05000335/FIN-2010009-01
From kanterella
Revision as of 08:58, 25 September 2017 by StriderTol (talk | contribs) (Created page by program invented by Mark Hawes)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Finding | |
---|---|
Title | |
Description | The inspectors identified a non-cited violation of 10 CFR 50.65 (a)(2) for failure to demonstrate that the performance of the 2B Emergency Diesel Generator (EDG) and 1C Auxiliary Feedwater Pump (AFW) systems was effectively controlled by preventative maintenance (PM) such that these systems remained capable of performing their intended functions. The 2B EDG and the 1C AFW pump exceeded Maintenance Rule (a)(2) performance criteria since February 27 and May 30, 2010, respectively, and the goal setting and monitoring plans were not established as required by paragraph (a)(1) of the Maintenance Rule. This issue was entered into the licensees corrective action program as AR 581307. The finding was determined to be of greater than minor significance because it was associated with the Equipment Performance attribute of the Mitigating Systems Cornerstone, and adversely affected the cornerstone objective of ensuring availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. More specifically, the licensee failed to demonstrate that the performance of the 2B EDG and the 1C AFW pump was effectively controlled through appropriate PM. According to NRC Inspection Manual Chapter 0609, Attachment 4, Phase I, Initial Screening and Characterization of Findings, this finding was determined to be of very low safety significance because it did not lead to an actual loss of a safety system function or screen as potentially risk significant due to a seismic, flooding, or severe weather initiating event. The cause of this finding was directly related to the cross-cutting aspect of Human Performance H.4(b) for the failure to follow the maintenance rule procedural requirements which resulted in the goal setting and monitoring plan not being established in a timely manner per 10 CFR part 50.65. |
Site: | Saint Lucie |
---|---|
Report | IR 05000335/2010009 Section 4OA4 |
Date counted | Sep 30, 2010 (2010Q3) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 95002 |
Inspectors (proximate) | T Morrissey J Nadel S Ninh D Rich A Alen C River M Kamishan |
Violation of: | 10 CFR 50.65 10 CFR 50.65(a)(2) |
CCA | H.8, Procedure Adherence |
INPO aspect | WP.4 |
' | |
Finding - Saint Lucie - IR 05000335/2010009 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Saint Lucie) @ 2010Q3
Self-Identified List (Saint Lucie)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||