Kewaunee Nuclear Power Plant Calculation C10818, Revision 0 Kewaunee Unit 1 Pressurizer Pressure Protection Channel Statistical Allowance (Csa) Calculation.
ML102730399
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 10/14/2009
From: Baugus A W
Dominion Energy Kewaunee
To:
Office of Nuclear Reactor Regulation
References
TAC ME2139 C10818, Rev 0
Download: ML102730399 (28)


Text

Dominion'" Calculation Cover Sheet Page 1 of 23()Station: KPS Unit(s): 1 System Code(s): 36 (Reactor Coolant System)Calculation Number: C10818 Revision: 0 Addendum: N/A Calculation Quality Class:Safety Related D Non-Safety Related I Status: Current Installation Verification Required:Yes DNo Discipline:

I&C Keyword(s):

Reactor Coolant System, Pressurizer Pressure, Safety Injection Supersedes:

C10818-1, Rev.2, C10818-2, Rev.1, C10818-3, Rev.1, C10818-4, Rev.1 Subject (Calculation Title): Kewaunee Unit 1 Pressurizer Pressure Protection Channel Statistical Allowance (CSA)Calculation.

Initiating Document: Kewaunee Improved Technical Specifications (ITS)CM-AA-CLC-301, Revision: 1 (1)I CM-AA-CLC-301-1 001, Revision: 1 (1).C'.I':YR F._'ni'III i<g:<.**i/*

...<*.*<*i;...*<;.**...*.*****.*...**..*

    • .**.***<:<./i*.*i.i

..*;iii.**.*...y"L Station: Unit: System: Equipment Location (Mark Number): Tag Number (If Applicable):

KPS 1 36 21081 PT-429 KPS 1 36 21080 PT-430 KPS 1 36 21079 PT-431 KPS 1 36 21082 PT-449 Objective:

The objective of this calculation is to determine the Channel Statistical Allowance (CSA)value(s)associated with Kewaunee's Unit 1 Pressurizer Low and High Pressure Reactor Trip, Low Pressure Safety Injection and the High Pressure Safety Injection Unblock functions.

This calculation supports Kewaunee's conversion to Improved Technical Specifications (ITS).Conclusion:

The Channel Statistical Allowance (CSA)values associated with the Pressurizer Pressure Trips are: CSA-NORMAL(HI Press RX Trip Normal)=+/-2.833%of span=+/-22.66 psig CSA-NORMAL(Sllnltiatlon

&Unblock Normal)=+/-2.833%of span=+/-22.66 psig CSA-NORMAL(LO Press RXTrip Normal)=+/-2.940%of span=+/-23.52 psig CSA-DBE(Sllnitialion DBE)=-8.479 to+8.827%of span=-67.83 to 70.62 psig Originator (Print):

d-Date: 1/;Andrew W.Baugus Jr.101ft!2 00 tt Reviewer (Print): SignatrJ)ill....JA.A Date: J.D.Desrochers LA/rJ IN/()Owners Review (Print):!Vl I-/, r Date: I Victor Myers'J Or It tI....v$i\Pv'*co h ID-II/-09 Approval (Print):

Date:/(B.Morrison A tollS or 1 This istherevision of CM-AA-CLC-301 and CM-AA-CLC-301-1001 in ettlct at the time the calculation was initiated.

Engineering Work Sheet Calculation Number:

C10818 Revision:

0 Addendum:

N/A Page 2 of 23 Affected Components (Cont.):

Station: KPS KPS KPS KPS KPS KPS KPS KPS KPS KPS KPS KPS KPS KPS KPS KPS KPS KPS Unit: 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 System: 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 Equipment Location (Mark Number):

