2021301 and 05000323/2021301 ML20239A9562020-08-26026 August 2020 Evaluation of the Potential Piping Degradation Safety Concern on the Auxiliary Feedwater System at Diablo Canyon Unit 1 DCL-19-054, Submittal of Acceptance Report Following the Installation of Structural Weld Overlay, REP-RHR-SWOL for Unit 12019-07-0101 July 2019 Submittal of Acceptance Report Following the Installation of Structural Weld Overlay, REP-RHR-SWOL for Unit 1 DCL-18-050, Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 22018-09-11011 September 2018 Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 2 DCL-18-058, Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-72018-08-0808 August 2018 Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-7 DCL-18-027, Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 & 2 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the Near-Term Task Force Review of Insight2018-04-24024 April 2018 Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 & 2 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the Near-Term Task Force Review of Insights ML17341A0652017-11-30030 November 2017 Technical Evaluation Report Diablo Canyon Nuclear Power Plant Tsunami Hazard Reevaluation Review ML17334A1052017-11-29029 November 2017 Reactor Coolant System Pressure and Temperature Limits Report ML17229B6172017-08-17017 August 2017 Flaw Evaluation of Residual Heat Removal Suction Weld Joint DCL-17-064, Plant Focused Evaluation Report for External Flooding2017-07-19019 July 2017 Plant Focused Evaluation Report for External Flooding DCL-17-049, Flaw Evaluation of Unit 2 Residual Heat Removal Suction Weld Joint2017-05-18018 May 2017 Flaw Evaluation of Unit 2 Residual Heat Removal Suction Weld Joint ML16314B0822016-11-0909 November 2016 Criteria for Protection Against Dynamic Effects Associated with a Postulated Rupture of Piping ML16314C6912016-11-0909 November 2016 Enclosure, Statement of the Problem Concerning PWR Primary Coolant System Pipe Rupture DCL-16-124, Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 52016-11-0909 November 2016 Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 5 ML16287A7552016-10-0606 October 2016 Technical Assessment Implementation of Alternative Source Terms Summary of Dose Analyses and Results Revision 4 ML16169A2652016-05-18018 May 2016 Technical Report, Implementation of Alternative Source Terms Summary of Dose Analysis and Results, Revision 3 ML16146A0952016-04-21021 April 2016 54006-CALC-01, Diablo Canyon Power Plant: Evaluation of Risk Significance of Permanent ILRT Extension. DCL-16-081, 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm).2016-03-31031 March 2016 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm). ML16238A1042016-03-31031 March 2016 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm). ML16061A4642016-01-15015 January 2016 Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi ML16061A4682016-01-15015 January 2016 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi2016-01-15015 January 2016 Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi DCL-16-020, Diablo Canyon, Units 1 and 2 - 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV2016-01-15015 January 2016 Diablo Canyon, Units 1 and 2 - 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report2016-01-14014 January 2016 Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report ML16061A4592016-01-14014 January 2016 Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report ML16004A3542015-12-11011 December 2015 Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Terms Summary of Dose Analysis & Results, Revision 1 DCL-15-134, ISFSI - Submits 2014 Annual Commitment Change Summary Report2015-11-0505 November 2015 ISFSI - Submits 2014 Annual Commitment Change Summary Report DCL-15-069, Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 82015-05-15015 May 2015 Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 8 ML15176A5282015-05-15015 May 2015 License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 8 ML16061A4752014-12-12012 December 2014 Revision 0 to 993754-14-854-1-NP, Protection Set Iv, Factory Acceptance Test Report ML16061A4712014-12-12012 December 2014 Revision 0 to 993754-12-854-1-NP, Protection Set Ii, Factory Acceptance Report DCL-16-020, Revision 0 to 993754-13-854-1-NP, Protection Set III, Factory Acceptance Test Report2014-12-12012 December 2014 Revision 0 to 993754-13-854-1-NP, Protection Set III, Factory Acceptance Test Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-854-1-NP, Protection Set Ii, Factory Acceptance Report2014-12-12012 December 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-854-1-NP, Protection Set Ii, Factory Acceptance Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-854-1-NP, Protection Set Iv, Factory Acceptance Test Report2014-12-12012 December 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-854-1-NP, Protection Set Iv, Factory Acceptance Test Report ML16061A4602014-12-0909 December 2014 