Semantic search

Jump to navigation Jump to search
 TitleIOW
TSTF-448Control Room Habitability109474
TSTF-425Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B109346
TSTF-493Clarify Application of Setpoint Methodology for LSSS Functions56225
TSTF-505Provide RISK-INFORMED Extended Completion Times - RITSTF Initiative 4B53344
TSTF-051Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations42152
TSTF-542Reactor Pressure Vessel Water Inventory Control36100
TSTF-523Generic Letter 2008-01, Managing Gas Accumulation35130
TSTF-372Addition of LCO 3.0.8, Inoperability of Snubbers3050
TSTF-359Increase Flexibility in Mode Restraints26130
TSTF-545TS Inservice Testing (IST) Program Removal26110
TSTF-360DC Electrical Rewrite2566
TSTF-447Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors25130
TSTF-529, Clarify Use and Application RulesClarify Use and Application Rules2220
TSTF-501Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control2172
TSTF-419Revise PTLR Definition and References in ISTS 5.6.6, RCS PTLR2021
TSTF-439Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO2062
TSTF-484Use of TS 3.10.1 for SCRAM Time Testing Activities1932
TSTF-563Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program1850
TSTF-427Allowance for Non Technical Specification Barrier Degradation on Supported System Operability1891
TSTF-535Revise Shutdown Margin Definition to Address Advanced Fuel Designs1840
TSTF-522Revise Ventilation System Surveillance Requirements to Operate for 10 Hours PER Month1760
TSTF-564Safety Limit MCPR to COLR1740
TSTF-511Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 261790
TSTF-500DC Electrical Rewrite - Update to TSTF-3601642
TSTF-52Implement 10 CFR 50, Appendix J, Option B1631
TSTF-582RPV WIC Enhancements1620
TSTF-479Changes to Reflect Revision of 10 CFR 50.55A1690
TSTF-363Revise Topical Report References in ITS 5.6.5, Colr1420
TSTF-514Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation1300
TSTF-541Add Exceptions to Surveillance Requirements When the Safety Function is Being Performed1220
TSTF-374Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil1132
TSTF-258Changes to Section 5.0, Administrative Controls11140
TSTF-423Technical Specifications End States, NEDC-32988-A1150
TSTF-497Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less1160
TSTF-369Removal of Monthly Operating Report and Occupational Radiation Exposure Report11230
TSTF-554Revise Reactor Coolant Leakage Requirements1010
TSTF-306Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration1010
TSTF-358Missed Surveillance Requirements930
TSTF-283Modify Section 3.8 Mode Restriction Notes941
TSTF-475Control Rod Notch Testing Frequency and SRM Insert Control Rod Action950
TSTF-551Address Transient Secondary Containment Conditions841
TSTF-580Provide Exception from Entering Mode 4 With No Operable RHR Shutdown Cooling800
TSTF-495Bases Change to Address GE Part 21 SC05-03800
TSTF-477Add Action for Two Inoperable Control Room AC Subsystems820
TSTF-163Minimum Vs. Steady State Voltage and Frequency810
TSTF-566Revise Actions for Inoperable RHR Shutdown Cooling Subsystems710
TSTF-478BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control700
TSTF-230Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling710
TSTF-266Eliminate the Remote Shutdown System Table of Instrumentation and Controls710
TSTF-485Correct Example 1.4-1720