ML091460273

From kanterella
Revision as of 11:14, 26 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NRC Operator Licensing Retake Exam Results, Vermont Yankee Nuclear Power Station, Unit 1 (Cover Letter Publicly Available; Enclosures Withheld from Public)
ML091460273
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 05/26/2009
From: Hansell S L
Operations Branch I
To: Romeo M
Entergy Nuclear Vermont Yankee
Hansell S
Shared Package
ML090930023 List:
References
TAC U1794
Download: ML091460273 (4)


Text

May 26, 2009 Mr. Mike Romeo, Sr. Manager, Training and Development Entergy Nuclear Vermont Yankee, LLC Vermont Yankee Nuclear Power Station 185 Old Ferry Road P. O. Box 7002 Brattleboro, VT 05302-7002

Subject:

NRC Operator Licensing Retake Exam Results Vermont Yankee Nuclear Power Station, Unit 1 (Cover letter publicly available; enclosures withheld from public.)

Dear Mr. Romeo:

The purpose of this letter is to inform you of the individual examination results for your applicant on the retake written examination conducted on May 18, 2009 at your facility. This meets the intent of Section E.1 of ES-501 of NUREG 1021, "Operator Licensing Examination Standards for Power Reactors." This information is considered "proprietary" in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly.

As indicated in Enclosure 1, the completed ES-501-2, "Power Plant Licensing Examination Results Summary," one individual who took the examination passed.

Enclosure 2 contains the individual results ES-303-1, "Individual Examination Report," for the applicant. The applicant has authorized the release of this information to your facility by signing Block 19A of their license applications (i.e., NRC Form 398).

Enclosure 3 is a copy of the license.

Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.

Sincerely, /RA/

Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Mr. Mike Romeo, Sr. Manager, Training and Development Entergy Nuclear Vermont Yankee, LLC Vermont Yankee Nuclear Power Station 185 Old Ferry Road P. O. Box 7002 Brattleboro, VT 05302-7002

Subject:

NRC Operator Licensing Retake Exam Results Vermont Yankee Nuclear Power Station, Unit 1 (Cover letter publicly available; enclosures withheld from public.)

Dear Mr. Romeo:

The purpose of this letter is to inform you of the individual examination results for your applicant on the retake written examination conducted on May 18, 2009 at your facility. This meets the intent of Section E.1 of ES-501 of NUREG 1021, "Operator Licensing Examination Standards for Power Reactors." This information is considered "proprietary" in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly.

As indicated in Enclosure 1, the completed ES-501-2, "Power Plant Licensing Examination Results Summary," one individual who took the examination passed.

Enclosure 2 contains the individual results ES-303-1, "Individual Examination Report," for the applicant. The applicant has authorized the release of this information to your facility by signing Block 19A of their license applications (i.e., NRC Form 398).

is a copy of the license.

Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.

Sincerely, /RA/

Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety SUNSI Review Complete: SLH (Reviewer

=s Initials) ADAMS PKG NO.: ML090930023 DOCUMENT NAME: G:\DRS\Operations Branch\Johnson\Exam FY09-VY Wr Rtk May09 (U01794)\ExamNotificationLtr.doc After declaring this document AAn Official Agency Record,@ it will be released to the Public. OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler//CJB GJohnson/SLH For SLHansell/SLH DATE 05/26/09 05/ 26/09 05/26 /09 OFFICIAL RECORD COPY M. Romeo, Sr. Docket No. 050-271 License No. DPR-28

Enclosures:

1. ES-501-2, Power Plant Licensing Examination Results Summary 2. ES-303-1, Individual Examination Report
3. Licenses cc w/licenses:

Mr. Michael J. Colomb Site Vice President Entergy Nuclear Operations, Inc. Vermont Yankee Nuclear Power Station 185 Old Ferry Road P.O. Box 500 Brattleboro, VT 05302-0500 M. Romeo, Sr. Distribution: w/o enclosures: Master Exam File