MONTHYEARIR 05000348/20164052016-06-21021 June 2016 NRC Security Target Set Inspection Report 05000348/2016405 and 05000364/2016405: Cover Letter ML0811406982008-04-23023 April 2008 IR 05000348-08-301 and 05000364-08-301, on 04/17/2008, Reactor and Senior Reactor Operator Initial Examinations - Joseph M. Farley Nuclear Plant ML0734802412007-12-10010 December 2007 IR 05000348-08-006 & 05000364-08-006, on 02/26-28/2008 & 03/17-21/2008 and 03/31-04/04/2008, Southern Nuclear Operating Co. Inc Notification of Triennial Fire Protection Baseline Inspection IR 05000348/20075012007-10-12012 October 2007 IR 05000348-07-501, 05000364-07-501, on 09/10-14/2007, Joseph M. Farley Nuclear Plant, Baseline Inspection IR 05000348/20052042007-10-0303 October 2007 Letter to Mr. R. Johnson Joseph M. Farley Nuclear Plant, Units 1 and 2 - NRC Material Control and Accounting Program Inspection Report Nos. 5000348/2005204 and 05000364/2005204 IR 05000348/20070032007-07-30030 July 2007 IR 05000348-07-003 and 05000364-07-003, on 04/01/2007 - 06/30/2007, Joseph M. Farley Nuclear Plant, Units 1 & 2, Routine Integrated Report IR 05000348/20074012007-03-30030 March 2007 NRC Security Inspection Report 05000348/2007401 and 05000364/2007401 ML0633300552006-11-28028 November 2006 Notification of Inspection and Request for Information IR 05000348/20060072006-09-27027 September 2006 IR 05000348/2006007 and 05000364/2006007 - Safeguards Information Removed IR 05000348/20060062006-09-22022 September 2006 IR 05000348-06-006, IR 05000364-06-006, on 06/26 - 08/18/2006, Joseph M. Farley Nuclear Plant IR 05000348/20010072001-06-21021 June 2001 IR 05000348/2001007 and 05000364/2001007, Southern Nuclear Operating Company, Inc., Farley Nuclear Plant 2016-06-21
[Table view] Category:Letter
MONTHYEARNL-24-0364, Notification of Deferral of Baffle Former Bolt Inspections from Farley 1R33 to 1R342024-10-31031 October 2024 Notification of Deferral of Baffle Former Bolt Inspections from Farley 1R33 to 1R34 NL-24-0392, Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-0022024-10-28028 October 2024 Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-002 NL-24-0396, Response to Request for Additional Information Related to Relief Request to Defer Charging Pump and Mini-Flow Isolation Valve Inservice Testing2024-10-25025 October 2024 Response to Request for Additional Information Related to Relief Request to Defer Charging Pump and Mini-Flow Isolation Valve Inservice Testing NL-24-0384, Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves2024-10-18018 October 2024 Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves NL-24-0320, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,.2024-09-27027 September 2024 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,. NL-24-0349, Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided2024-09-20020 September 2024 Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided IR 05000348/20244012024-09-10010 September 2024 Security Baseline Inspection Report 05000348-2024401 and 05000364-2024401 NL-24-0341, Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-09-10010 September 2024 Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency ML24247A1102024-09-0505 September 2024 Corporate Notification Letter Aka 210-day Letter NUREG Rev 12 NL-24-0259, License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes2024-09-0404 September 2024 License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes NL-24-0340, Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R322024-09-0404 September 2024 Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R32 ML24242A1332024-08-29029 August 2024 Issuance of Amendment Nos. 250 and 247, Regarding License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, Actions (EPID L-2024-LLA-0098) - Non-Proprietary ML24233A0022024-08-27027 August 2024 Request for Withholding Information from Public Disclosure for Joseph M. Farley Nuclear Plant, Units 1 and 2, License Amendment Request Supplement to Change Technical Specification 3.6.5, Containment Air Temperature Actions ML24240A0812024-08-27027 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Revised Completion Time IR 05000348/20244022024-08-26026 August 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000348/2024402 and 05000364/2024402 IR 05000348/20240052024-08-26026 August 2024 Updated Inspection Plan for Joseph M. Farley Nuclear Plant, Units 1 and 2 - Report 05000348/2024005 and 05000364/2024005 ML24226B2112024-08-22022 August 2024 Regulatory Audit Summary in Support of License Amendment Requests to Revise Technical Specification 3.6.5, Containment Air Temperature, Actions NL-24-0321, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information2024-08-16016 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information IR 05000348/20240022024-08-12012 August 2024 – Integrated Inspection Report 05000348-2024002 and 05000364-2024002 and Exercise of Enforcement Discretion ML24215A3772024-08-0707 