ML092440685

From kanterella
Revision as of 12:09, 25 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Browns Ferry Inspection/Activity Plan 09/01/2009 - 12/31/2010
ML092440685
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 09/01/2009
From:
NRC/RGN-II
To:
References
Download: ML092440685 (2)


Text

Inspection / Activity PlanPage 1 of 209/01/200907:46:01Report 2209/01/2009

-12/31/2010UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteBrowns FerryTFPI-TRIENNIAL FIRE PROTECTION INSPECTION 61, 2, 3 IPFire Protection [Triennial]7111105T09/21/200909/25/20091, 2, 3 IPFire Protection [Triennial]7111105T10/05/200910/09/2009ISFSI-ISFSI OPERATIONAL INSPECTION 21, 2, 3 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.109/01/200912/31/2009CDBI-EB1-COMPONENT DESIGN BASES INSPECTION 81, 2, 3 IPComponent Design Bases Inspection711112109/28/200910/02/20091 IPPower Uprate7100409/28/200911/20/20091, 2, 3 IPComponent Design Bases Inspection711112110/19/200910/23/20091, 2, 3 IPComponent Design Bases Inspection711112111/02/200911/06/20091, 2, 3 IPComponent Design Bases Inspection711112111/16/200911/20/2009PSB1EP-EMERGENCY PREPAREDNESS EXERCISE 31, 2, 3 IPEmergency Response Organization, Drill/Exercise Performance Indicator, Program Review2515/17511/02/200911/06/20091, 2, 3 IPExercise Evaluation711140111/02/200911/06/20091, 2, 3 IPEmergency Action Level and Emergency Plan Changes711140411/02/200911/06/20091, 2, 3 IPPerformance Indicator Verification7115111/02/200911/06/2009EB3ISI-UNIT 3 INSERVICE INSPECTION 13 IPInservice Inspection Activities - BWR7111108G03/08/201003/12/2010PSB1-RP-RP ACCESS CONTROLS 11, 2, 3 IPAccess Control to Radiologically Significant Areas711210103/22/201003/26/20101, 2, 3 IPPerformance Indicator Verification7115103/22/201003/26/2010PSB1EP-EMERGENCY PREPAREDNESS INSPECTION 11, 2, 3 IPAlert and Notification System Testing711140203/22/201003/26/20101, 2, 3 IPEmergency Response Organization Augmentation Testing711140303/22/201003/26/20101, 2, 3 IPEmergency Action Level and Emergency Plan Changes711140403/22/201003/26/20101, 2, 3 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140503/22/201003/26/20101, 2, 3 IPPerformance Indicator Verification7115103/22/201003/26/2010OL EXAM-INITIAL EXAM PREP 71 BROWNS FERRY/JULY 2009 EXAM AT POWER FACILITIESV2330405/17/201005/21/2010PSB1-RP-RP GROUNDWATER PROTECTION 11, 2, 3 IPReview of the Implementation of the Industry Ground Water Protection Voluntary Initiative2515/17305/31/201006/04/2010OL EXAM-INITIAL EXAM - WEEK 1 71 BROWNS FERRY/JULY 2009 EXAM AT POWER FACILITIESV2330406/07/201006/11/2010OL EXAM-INITIAL EXAM - WEEK 2 71 BROWNS FERRY/JULY 2009 EXAM AT POWER FACILITIESV2330406/14/201006/18/2010This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Inspection / Activity PlanPage 2 of 209/01/200907:46:01Report 2209/01/2009

-12/31/2010UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteBrowns FerryPSB1-RP-RP PUBLIC RADIATION PROTECTION 31, 2, 3 IPRadiation Monitoring Instrumentation and Protective Equipment711210306/14/201006/18/20101, 2, 3 IPRadioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems711220106/14/201006/18/20101, 2, 3 IPRadiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program711220306/14/201006/18/20101, 2, 3 IPPerformance Indicator Verification7115106/14/201006/18/2010PI&R-PROBLEM IDENTIFICATION AND RESOLUTION IN 51, 2, 3 IPIdentification and Resolution of Problems71152B08/30/201009/03/20101, 2, 3 IPIdentification and Resolution of Problems71152B09/20/201009/24/2010EB3ISI-UNIT 1 INSERVICE INSPECTION 11 IPInservice Inspection Activities - BWR7111108G11/01/201011/05/2010OL RQ-REQUAL INSPECTION 21, 2 IPLicensed Operator Requalification Program7111111B12/06/201012/10/2010This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.