Revision 9 to 993754-1-915-NP, Safety Analysis DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 9 to 993754-1-915-NP, Safety Analysis2014-12-0909 December 2014 Diablo Canyon, Units 1 and 2 - Revision 9 to 993754-1-915-NP, Safety Analysis ML16061A4732014-12-0101 December 2014 Revision 0 to 993754-14-818-NP, Protection Set Iv, System Time Response Confirmation Report ML16061A4692014-12-0101 December 2014 Revision 0 to 993754-13-818-NP, Protection Set Ii, System Time Response Confirmation Report ML16061A4662014-12-0101 December 2014 Revision 0 to 993754-12-818-NP, Protection Set Ii, System Time Response Confirmation Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-13-818-NP, Protection Set Ii, System Time Response Confirmation Report2014-12-0101 December 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-13-818-NP, Protection Set Ii, System Time Response Confirmation Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-818-NP, Protection Set Ii, System Time Response Confirmation Report2014-12-0101 December 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-818-NP, Protection Set Ii, System Time Response Confirmation Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-818-NP, Protection Set Iv, System Time Response Confirmation Report2014-12-0101 December 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-818-NP, Protection Set Iv, System Time Response Confirmation Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-854-0-NP, Protection Set Iv, Hardware Validation Test Report2014-09-12012 September 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-854-0-NP, Protection Set Iv, Hardware Validation Test Report ML16061A4702014-09-12012 September 2014 Revision 0 to 993754-12-854-0-NP, Protection Set Ii, Hardware Validation Test Report ML16061A4742014-09-12012 September 2014 Revision 0 to 993754-14-854-0-NP, Protection Set Iv, Hardware Validation Test Report ML16061A4762014-09-12012 September 2014 Revision 0 to 993754-13-854-0-NP, Protection Set Iii, Hardware Validation Test Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-854-0-NP, Protection Set Ii, Hardware Validation Test Report2014-09-12012 September 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-854-0-NP, Protection Set Ii, Hardware Validation Test Report 2024-05-08
[Table view] |
Text
I PACIFIC GAS AND EJ.,ECTRIC COMPANY GEOSCIENCES DEPARTMENT TECHNICAL REPORT RetlOl't Numbe**: GEO. DCPP.TR.l4.07 Rtport Revision:
Rev. 0 Report Date: 8/111014 Quality Related: Y Page 1 of82 REPORT TITLE: Response to Administrative Law Judge's Decision Number 12-09*008 Regarding Dr. Douglas Hamilton's Concerns GEOPHYSICS VERIFIED BY: APPROVED BY: Printed Name Organization Printed Name Mr Richard Klimc.1.ak Printed Name TE: A;;,_,.fif Fugro Consultants.
Inc. Organization DATE: PG&E Geosciences Department Organization RECORD OF REVISIONS 0 Initial Release. This work was defined and tracked under SAPN 50638223. 8/1/2014 TABLE OF CONTENTS Signatories ...................................................................................................................... 1 Record of Revisions ........................................................................................................ 2 Lists of Tables, Figures, and Attachments ....................................................................... 5 Abbreviations and Acronyms ........................................................................................... 8
1.0 INTRODUCTION
..................................................................................................
10 1.1 Purpose .......................................................................................................
11 1.2 Intended Use of the Results .........................................................................
11 1.3 Scope of Work .............................................................................................
11 1.4 Project Quality Assurance Program, Participating Organizations, and Responsibilities ............................................................................................
12 2.0 ASSUMPTIONS ...................................................................................................
13 3.0 DATA ....................................................................................................................
14 4.0 METHODOLOGY ................................................................................................. 17 4.1 MBES Data ..................................................................................................
17 4.2 Construction of Geologic Cross Sections
.....................................................
18 4.3 Seismic-Reflection Profiles ...........................................................................
18 4.4 Interpretation of Diabase Intrusion Geometry from Tomographic Data
......... 19 5.0 SOFTWARE .........................................................................................................
