St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix E, Supplement to Licensing Report Section 2.4.1 Reactor Protection, Engineered Safety Feature Actuation, and Control Systems
ML110730305
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 02/25/2011
From:
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
L-2011-021
Download: ML110730305 (8)


Text

St. Lucie Unit 2 EPU Licensing Report App. E-1Supplement to Licensing Report Section 2.4.1St. Lucie Unit 2L-2011-021Docket No. 50-389Attachment 5St. Lucie Unit 2Extended Power UprateLicensing ReportAttachment 5Appendix ESupplement to Licensing Report Section 2.4.1Reactor Protection, Engineered Safety Features Actuation,and Control SystemsThis cover sheet plus 7 pages St. Lucie Unit 2 EPU Licensing Report App. E-2Supplement to Licensing Report Section 2.4.1St. Lucie Unit 2L-2011-021Docket No. 50-389Attachment 5PurposeThe low steam generator (SG) level trip was the only plant protection system setpoint changed for the extended power uprate (EPU). This appendix provides supplemental information related to the design basis of the reactor protection system (RPS) setpoint for the low SG level trip function.The appendix is formatted in three major sections: (I) an overview of the safety system setpoint control program pertaining to work performed for EPU, (II) a description of the compliance with recent setpoint methodology changes as described in NRC Regulatory Issue Summary (RIS)2006-17, NRC Staff Position on the Requirements of 10 CFR 50.36, "Technical Specifications," Regarding Limiting Safety System Settings During Periodic Testing and Calibration of Instrument Channels, and (III) a summary of the low SG level setpoint / uncertainty calculations.I.OVERVIEW OF THE ST. LUCIE SAFETY SYSTEM SETPOINT CONTROL PROGRAM PERTAINING TO WORK PERFORMED FOR EPUSt. Lucie Unit 2 has three distinct cabinet based electronic systems that collectively constitute the safety systems (a.k.a., plant protection systems). These individual systems are the RPS, the engineered safety features actuation system (ESFAS), and the auxiliary feedwater actuation system (AFAS). The RPS trip setpoints and surveillance requirements are controlled in Technical Specification (TS) Table 2.2-1 and Table 4.3-1 respectively. The ESFAS and AFAS setpoints and surveillance requirements are controlled in TS Table 3.3-4 and Table 4.3-2, respectively.Florida Power and Light (FPL) uses a combination of three documents to initially establish, and subsequently maintain compliance with, each TS setpoint value. These three documents are the instrument channel uncertainty calculation, the safety analysis plant parameters (SAPP) document, and the instrument channel setpoint calculation.An instrument uncertainty calculation exists for each safety system input parameter. These calculations determine the various elements of uncertainty applicable to each component within that instrument channel from the sensor/transmitter up to the protection system cabinet input. These loop uncertainty calculations have been prepared by FPL in accordance with FPL discipline standard IC-3.17, Instrument Setpoint Methodology. IC-3.17 is in turn based on ISA Standard 67.04, Setpoints for Nuclear Safety Related Instrumentation, and Regulatory Guide (RG) 1.105, Instrument Setpoints for Safety Related Systems. Elements of uncertainty for individual components, such as setting tolerance, measuring & test equipment and drift are specifically based on associated surveillance procedure requirements and test frequencies. Environmental effects for both normal and harsh conditions are determined for each loop component as applicable. All safety system instrument channel uncertainty calculations were reviewed and revised as necessary in support of the EPU.The SAPP document serves as a bridge between the instrument channel setpoint calculations and the safety analysis. The bounding uncertainty allowance (UA) applicable to each protection system function is documented and managed in the SAPP. Where applicable, the SAPP includes St. Lucie Unit 2 EPU Licensing Report App. E-3Supplement to Licensing Report Section 2.4.1St. Lucie Unit 2L-2011-021Docket No. 50-389Attachment 5individual bounding UAs for both normal and harsh conditions. The rationale for managing the trip function UAs in the SAPP is as follows:*All inputs used for the safety analysis are managed in the SAPP. This organization facilitates the safety analysis work required for each reload. In this regard, the trip function UAs are no different than any other SAPP managed analysis input parameter.*Including bounding trip function UAs in one common document promotes consistent use of analytical limit values throughout the safety analysis which facilitates effective margin management. For example, the analytical limit used for the high pressurizer pressure trip should ideally be the same for all events that credit this trip function.*Including bounding trip function UAs in the SAPP eliminates the need for documenting the analytical limits in the setpoint calculations. Therefore the purpose of the setpoint calculations is to verify that the trip function UAs in the SAPP are bounding with respect to the calculated total channel uncertainty.*Including bounding trip function UAs in the SAPP reflects St. Lucie operating experience where protection system TS setpoints are infrequently changed in comparison with analytical limits and calculated loop uncertainties.A second calculation exists for each safety system input parameter. Each of these calculations combines the loop component uncertainties (from the corresponding FPL calculations) with the protection system cabinet uncertainties to determine an overall total loop uncertainty (TLU). These setpoint calculations also verify that the UAs defined in the SAPP are bounding. Further, these setpoint calculations determine operability limits (OL) for the related actuation functions. These calculations have been prepared in accordance with IC-3.17, ISA Standard 67.04, and RG1.105. All safety system instrument channel setpoint calculations were reviewed and revised as necessary in support of the EPU.II.COMPLIANCE WITH RECENT SETPOINT METHODOLOGY CHANGES AS DESCRIBED IN RIS 2006-17As discussed in the preceding section, there is an uncertainty calculation and a setpoint calculation associated with each plant protection system input parameter. These calculations were revised as necessary as part of the EPU to comply with recent setpoint methodology changes described in RIS 2006-17. Conformance with key issues raised in RIS 2006-17 is summarized in the following paragraphs:NRC guidance provided in RIS 2006-17 stipulates that as-left setting tolerance should be explicitly accounted for in the setpoint determination. More specifically, since the walk-away equipment setpoint may be left anywhere within the as-left band, this allowed setting tolerance must be treated as a bias in the setpoint determination. RIS 2006-17 further stipulates that the surveillance procedures must ensure that the trip setpoint is restored to within the as-left band before the channel is returned to service. To comply with this NRC guidance, the verification that the SAPP defined UA is bounding (as performed in the setpoint calculations per above discussion) has been structured to ensure that TLU plus setting tolerance (ST) is less than or equal to the SAPP UA (TLU + ST SAPP UA). The ST is algebraically added to TLU (for SAPP allowance verification) and is also included as a random / independent term in the St. Lucie Unit 2 EPU Licensing Report App. E-4Supplement to Licensing Report Section 2.4.1St. Lucie Unit 2L-2011-021Docket No. 50-389Attachment 5root-sum-square TLU calculation. Consistent with RIS 2006-17 guidance, St. Lucie protection system surveillance procedures require that trip setpoints are restored to within the as-left band before the channel is returned to service. Using this methodology, the SAPP UAs have been verified to be bounding for all protection system functions at EPU conditions. Since the safety analysis Analytical Limits are based on the algebraic combination of the TS setpoint and the SAPP UA, it has also been verified that all TS setpoints are sufficiently conservative at EPU conditions to ensure that applicable safety limits will not be exceeded if a design basis event occurs before the next periodic surveillance.NRC guidance provided in RIS 2006-17 stipulates use of an as-found acceptance criteria band centered about the nominal equipment setpoint as a measure of instrument channel operability. To comply with this NRC guidance, the setpoint calculations have been structured to include determination of an operability limit (OL) band. For St. Lucie, the OL band is synonymous with the as-found acceptance criteria band. The St. Lucie Unit-2 protection system monthly functional surveillance procedures will be revised as necessary to ensure an evaluation of loop conditions is performed under the corrective action program (CAP) when the as-found setpoint is outside of the as-found acceptance criteria.Historically, St. Lucie has used an as-found tolerance band width equal to 2 times the procedure ST as the basis for initiation of corrective action under the CAP program. This existing as-found tolerance band width meets the intent of the NRC guidance since the previous as-left setting may be anywhere within one ST band width, leaving just one ST band width for accommodation of drift and other periodic test uncertainties. As-found readings within the allowed ST are not typically optimized in the monthly functional surveillance procedures. Therefore the as-left setting tolerance is treated as a bias. Several other methodologies for calculation of OL band width based on statistical combination of drift and other periodic test uncertainty effects were considered, but rejected, since the resultant OL bands were either larger or smaller than reasonable. This result is due to differences in the relative magnitude of manufacturer' specifications for bistable uncertainty effects among the three plant protection systems (in particular, the RPS and AFAS bistable drift specifications are negligible). Therefore, the OL band (synonymous with the as-found acceptance criteria) is based on 2 times the ST and is normally centered about the nominal equipment setting. For some trip functions the existing ST is non-symmetrical about the nominal trip setpoint and for these functions the OL band is structured to provide equal tolerance above and below the ST limits.The following two notes will be added to TS Table 2.2-1, and these notes will be designated as being applicable to the RPS Low SG Level trip function since this is the only setpoint changed for EPU. These footnotes are consistent with the two recommended notes provided in NRC letter to the Nuclear Energy Institute (NEI), Technical Specification For Addressing Issues Related to Setpoint Allowable Values, and meet the intent of the corresponding footnotes provided as part of Option A of Revision 4 of Technical Specification Task Force (TSTF)-493, Clarify Application of Setpoint Methodology for LSSS Functions. Since the TSTF-493 footnotes are based on the format of standard TS and the format of the St. Lucie Unit 2 RPS TS differs from that of standard St. Lucie Unit 2 EPU Licensing Report App. E-5Supplement to Licensing Report Section 2.4.1St. Lucie Unit 2L-2011-021Docket No. 50-389Attachment 5TS, the notes provided in the above cited NRC letter to NEI are more suitable for use in the St.Lucie Unit 2 TS.1.If the as-found channel setpoint is either outside its predefined as-found acceptance criteria band or is not conservative with respect to the Allowable Value, then the channel shall be declared inoperable and shall be evaluated to verify that it is functioning as required before returning the channel to service.2.The instrument channel setpoint shall be reset to a value that is within the as-left tolerance of the Trip Setpoint, or a value that is more conservative than the Trip Setpoint, otherwise that channel shall not be returned to Operable status. The Trip Setpoint and the methodology used to determine the Trip Setpoint, the as-found acceptance criteria band, and the as-left acceptance criteria are specified in the UFSAR.

St. Lucie Unit 2 EPU Licensing Report App. E-6Supplement to Licensing Report Section 2.4.1St. Lucie Unit 2L-2011-021Docket No. 50-389Attachment 5III.

SUMMARY

OF LOW SG LEVEL SETPOINT/UNCERTAINTY CALCULATIONSThis summary uses the following terms and acronyms:ADevice reference accuracyBTUBistable trip unitCCalibration tolerance (where used combines ST and M&TE)DDriftFTSPField trip setpointLTLevel transmitterLYLevel channel signal converterMMeasuring and test equipment (M&TE)OL+Upper operability limitOL-Lower operability limitPSPower supplyRRadiation effects (Ra and Rn for accident and normal)REPRepeatabilityRLEReference leg effect (RLEa and RLEn for accident and normal)SAPPSafety analysis plant parametersSPEStatic pressure effectSQRTSquare rootSTSetting toleranceTTemperature Effect (Ta and Tn for accident and normal)TLUTotal loop uncertainty (TLUa and TLUn for accident and normal)UAUncertainty AllowanceFor the RPS Low SG Level trip function, the channel consists of a Rosemount Model 1154 transmitter, a Foxboro model 2AI-I2V I/E signal converter, a Foxboro model 2AO-V2I E/I signal converter and the Electro Mechanics model 34860 RPS bistable trip unit (BTU). Device uncertainties that were determined to be both applicable and non-negligible are summarized in TableE-1. Although not referenced herein, other effects, including dynamic effects, were also evaluated.Total Loop Uncertainty Calculations and SAPP Uncertainty Allowance VerificationThe Total Loop Uncertainty (TLUn) with normal environmental conditions for the RPS Low Steam Generator Level trip function is calculated as follows:

St. Lucie Unit 2 EPU Licensing Report App. E-7Supplement to Licensing Report Section 2.4.1St. Lucie Unit 2L-2011-021Docket No. 50-389Attachment 5TLUn = SQRT (A_LT2 + C_LT2 + D_LT2 + Tn_LT2 + SPE_LT2 + A_LY2 + C_LY2 + D_LY2 + PS_LY2 + Tn_LY2 + A_LY_12 + C_LY_12 + D_LY_12 + PS_LY_12 + Tn_LY_12 + REP_LY_12 + A_BTU2 + M_BTU2 + ST_BTU2 + D_BTU2 + Tn_BTU2) + RLEn_LTTLUn = 2.68 percent spanTLUn + ST = 3.38 percent spanSAPP normal UA = 5 percent spanThe Total Loop Uncertainty (TLUa) with accident environmental conditions for the RPS Low Steam Generator Level trip function is calculated as follows:TLUa = SQRT (A_LT2 + C_LT2 + D_LT2 + Ta_LT2 + SPE_LT2 + Ra_LT2 + A_LY2 + C_LY2 + D_LY2 + PS_LY2 + Tn_LY2 + A_LY_12 + C_LY_12 + D_LY_12 + PS_LY_12 + Tn_LY_12 + REP_LY_12 + A_BTU2 + M_BTU2 + ST_BTU2 + D_BTU2 + Tn_BTU2) + RLEa_LT TLUa = 12.71 percent spanTLUa + ST = 13.41 percent spanSAPP accident UA = 14 percent spanOperability Limit CalculationsRPS Low S/G Level BTU Signal Range = -1 Vdc to -5 Vdc for 0 percent to 100 percentRPS Low S/G Level BTU FTSP = -2.420 Vdc or 35.5 percent spanRPS Low S/G Level BTU ST = -2.392 Vdc to -2.448 Vdc (+/-0.7 percent span)RPS Low S/G Level BTU ST Band Width = 56 mVRPS Low S/G Level BTU OL+ = -2.476 Vdc or 36.90 percent spanRPS Low S/G Level BTU OL- = -2.364 Vdc or 34.10 percent spanRPS Low S/G Level BTU OL Band Width = 112 mV St. Lucie Unit 2 EPU Licensing Report App. E-8Supplement to Licensing Report Section 2.4.1St. Lucie Unit 2L-2011-021Docket No. 50-389Attachment 5TableE-1RPS Low SG Level Instrument Loop Device UncertaintiesLevel Transmitter (LT)I/E Signal Converter(LY)E/I Signal Converter(LY-1)RPS BTU(BTU)Reference accuracy (A)+/-0.25% span+/-0.25% span+/-0.50% span+/-0.08% spanCalibration tolerance (C)+/-0.43% span+/-0.43% span+/-0.87% spanN/AM&TE (M)N/AN/AN/A+/-0.08% spanSetting tolerance (ST)N/AN/AN/A+/-0.70% spanDrift (D)+/-0.32% span+/-0.25% span+/-0.50% span+/-0.05% spanPower supply (PS)N/A+/-0.20% span+/-0.50% spanN/ATemperature effect (Tn)+/-0.70% span+/-0.12% span+/-0.12% span+/-0.23% spanTemperature effect (Ta)+/-4.20%spanN/AN/AN/ARepeatability (REP)N/AN/A+/-0.10% spanN/AStatic pressure effect (SPE)+/-0.45% spanN/AN/AN/ARadiation effect (Ra)+/-1.61% spanN/AN/AN/AReference leg effect (RLEn)+0.81%spanN/AN/AN/AReference leg effect (RLEa)+7.89%spanN/AN/AN/A