4840001 4840101 4840201 4840301 4840002 4840102 4840202 4840003 4840103 4840205 4840005 4840105 4840203 4840302 4840004 4840104 4840204 4840303 Tag Number (If Applicable): PQ-429 PQ-430 PQ-431 PQ-449 PC-429A PC-430A PC-431A PC-429C/D PC-430E/F PC-431I/G PC-429E PC-430H PC-431J PC-449A PM-429B PM-430C PM-431C PM-449B TABLE OF CONTENTS SECTION DESCRIPTION PAGE Calculation Cover Sheet 1 Table of Contents 2 Attachments 2 Record of Revision 3 1.0 Purpose 4 2.0 Method of Analysis 4 3.0 Design Inputs 5 4.0 Assumptions 5 5.0 References 6 6.0 Computer Codes 8 7.0 Functional Block Diagram 9 8.0 Calculation 11 9.0 Conclusion 23 ATTACHMENTS Attachment 1 Pressurizer Pressure Transmitter Head Correction 50.59 Applicability Review Attachment 3 50.59 Pre-Screening

Engineering Work Sheet Calculation Number:

C10818 Revision:

0 Addendum:

N/A Page 3 of 23 RECORD OF REVISION

Rev. 0 Original Issue. This calculation replaces Calculations C10818-1, Rev. 2, C10818-2, Rev. 1, C10818-3, Rev. 1, and C10818-4, Rev. 1. This calculation is written as a Channel Statistical Allowance (CSA) Calculation versus a Setpoint Calculation.

Engineering Work Sheet Calculation Number:

C10818 Revision:

0 Addendum:

N/A Page 4 of 23

1.0 PURPOSE

The purpose of this calculation is to determine the Channel Statistical Allowance (CSA) values associated with the Reactor Protection and Safety Injection Functions of the Pressurizer Pressure Protection Loops. The Pressurizer Pressure Head correction is also included for reference purposes only. The applicable instrumentation loops are P-429, P-430, P-431, and P-449. The loops are similar; therefore the CSA values presented in this calculation will be applicable for all of the loops.

2.0 METHOD OF ANALYSIS This calculation uses the methodology presented in STD-EEN-0304, Revision 6, Calculating Instrumentation Uncertainties by the Square Root of the Sum of the Squares Method (Reference 5.1).

The CSA determined in this calculation is a derivation of the following generic equation presented in STD-EEN-0304, Revision 6, Section 6.1:

CSA = SE +/- [EA² + PMA² + PEA² + (SCA + SMTE)² + SD² + SPE² + STE² + SPSE 2 + (M1 + M1MTE)² + (M2 + M2MTE)² + ...+ (Mn + MnMTE)² + RD² + RTE² + RRA²] (Equation 1)

The terms M1 through Mn refer to individual rack modules within the Pressurizer Pressure Protection Loops. The term MnMTE refers to the Module Measuring and Test Equipment where n is the module number as shown on the Functional Block Diagram in Section 7.0. Finally, the EA term will be removed from the equation for normal conditions since there is no environmental allowance for non-harsh conditions. These changes result in the following equation.

For normal conditions:

CSA = SE +/- [PMA² + PEA² + (SCA + SMTE)² + SD² + SPE² + STE² + SPSE 2 + (M1 + M1MTE)² + (M2 + M2MTE)² + ...+ (Mn + MnMTE)² + RD² + RTE² + RRA²] (Equation 2)

For harsh (DBE) conditions:

CSA = SE +/- [EA 2 + PMA² + PEA² + (SCA + SMTE)² + SD² + SPE² + STE² + SPSE 2 + (M1 + M1MTE)² + (M2 + M2MTE)² + ...+ (Mn + MnMTE)² + RD² + RTE² + RRA²] (Equation 3)

The error terms in the equations above are consistent with standard industry definitions and are described in Section 8.0 and in detail in Reference 5.1.

Engineering Work Sheet Calculation Number:

C10818 Revision:

0 Addendum:

N/A Page 5 of 23 3.0 DESIGN INPUTS

The design inputs are manufacturer's published data sheets, active (current) calculations, station controlled drawings and other controlled documents as listed in Section 5.0, References.