August 2024 2024 Farley Requal Inspection Corporate Notification Letter ML24201A2032024-08-0101 August 2024 Request for Withholding Information from Public Disclosure for Joseph M. Farley Nuclear Plant, Units 1 and 2, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions ML24200A1392024-07-25025 July 2024 Regulatory Audit in Support of Review of the License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature ML24199A2072024-07-24024 July 2024 TS 3-6-5 LAR - Individual Notice Transmittal Letter and NSHC - Rev 1 (1) - Letter NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 NL-24-0281, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions2024-07-18018 July 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML24184A0452024-07-0202 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A3762024-07-0101 July 2024 Nonacceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, Using Risk-Informed Process for Evaluations NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0230, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-3602024-06-28028 June 2024 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-360 NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in 05000348/LER-2024-002-01, Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel2024-06-19019 June 2024 Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) 05000348/LER-2024-001, Pressurizer Safety Valve Lift Pressure Outside of Technical Specifications Limits Due to Setpoint Drift2024-06-17017 June 2024 Pressurizer Safety Valve Lift Pressure Outside of Technical Specifications Limits Due to Setpoint Drift NL-24-0238, RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information2024-06-14014 June 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information NL-24-0229, Notice of Intent to Pursue Subsequent License Renewal2024-06-0707 June 2024 Notice of Intent to Pursue Subsequent License Renewal ML24149A0492024-06-0404 June 2024 SNC Fleet - Regulatory Audit in Support of Review of the License Amendment Request to Revise TS 1.1, Use and Application Definitions, and Add New Technical Specification 5.5.21 and 5.5.17, Online Monitoring Program, ML24143A0412024-05-28028 May 2024 Supplemental Information Needed for Using the Risk-Informed Process for Evaluation for the LAR to Change Technical Specification 3.6.5, Containment Air Temperature, Actions NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0188, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 IR 05000348/20240012024-04-24024 April 2024 Integrated Inspection Report 05000348/2024001 and 05000364/2024001 NL-24-0137, RIPE License Amendment Request to Change Containment Air Temperature Actions2024-04-19019 April 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions IR 05000348/20240102024-04-16016 April 2024 NRC Inspection Report 05000348/2024010 and 05000364/2024010 05000364/LER-2024-002, For Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel2024-04-15015 April 2024 For Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel NL-24-0134, Renewed National Pollutant Discharge Elimination System (NPDES) Permit2024-04-12012 April 2024 Renewed National Pollutant Discharge Elimination System (NPDES) Permit IR 05000348/20240112024-04-12012 April 2024 Fire Protection Team Inspection Report 05000348/2024011 and 05000364/2024011 NL-24-0088, Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-04-0505 April 2024 Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency 2024-09-05
[Table view] |
See also: IR 05000348/2008301
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
SAM NUNN ATLANTA FEDERAL CENTER
61 FORSYTH STREET, SW, SUITE 23T85
ATLANTA, GEORGIA 30303-8931
April 23, 2008
Mr. J. Randy Johnson
Vice President - Farley
Southern Nuclear Operating Company, Inc.
7388 North State Highway 95
Columbia, AL 36319
SUBJECT: REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS
JOSEPH M. FARLEY NUCLEAR PLANT 05000348/2008301 AND
05000364/2008301
Dear Mr. Johnson:
In a telephone conversation on April 17, 2008, between Ms. Donna M. Christiansen, Nuclear
Operations Training Supervisor, and Mr. Mark Bates, Senior Operations Engineer,
arrangements were made for the administration of licensing examinations at the Farley Nuclear
Plant. The operating test is scheduled to be administered the weeks of October 27 and
November 3, 2008. The written examination is scheduled to be administered the week of
November 10, 2008. The on-site preparatory week is scheduled for the week of September 29,
2008.
As agreed during the telephone conversation, your staff will prepare both the written
examination and operating test based on the guidelines in Revision 9, Supplement 1, of
NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC
regional office will discuss with your staff any changes that might be necessary before the
examination is administered. Your staff has also agreed to make all copies of examination
materials that are necessary for administering the exam.