20 6.0 RESULTS AND ANALYSIS ..................................................................................
21 6.1 Hamilton .......................................................................................................
21 6.2 Diablo Cove Fault .........................................................................................
22 6.2.1 Direct Observations of the Diablo Cove Fault ...................................
24 6.2.2 Diablo Cove Fault Model of Dr. Hamilton ..........................................
28 6.2.3 Evaluation of the Diablo Cove Fault Model .......................................
31 6.2.4 Conclusion with Respect to the Diablo Cove Fault
............................
40 6.3 San Luis Range/ IOF Thrust .........................................................................
40 6.3.1 Previous Interpretations of Seismic Sources .....................................
41 6.3.2 San Luis Range/ IOF Thrust Model of Dr. Hamilton
..........................
47 6.3.3 Analysis of Uplift Rate Boundaries ....................................................
51
6.3.4 Analysis
of Seismicity and Seismic-Reflection Data
..........................
58 6.3.5 Evaluation .................
70
7.0 CONCLUSION
S ...................................................................................................
73 8.0 LIMITATIONS .......................................................................................................
75 9.0 IMPACT EVALUATION ........................................................................................
76
10.0 REFERENCES
.....................................................................................................
77 LISTS OF TABLES, FIGURES, AND ATTACHMENTS Tables Figures
Attachments ABBREVIATIONS AND ACRONYMS
1.0 INTRODUCTION
1.1 Purpose
1.2 Intended
Use of the Results
1.3 Scope
of Work
1.4 Project
Quality Assurance Program, Participating Organizations, and Responsibilities
2.0 ASSUMPTIONS
3.0 DATA
4.0 METHODOLOGY
4.1 MBES Data
4.2 Construction
of Geologic Cross Sections
4.3 Seismic-Reflection Profiles
4.4 Interpretation
of Diabase Intrusion Geometry from Tomographic Data
5.0 SOFTWARE
6.0 RESULTS
AND ANALYSIS 6.1 by Dr. Hamilton
6.2 Diablo
Cove Fault
6.2.1 Direct
Observations of the Diablo Cove Fault
6.2.1.1 Locations of the Faulting
6.2.1.2 Nature of the Faulti ng
6.2.1.3 Activity of the Faulting
6.2.1.4 Summary
6.2.2 Diablo
Cove Fault Model of Dr. Hamilton
6.2.2.1 Location of the Faulting
6.2.2.2 Nature of the Faulting
6.2.2.3 Activity of the Faulting
6.2.2.4 Dip and Depth Extent
6.2.3 Evaluation
of the Diablo Cove Fault Model 6.2.3.1 Diablo Cove Fault Onshore
6.2.3.2 Diablo Cove Fault Offshore
6.2.3.3 Downdip Width of the Diablo Cove Fault
6.2.3.4 Diablo Cove Style of Faulting
6.2.3.5 Diablo Cove Fault Activity
6.2.4 Conclusion
with Respect to the Diablo Cove Fault
6.3 San Luis Range/ IOF Thrust
6.3.1 Previous
Interpretations of Seismic Sources
6.3.1.1 University of Nevada, R eno Interpretation of the IOF
6.3.1.2 LTSP Interpretation of the San Luis Bay Fault Z one
6.3.1.3 PG&E Interpretation of the Shoreline Fault Zone
6.3.2 San Luis Range/ IOF Thrust Model of Dr. Hamilton
6.3.2.1 Location of the Faulting
6.3.2.2 Dip and Width
6.3.2.3 Nature of the Faulting
6.3.2.4 Slip Rate
6.3.2.5 Summary of the Proponent M odel
6.3.3 Analysis
of Uplift Rate Boundaries 6.3.3.1 San Luis Range Uplift Rate Boundaries
6.3.3.2 Evaluation of the San Luis Range/ IOF Thrust as an Uplift Rate Boundary
6.3.4 Analysis
of Seismicity and Seismic-Reflection Data
6.3.4.1 Seismicity Evidence for an East-Dipping Fault Beneath the Irish HillsAssessment
Table 6-1. Number of Earthquakes as a Function of Magnitude in the Seismicity Analysis Box Shown on Figure 6-42 0 to <1 56 1 to <2 122 2 to <3 24 3 to <4 3
6.3.4.2 Evaluation of Seismicity Beneath the Irish Hills by Dr. Hardebeck
6.3.4.3 Evaluation of the SLRF from Seismic-Reflection Data near Point San Luis
6.3.5 Evaluation
of Dr. San Luis Range/ IOF Thrust 6.3.5.1 Fault Location at the Surface
6.3.5.2 Fault Dip and Location at Depth
6.3.5.3 Uplift Rate Boundary
6.3.5.4 Fit to Coastal Terrace Data
7.0 CONCLUSION
S
8.0 LIMITATIONS
9.0 IMPACT
EVALUATION
10.0 REFERENCES
VERIFICATION
SUMMARY
REPORT !tern Parameter 1 Purpose is clearly stated and the report satisfies the Puroose. 2 Data to be interpreted and/or analyzed are included or referenced.