4.0 ASSUMPTIONS

4.1 The Environmental Allowance (EA) term is assumed to be zero for normal (non-accident) conditions. For abnormal operating conditions the EA term includes the effects on the field cables due to degradation of cable insulation (IR), the effects on the transmitter due to increased radiation (RE), and the effects on the transmitter due to elevated steam pressure and temperature (SPTE). 4.2 Based on Reference 5.16, all test data is referenced to the rack 10 Test Point Resistor (TPR), therefore the errors associated with the installed DB Box resistors used to convert the loop current to an applied input voltage to the Foxboro or NUS module under test is included in the overall error of the Foxboro or NUS module as referenced to the rack TPR. 4.3 According to References 5.15 and 5.16, a Fluke 45 Digital Multimeter (DMM) is used to perform the transmitter and rack module calibration. According to Reference 5.14, the DC Voltage accuracies for the ranges of interest are as follows:

Range Desired Acceptance Range 300 mV 300 mV 299.92 to 300.08 mV 3 V 3 V 2.9992 to 3.0008 V 30 V 30 V 29.992 to 30.008 V Range Desired Acceptance Range 1000 mV 900 mV 899.76 to 900.24 10 V 9 V 8.9976 to 9.0024 At Kewaunee, there are six possible voltage spans that could be present in the Reactor Protection System; i.e., 40 to 200 mVDC, 100 to 500 mVDC, 1 to 5 VDC, 0.4 to 12.4 VDC, 2 to 10 VDC, and 0 to 10 VDC. The DC voltage accuracies converted to % of span are given below.

100 to 500 mVDC (1000 mV range) accuracy = (0.24 mVDC / 400 mVDC)

  • 100% = 0.06% of span

0.4 to 12.4 VDC (30 V range) accuracy = (0.008 VDC / 12 VDC)

  • 100% = 0.07% of span 2 to 10 VDC (30 V range) accuracy = (0.008 VDC / 8 VDC)
  • 100% = 0.10% of span Engineering Work Sheet Calculation Number:

C10818 Revision:

0 Addendum:

N/A Page 6 of 23 0 to 10 VDC (30 V range) accuracy = (0.008 VDC / 10 VDC)

  • 100% = 0.08% of span 40 to 200 mVDC (300 mVDC range) accuracy = (0.08 mVDC / 160 mVDC)
  • 100% = 0.05% of span 1 to 5 VDC (10 V range) accuracy = (0.0024 VDC / 4 VDC)
  • 100% = 0.06% of span This calculation will be bounded using an accuracy of + 0.1% of span for the Fluke 45 DMM for all possible conditions for ranges 30 VDC or less. It is acceptable for the calibration procedures to use a DMM with accuracy specifications equal to or better

than the Fluke 45 DMM.

4.4 The loops will be calibrated with a 0-3000 psig Heise Pressure Module or equivalent with an accuracy of + 0.05% of span or better.

5.0 REFERENCES

5.1 Virginia Power Standard, STD-EEN-0304, Revision 6, "Calculating Instrumentation Uncertainties by the Square Root of the Sum of the Squares Method".

5.2 Kewaunee Updated Safety Analysis Report (USAR), Chapters 7 and 14.

5.3 Kewaunee Technical Specifications, section 2.3.a.2, Table TS 3.5-1 and Table TS 3.5-3.

5.4 Kewaunee Vendor Technical Manual KW-VTM-000-FOXBO-0031 (100-1762-1), Revision 15, Nuclear Energy Systems - In strumentation Reference Manual.

5.5 Kewaunee Vendor Technical Manual KW-VTM-000-FOXBO-0015 (100-1744-1), Revision 10, Instrumentation Documentation.

5.6 Kewaunee Vendor Technical Manual KW-VTM-000-NUSIN-0017 (240730), Revision 2, NUS Instruments Series SPS500 Power Supply.

5.7 Kewaunee Vendor Technical Manual KW-VTM-000-NUSIN-0022 (C-N-430-9), Revision 4, SAM504-3 Single & DAM504-3 Dual Alarm Module IOM.

