Category:TSTF
Jump to navigation
Jump to search
(previous page) (next page)
for Technical Specifications Task Force (TSTF)
This category uses the form TSTF.
Title | I | O | W | |
---|---|---|---|---|
TSTF-448 | Control Room Habitability | 109 | 46 | 4 |
TSTF-425 | Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B | 106 | 35 | 7 |
TSTF-449 | Steam Generator Tube Integrity | 58 | 27 | 1 |
TSTF-493 | Clarify Application of Setpoint Methodology for LSSS Functions | 56 | 21 | 5 |
TSTF-505 | Provide RISK-INFORMED Extended Completion Times - RITSTF Initiative 4B | 49 | 35 | 4 |
TSTF-051 | Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations | 42 | 15 | 2 |
TSTF-510 | Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection | 39 | 5 | 3 |
TSTF-542 | Reactor Pressure Vessel Water Inventory Control | 36 | 10 | 0 |
TSTF-523 | Generic Letter 2008-01, Managing Gas Accumulation | 35 | 13 | 0 |
TSTF-577 | Performance Based Frequencies for Steam Generator Tube Inspections | 31 | 4 | 1 |
TSTF-372 | Addition of LCO 3.0.8, Inoperability of Snubbers | 30 | 5 | 0 |
TSTF-545 | TS Inservice Testing (IST) Program Removal | 26 | 11 | 0 |
TSTF-359 | Increase Flexibility in Mode Restraints | 26 | 13 | 0 |
TSTF-447 | Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors | 24 | 14 | 0 |
TSTF-529, Clarify Use and Application Rules | Clarify Use and Application Rules | 22 | 2 | 0 |
TSTF-490 | Deletion of E BAR Definition and Revision to RCS Specific Activity Tech Spec | 22 | 9 | 2 |
TSTF-360 | DC Electrical Rewrite | 21 | 7 | 6 |
TSTF-501 | Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control | 21 | 7 | 2 |
TSTF-419 | Revise PTLR Definition and References in ISTS 5.6.6, RCS PTLR | 20 | 1 | 1 |
TSTF-439 | Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO | 20 | 6 | 2 |
TSTF-484 | Use of TS 3.10.1 for SCRAM Time Testing Activities | 19 | 3 | 2 |
TSTF-535 | Revise Shutdown Margin Definition to Address Advanced Fuel Designs | 18 | 4 | 0 |
TSTF-427 | Allowance for Non Technical Specification Barrier Degradation on Supported System Operability | 17 | 10 | 1 |
TSTF-563 | Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program | 17 | 5 | 0 |
TSTF-564 | Safety Limit MCPR to COLR | 17 | 4 | 0 |
TSTF-511 | Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 | 17 | 9 | 0 |
TSTF-522 | Revise Ventilation System Surveillance Requirements to Operate for 10 Hours PER Month | 17 | 6 | 0 |
TSTF-582 | RPV WIC Enhancements | 16 | 2 | 0 |
TSTF-479 | Changes to Reflect Revision of 10 CFR 50.55A | 16 | 9 | 0 |
TSTF-52 | Implement 10 CFR 50, Appendix J, Option B | 15 | 3 | 1 |
TSTF-418 | RPS and ESFAS Test Times and Completion Times - WCAP-14333 | 14 | 5 | 0 |
TSTF-363 | Revise Topical Report References in ITS 5.6.5, Colr | 14 | 2 | 0 |
TSTF-500 | DC Electrical Rewrite - Update to TSTF-360 | 13 | 5 | 2 |
TSTF-547 | Clarification of Rod Position Requirements | 13 | 0 | 0 |
TSTF-514 | Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation | 13 | 0 | 0 |
TSTF-513 | Revise Operability Requirements and Actions for RCS Leakage Instrumentation | 13 | 3 | 0 |
TSTF-374 | Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil | 12 | 3 | 2 |
TSTF-421 | Revision to RCP Flywheel Inspection Program - WCAP-15666 | 12 | 2 | 0 |
TSTF-312 | Administratively Control Containment Penetrations | 12 | 4 | 1 |
TSTF-567 | Add Containment Sump TS to Address GSI-191 Issues | 12 | 4 | 2 |
TSTF-258 | Changes to Section 5.0, Administrative Controls | 11 | 14 | 0 |
TSTF-541 | Add Exceptions to Surveillance Requirements When the Safety Function is Being Performed | 11 | 2 | 0 |
TSTF-423 | Technical Specifications End States, NEDC-32988-A | 11 | 5 | 0 |
TSTF-411 | Surveillance Test Interval Extensions for Components of the Reactor Protection System - WCAP-15376-P | 11 | 4 | 0 |
TSTF-369 | Removal of Monthly Operating Report and Occupational Radiation Exposure Report | 11 | 23 | 0 |
TSTF-497 | Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less | 11 | 6 | 0 |
TSTF-569 | Revise Response Time Testing Definition | 10 | 3 | 0 |
TSTF-554 | Revise Reactor Coolant Leakage Requirements | 10 | 0 | 0 |
TSTF-491 | Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications | 10 | 4 | 0 |
TSTF-306 | Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration | 10 | 1 | 0 |
... further results |
Pages in category "TSTF"
The following 162 pages are in this category, out of 562 total.
