Semantic search

Jump to navigation Jump to search
 TitleIOW
TSTF-448Control Room Habitability109474
TSTF-425Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B109346
TSTF-449Steam Generator Tube Integrity60271
TSTF-493Clarify Application of Setpoint Methodology for LSSS Functions56225
TSTF-505Provide RISK-INFORMED Extended Completion Times - RITSTF Initiative 4B53344
TSTF-051Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations42152
TSTF-510Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection3953
TSTF-523Generic Letter 2008-01, Managing Gas Accumulation35130
TSTF-577Performance Based Frequencies for Steam Generator Tube Inspections3351
TSTF-372Addition of LCO 3.0.8, Inoperability of Snubbers3050
TSTF-359Increase Flexibility in Mode Restraints26130
TSTF-545TS Inservice Testing (IST) Program Removal26110
TSTF-447Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors25130
TSTF-360DC Electrical Rewrite2566
TSTF-529, Clarify Use and Application RulesClarify Use and Application Rules2220
TSTF-490Deletion of E BAR Definition and Revision to RCS Specific Activity Tech Spec2282
TSTF-501Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control2172
TSTF-419Revise PTLR Definition and References in ISTS 5.6.6, RCS PTLR2021
TSTF-439Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO2062
TSTF-563Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program1850
TSTF-427Allowance for Non Technical Specification Barrier Degradation on Supported System Operability1891
TSTF-522Revise Ventilation System Surveillance Requirements to Operate for 10 Hours PER Month1760
TSTF-511Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 261790
TSTF-500DC Electrical Rewrite - Update to TSTF-3601642
TSTF-479Changes to Reflect Revision of 10 CFR 50.55A1690
TSTF-363Revise Topical Report References in ITS 5.6.5, Colr1420
TSTF-567Add Containment Sump TS to Address GSI-191 Issues1332
TSTF-513Revise Operability Requirements and Actions for RCS Leakage Instrumentation1330
TSTF-541Add Exceptions to Surveillance Requirements When the Safety Function is Being Performed1220
TSTF-312Administratively Control Containment Penetrations1241
TSTF-369Removal of Monthly Operating Report and Occupational Radiation Exposure Report11230
TSTF-258Changes to Section 5.0, Administrative Controls11140
TSTF-491Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications1140
TSTF-497Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less1160
TSTF-554Revise Reactor Coolant Leakage Requirements1010
TSTF-358Missed Surveillance Requirements930
TSTF-475Control Rod Notch Testing Frequency and SRM Insert Control Rod Action950
TSTF-412Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable901
TSTF-283Modify Section 3.8 Mode Restriction Notes941
TSTF-163Minimum Vs. Steady State Voltage and Frequency810
TSTF-287Ventilation System Envelope Allowed Outage Time731
TSTF-340Allow 7 Day Completion Time for a TURBINE-DRIVEN AFW Pump Inoperable700
TSTF-266Eliminate the Remote Shutdown System Table of Instrumentation and Controls710
TSTF-485Correct Example 1.4-1720
TSTF-284Add Met Vs. Perform to Specification 1.4, Frequency611
TSTF-269Allow Administrative Means of Position Verification for Locked or Sealed Valves610
TSTF-2643.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRS500
TSTF-273SFDP Clarifications500
TSTF-286Define Operations Involving Positive Reactivity Additions531
TSTF-471Eliminate Use of Term Core Alterations in Actions and Notes542