5.8 Kewaunee Vendor Technical Manual KW-VTM-000-ROSEM-0007 (2566-1), Rosemount Instruction Manual, Rosemount 1154, Series H, Alphaline Pressure Transmitters, Product Manual 00809-0100-4631, Rev. BA, April 2007.

Engineering Work Sheet Calculation Number:

C10818 Revision:

0 Addendum:

N/A Page 7 of 23 5.9 Kewaunee Vendor Technical Manual KW-VTM-000-AMETE-0008 (XK-100-1554, XK-341-1), Revision 0, Comparator and Deadweight Pressure Determination System- Mansfield &

Green Type "T".

5.10 Kewaunee Instrument and Control Procedure ICP-82B-137, Revision 6, ICE - "Precision Test Resistor Calibration".

5.11 Kewaunee General Instrument Procedure GIP-007, Revision E, "Protection Loop mV Data Collection".

5.12 Kewaunee Instrument and Control Procedure ICP-82B-168, Revision 3, ICE - Heise PTE-1 Calibrator and HQS-2 Pressure Module Calibration.

5.13 Kewaunee Instrument and Control Procedure ICP-82B-06, Revision T, ICE - Pressure Gauge Calibration.

5.14 Kewaunee Instrument and Control Procedure ICP-82B-129, Revision 10, ICE - Fluke 45 Dual Display Multimeters Calibration.

5.15 Instrument Surveillance Procedure MA-KW-ISP-RC-020A, Rev. 0, "Pressurizer Pressure Transmitters Calibration".

5.16 Instrument Surveillance Procedure SP-47-011A, Rev. 20, "Reactor Coolant Temperature and Pressurizer Pressure Instrument Channel 1 (Red) Calibration".

5.17 Interconnecting Wiring Diagrams:

  • XK-100-620, Rev. 2Q
  • XK-100-656, Rev. 2S 5.18 Station Drawings:
  • E-2038, Rev. AD
  • E-2535, Rev. L
  • XK-100-546, Rev. 2V
  • XK-100-10, Rev. BS
  • XK-100-148, Rev. 3D
  • M-769, Rev. AN 5.19 Kewaunee Power Station Environmental Qualification Plan, Rev.
27.

5.20 Kewaunee Calculation C10818-6, Rev. 0, "Pressurizer Pressure Control Room Indication".

5.21 Kewaunee DCR 2846, "Replace Pressurizer Pressure Transmitters 21079, 21080, 21081 and 21082".

5.22 Kewaunee Calculation CN-LIS-01-151, Rev. 0, Kewaunee (WPS) SBLOCA Analysis for W 422 V+ Fuel RTSR and 7.4% Uprate.

Engineering Work Sheet Calculation Number:

C10818 Revision:

0 Addendum:

N/A Page 8 of 23 5.23 Kewaunee Calculation C10746, Revision 0, Addendum A, "Instrument Loop Calibration Resistor Check".

6.0 COMPUTER CODES No computer codes were used to perform this calculation. All calculations were performed by hand using the method described in Section 2.0.

Engineering Work Sheet Calculation Number:

C10818 Revision:

0 Addendum:

N/A Page 9 of 23 7.0 Functional Block Diagram

PM-429BFOXBORO ORNUSLEAD/LAG M3PC-429EFOXBORO ORNUSBISTABLE M2PQ-429FOXBORO OR NUSPOWER SUPPLY M1PC-429AFOXBORO OR NUSBISTABLE M2PC-429C/DFOXBORO OR NUSBISTABLE M4LowPressureReactor TripHigh PressureReactor TripLowPressureSafetyInjectionUnblockSafetyInjectionPT-429ROSEMOUNTTRANSMITTER1154SH91700 -2500 psig

This drawing is representative of Channels 1, 2, 3, and 4, with the exception of the High Pressure Reactor Trip, the Low Pressure Safety Injection and the High Pressure Unblock Safety Injection which are not in Channel 4.