3 Methodology is aoorooriate and properlv applied. 4 Assumptions are reasonable, adequately described, and based upon sound geotechnical principles and oractices.
5 Software is identified and properly appl i ed. Validation is referenced or included, and is acceptable.
Input files are correct. 6 Interpretation and/or Analysis is complete, accurate, and leads to Results and Conc l us i ons. 7 Results and Conclusions are accurate, acceptab l e, and reasonable compared to the Data, interpretat i on and/or analvsis and Assumptions. 8 The Lim.itation on the use of the Results has been addressed and is accurate and complete. 9 The Impact Eva l uat i on h as been included and is accurate and comolete.
10 References are valid for in ten d ed use. II Annendices are co m plete, acc u rate, and suooort text. X X X X X X X X X X Page I of 1. GEO.DCPP.TR
.14.07 RO Attachment 1 Yes No* NIA* NIA
- Explain "No" or N/ A" entries. (For examp l e, Items 3 th ru 7 would be N/ A for a data report that simply presents the collected data.) Comments (use additional pages as necessary):
General: All comments made to earlie r drafts of Rev. 0 (submitted on July 14, 2014 , July 20, 2014 , July 28, 2014, and July 31, 2014) were addressed satisfactorily.
There are no outstanding issues to be resolved.
Item 5: This report identifies the software u sed to analyze geologic and geophysical data and to prepare figures. None of these software required specific va l idation. The report directs the reader to appropriate reports where p ertinent software va li dation n eeded to support statements/results ci t ed in this report reside. Item II: No appendices are included in this rep ort. Th is review co n firmed that no appendix was referred to in the body of the report.
VERIFICATION
SUMMARY
REPORT Item Parameter 1 Purpose is clearly stated and the report satisfies the Purpose. 2 Data to be interpreted and/or analyzed are included or referenced.
3 Methodology is appropriate and properly applied. 4 Assumptions are reasonable, adequately described, and based upon sound geotechnical principles and practices.
5 Software is identified and properly applied. Validation is referenced or included, and is acceptable.
Input files are correct. 6 Interpretation and/or Analysis is complete, accurate, and leads logically to Results and Conclusions.
7 Results and Conclusions are accurate, acceptable, and reasonable compared to the Data, interpretation and/or analysis, and Assumptions.
8 The Limitation on the use of the Results has been addressed and is accurate and complete.
9 The Impact Evaluation has been included and is accurate and complete.
10 References are valid for intended use. 11 Appendices are complete, accurate, and support text. Page 1 of 1 GEO.DCPP.TR.l4.07 RO Attachment 1 Yes No* N/A* X X X X X X X X X X N/A
- Explain "No" or "N/A" entries. (For example, Items 3 thru 7 would beN/A for a data report that simply presents the collected data.) Comments (use additional pages as necessary):
On this date I have reviewed corrections and modifications made to this report and have found previous comments to be satisfactorily addressed.
Minor, mostly editorial comments have been provided and there are no pending issues to resolve. No appendices were provided with the report and I have verified that none were referenced in the text. Verifier (ITR):