Press Release-IV-09-015, NRC to Hold Two Public Meetings About Diablo Canyon Nuclear Plant on May 28

From kanterella
Revision as of 15:27, 26 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Press Release-IV-09-015: NRC to Hold Two Public Meetings About Diablo Canyon Nuclear Plant on May 28
ML091320476
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/12/2009
From:
Office of Public Affairs Region IV
To:
Category:Press Release
References
Press Release-IV-09-015
Download: ML091320476 (2)


Text

NRC NEWS U.S. NUCLEAR REGULATORY COMMISSION Office of Public Affairs Region IV 611 Ryan Plaza Drive - Suite 400 Arlington, TX 76011-4005 No. IV-09-015

Contact: Victor Dricks

Phone: (817) 860-8128 May 12, 2009 E-Mail: be opa4.resource@nrc.gov NRC TO HOLD TWO PUBLIC MEETI NGS ABOUT DIABLO CANYON NUCLEAR PLANT ON MAY 28

The Nuclear Regulatory Commission will hold two public meetings on May 28 to discuss

issues regarding the Diablo Canyon nuclear plant, located near San Luis Obispo, Ca.

The NRC staff will hold an informal open house from 4 - 5:30 p.m. during which they will be available to answer questions from the public on the safety performance at the Diablo Canyon nuclear plant, as well as the NRC's role in ensuring safe plant operation. From 7- 9 p.m.

the staff with hold a "Town Hall" style meeting specifically tailored to maximize public

participation.

Both meetings will be held at the Embassy Suites Hotel, 333 Madonna Road, in San Luis Obispo.

"Each year, the NRC assesses the performance of all of the nation's commercial nuclear power plants," said Region IV Administrator Elmo E. Collins. "The open house gives us an opportunity to meet with local residents for informal discussions. The Town Hall meeting has worked well in the past in fostering discussions between members of the public and the NRC.

We look forward to meeting with members of the community and answering questions they may

have regarding issues related to Diablo Canyon."

A letter sent from the NRC Region IV Office to plant officials addresses the performance of the plant during 2008 and will serve as the basis for the afternoon discussion. It is available on

the NRC web site at:

http://www.nrc.gov/NRR/OVERS IGHT/ASSESS/LETTERS/diab_2008q4.pdf.

The NRC said Diablo Canyon operated safely during 2008 and will receive the detailed inspection regime during 2009 used by the NRC for plants that are operating well.

These inspections are performed by two NRC Resident Inspectors assigned to the plant and by inspection specialists from the Region IV office in Arlington, Texas.

Current performance information for Diablo Canyon Unit 1 is available on the NRC web site at: http://www.nrc.gov/NRR/OVERSIGHT

/ASSESS/DIAB1/diab1_chart.htm

l. Information for Unit 2 is available at:

http://www.nrc.gov/NRR/OVERSIGHT

/ASSESS/DIAB2/diab2_chart.htm

l. The NRC plans to make video broadcasts of the Town Hall meeting available on SLO-Span, the San Luis Obispo County government cable access channel.

NRC news releases are available through a free list serve subscription at the following Web address: http://www.nrc.gov/public-involve/listserver.html. The NRC homepage at www.nrc.gov also offers a SUBSCRIBE link. E-mail notifications are sent to subscribers when news releases are posted to NRC's Web site.