(previous page) (next page)T
- TSTF-425
- TSTF-426
- TSTF-427
- TSTF-429
- TSTF-430
- TSTF-431
- TSTF-432
- TSTF-433
- TSTF-434
- TSTF-435
- TSTF-436
- TSTF-437
- TSTF-438
- TSTF-439
- TSTF-440
- TSTF-441
- TSTF-442
- TSTF-443
- TSTF-444
- TSTF-445
- TSTF-446
- TSTF-447
- TSTF-448
- TSTF-449
- TSTF-450
- TSTF-451
- TSTF-452
- TSTF-453
- TSTF-454
- TSTF-455
- TSTF-456
- TSTF-457
- TSTF-458
- TSTF-459
- TSTF-460
- TSTF-461
- TSTF-462
- TSTF-463
- TSTF-464
- TSTF-465
- TSTF-467
- TSTF-468
- TSTF-469
- TSTF-470
- TSTF-471
- TSTF-472
- TSTF-473
- TSTF-474
- TSTF-475
- TSTF-476
- TSTF-477
- TSTF-478
- TSTF-479
- TSTF-480
- TSTF-481
- TSTF-482
- TSTF-483
- TSTF-484
- TSTF-485
- TSTF-486
- TSTF-487
- TSTF-488
- TSTF-489
- TSTF-490
- TSTF-491
- TSTF-492
- TSTF-493
- TSTF-494
- TSTF-495
- TSTF-496
- TSTF-497
- TSTF-498
- TSTF-499
- TSTF-500
- TSTF-501
- TSTF-502
- TSTF-504
- TSTF-505
- TSTF-506
- TSTF-507
- TSTF-508
- TSTF-509
- TSTF-510
- TSTF-511
- TSTF-512
- TSTF-513
- TSTF-514
- TSTF-515
- TSTF-516
- TSTF-517
- TSTF-518
- TSTF-519
- TSTF-52
- TSTF-520
- TSTF-521
- TSTF-522
- TSTF-523
- TSTF-524
- TSTF-525
- TSTF-526
- TSTF-527
- TSTF-529, Clarify Use and Application Rules
- TSTF-530
- TSTF-531
- TSTF-532
- TSTF-533
- TSTF-534
- TSTF-535
- TSTF-536
- TSTF-537
- TSTF-538
- TSTF-539
- TSTF-540
- TSTF-541
- TSTF-542
- TSTF-543
- TSTF-545
- TSTF-546
- TSTF-547
- TSTF-548
- TSTF-549
- TSTF-550
- TSTF-551
- TSTF-553
- TSTF-554
- TSTF-555
- TSTF-556
- TSTF-557
- TSTF-558
- TSTF-559
- TSTF-560
- TSTF-561
- TSTF-562
- TSTF-563
- TSTF-564
- TSTF-565
- TSTF-566
- TSTF-567
- TSTF-568
- TSTF-569
- TSTF-570
- TSTF-571
- TSTF-573
- TSTF-576
- TSTF-577
- TSTF-580
- TSTF-582
- TSTF-584
- TSTF-585
- TSTF-588
- TSTF-589
- TSTF-591
- TSTF-592
- TSTF-593
- TSTF-596
- TSTF-597
- TSTF-599
- TSTF-600
- TSTF-601
- TSTF-602
- TSTF-603
- TSTF-604