To meet the above schedule, it will be necessary for your staff to furnish the outline for the
operating test by July 7, 2008. The written examinations, operating tests, and the supporting
reference materials identified in NUREG 1021, ES-201, Attachment 2, Reference Material
Guidelines For Initial Licensing Examinations, will be due by September 2, 2008. Pursuant to
10 CFR 55.40(b) (3), an authorized representative of the facility licensee shall approve the
outlines, examinations, and tests before they are submitted to the NRC for review and approval.
All materials shall be complete and ready-to-use. We request that any personal, proprietary,
sensitive unclassified, or safeguards information in your response be contained in a separate
enclosure and appropriately marked. Any delay in receiving the required examination and
reference materials, or the submittal of inadequate or incomplete materials, may cause the
examinations to be rescheduled.
SNC 2
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with NUREG
1021, ES-402, Administering Initial Written Examinations, and to make the simulation facility
available on the dates noted above. In accordance with NUREG 1021, ES-302, Administering
Operating Tests To Initial License Applicants, your staff should retain the original simulator
performance data (e.g., system pressures, temperatures, and levels) generated during the
dynamic operating tests until the examination results are final.
Appendix E of NUREG 1021, Policies and Guidelines For Taking NRC Examinations,
contains a number of NRC policies and guidelines that will be in effect while the written
examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget, approval number Part 55 (3150-0018), which expires on June 30,
2009. The public reporting burden for this collection of information is estimated to average 500
hours per response, including the time for writing the examinations, and reviewing instructions,
gathering and maintaining the data needed, and completing and reviewing the collection of
information. Send comments on any aspect of this collection of information, including
suggestions for reducing the burden, to the Information and Records Management Branch (T-6
F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet
electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and
Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington,
DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS
is accessible from the NRC Web site at http://www/nrc.gov/readingrm/adams.html (the Public
Electronic Reading Room).
SNC 3
Thank you for your cooperation in this matter. Ms. Christiansen has been advised of the
policies and guidelines referenced in this letter. If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Mr. Mark Bates at (404) 562-4612,
(Internet E-mail: Mark.Bates@nrc.gov), Mr. Craig Kontz at (404) 562-4715, (Internet E-mail:
Craig.Kontz@nrc.gov) or me at (404) 562-4550, (Internet E-mail: Malcolm.Widmann@nrc.gov).
Sincerely,
/RA/
Malcolm T. Widmann, Chief
Operations Branch
Division of Reactor Safety
Docket Nos.: 50-348, 50-364
License Nos.: NPF-2, NPF-8
cc: See Page 4
SNC 4
cc: B. D. McKinney Moanica Caston
Licensing Services Manager Vice President and General Counsel
B-031 Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Electronic Mail Distribution
Company, Inc.
Electronic Mail Distribution M. Stanford Blanton, Esq.
Balch and Bingham Law Firm
Jeffrey T. Gasser Electronic Mail Distribution
Executive Vice President
Southern Nuclear Operating Dr. D. E. Williamson
Company, Inc. State Health Officer
Electronic Mail Distribution Alabama Dept. of Public Health
Electronic Mail Distribution
William D. Oldfield
Quality Assurance Supervisor Mr. Mark Culver
Southern Nuclear Operating Chairman
Company Houston County Commission
Electronic Mail Distribution P. O. Box 6406
Dothan, AL 36302
L. Mike Stinson
Vice President Senior Resident Inspector
Fleet Operations Support Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Joseph M. Farley Nuclear Plant
Company, Inc. U.S. NRC
Electronic Mail Distribution 7388 N. State Highway 95
Columbia, AL 36319
David H. Jones
Vice President Southern Nuclear Operating Company, Inc
Engineering ATTN: Mr. John G. Horn, Plant Training &
Southern Nuclear Operating Emergency Preparedness Manager
Company, Inc. Farley Nuclear Plant
Electronic Mail Distribution P. O. Box 470
Ashford, AL 36312
_________________________
OFFICE RII:DRS RII:DRS RII:DRS RII:DRP
SIGNATURE /RA/ /RA/ /RA/ /RA/
NAME Craig Kontz * Mark A. Bates* MT.Widmann Scott Shaeffer
DATE 04/18/2008 04/18/2008 04/21/2008 04/21/2008
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES N