Semantic search

Jump to navigation Jump to search
 TitleIOW
TSTF-448Control Room Habitability107464
TSTF-425Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B102347
TSTF-493Clarify Application of Setpoint Methodology for LSSS Functions61266
TSTF-051Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations46172
TSTF-523Generic Letter 2008-01, Managing Gas Accumulation35160
TSTF-505Provide RISK-INFORMED Extended Completion Times - RITSTF Initiative 4B34354
TSTF-542Reactor Pressure Vessel Water Inventory Control31100
TSTF-372Addition of LCO 3.0.8, Inoperability of Snubbers2980
TSTF-447Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors28240
TSTF-359Increase Flexibility in Mode Restraints27140
TSTF-545TS Inservice Testing (IST) Program Removal25100
TSTF-529, Clarify Use and Application RulesClarify Use and Application Rules2310
TSTF-358Missed Surveillance Requirements22110
TSTF-360DC Electrical Rewrite2087
TSTF-484Use of TS 3.10.1 for SCRAM Time Testing Activities1932
TSTF-439Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO19122
TSTF-501Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control1892
TSTF-419Revise PTLR Definition and References in ISTS 5.6.6, RCS PTLR1821
TSTF-535Revise Shutdown Margin Definition to Address Advanced Fuel Designs1830
TSTF-479Changes to Reflect Revision of 10 CFR 50.55A1890
TSTF-522Revise Ventilation System Surveillance Requirements to Operate for 10 Hours PER Month1760
TSTF-363Revise Topical Report References in ITS 5.6.5, Colr1620
TSTF-427Allowance for Non Technical Specification Barrier Degradation on Supported System Operability1681
TSTF-564Safety Limit MCPR to COLR1640
TSTF-511Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 2616120
TSTF-563Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program1460
TSTF-369Removal of Monthly Operating Report and Occupational Radiation Exposure Report14350
TSTF-582RPV WIC Enhancements1340
TSTF-423Technical Specifications End States, NEDC-32988-A1350
TSTF-514Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation1300
TSTF-52Implement 10 CFR 50, Appendix J, Option B1240
TSTF-500DC Electrical Rewrite - Update to TSTF-3601143
TSTF-495Bases Change to Address GE Part 21 SC05-031100
TSTF-497Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less1160
TSTF-374Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil1031
TSTF-258Changes to Section 5.0, Administrative Controls10140
TSTF-283Modify Section 3.8 Mode Restriction Notes1041
TSTF-306Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration1000
TSTF-287Ventilation System Envelope Allowed Outage Time931
TSTF-475Control Rod Notch Testing Frequency and SRM Insert Control Rod Action950
TSTF-554Revise Reactor Coolant Leakage Requirements820
TSTF-551Address Transient Secondary Containment Conditions741
TSTF-566Revise Actions for Inoperable RHR Shutdown Cooling Subsystems710
TSTF-163Minimum Vs. Steady State Voltage and Frequency710
TSTF-460Control Rod SCRAM Time Testing Frequency750
TSTF-485Correct Example 1.4-1720
TSTF-222Control Rod SCRAM Time Testing700
TSTF-477Add Action for Two Inoperable Control Room AC Subsystems740
TSTF-413Elimination of Requirements for a Post Accident Sampling System - NEDO-3299620
TSTF-269Allow Administrative Means of Position Verification for Locked or Sealed Valves610