Engineering Work Sheet Calculation Number:

C10818 Revision:

0 Addendum:

N/A Page 10 of 23 The channels listed below (Table 1) develop the Pressurizer Pressure Low Pressure, High Pressure Reactor Trip functions and the Low Pressure Safety Injection and the High Pressure Unblock Safety Injection functions. This calculation is applicable for all four Pressurizer Pressure Channels.

TABLE 1 Channel Tag/ Mark No. Tag/ Mark No. Tag/ Mark No. Tag/ Mark No. Tag/ Mark No. Tag/ Mark No. Channel 1 (Red) PT-429 (21081) PQ-429 (4840001)

PM-429B (4840004) PC-429E (4840005) PC-429A (4840002)

PC-429C/D (4840003) Channel 2 (White) PT-430 (21080) PQ-430 (4840101) PM-430C (4840104)

PC-430H (4840105) PC-430A (4840102) PC-430E/F (4840103) Channel 3 (Blue) PT-431 (21079) PQ-431 (4840201) PM-431C (4840204)

PC-431J (4840203) PC-431A (4840202)

PC-431I/G (4840205) Channel 4 (Yellow) PT-449 (21082) PQ-449 (4840301)

PM-449B (4840303) PC-449A (4840302)

Engineering Work Sheet Calculation Number:

C10818 Revision:

0 Addendum:

N/A Page 11 of 23 8.0 CALCULATION SE = Systematic Error No Systematic Error has been identified for these loops.

SE = 0.000% of span PMA = Process Measurement Accuracy PMA is not applicable for this loop configuration.

PMA = +/- 0.000% of span

PEA = Primary Element Accuracy PEA is not applicable for this loop configuration.

PEA = +/- 0.000% of span SCA = Sensor Calibration Accuracy

Reference 5.15 provides a transmitter calibration accuracy of + 0.25% of span.

SCA = + 0.250% of span (Reference 5.15)

SMTE = Sensor Measuring and Test Equipment The following Measuring and Test Equipment or its equivalent is used for calibration of the

Transmitters:

1) SMTE 1 = DMM, Fluke Model 45 or equivalent SMTE 1 = +/- 0.100% of span (Assumption 4.3)
2) SMTE 2 = 10 Precision Test Resistor with an accuracy of

+/- 0.01% of span SMTE 2 = +/- 0.010% of span (Reference 5.10)

3) SMTE 3 = Dead Weight Tester, 1700-2500 psig range with an accuracy of

+/- 0.03% of span and a thermal expansion of the pistons effective area of about 0.003% per °C from the calibration temperature (Reference 5.9). (References 5.9) or Heise Pressure Gauge (or equivalent), 0 to 3000 psig with an accuracy of +

0.100% of span or better (Temperature Compensated). (Reference 5.13)

Engineering Work Sheet Calculation Number:

C10818 Revision:

0 Addendum:

N/A Page 12 of 23 SMTE Dead Weight tester = (0.03% + 0.078%) = 0.108%

SMTE Dead Weight tester

= {[(0.108% /100)

  • 2500] / 800}
  • 100%

SMTE Dead Weight tester

= + 0.338% of span

SMTE Pressure Gauge = {[(0.10% / 100%)

  • 3000 psig] / 800 psig}
  • 100%

SMTE Pressure Gauge

= +/- 0.375% of span SMTE 3 = +/- 0.375% of span The Transmitter Measuring and Test Equipment (SMTE) accuracy is equal to:

SMTE = [(SMTE 1 + SMTE 2)2 + SMTE 3 2] 1/2 SMTE = [(0.1 + 0.01) 2 + (0.375) 2] 1/2 SMTE = +/- 0.391% of span SD = Sensor Drift The sensors are Rosemount Model 1154 Series H pressure transmitters. The calibration span of the instrument is 800 psig (Ref. 5.15). Based on Reference 5.8, the Rosemount Model 1154 transmitter has a drift value of +/- 0.2% of the upper range limit (URL) for a 30-month period following calibration. For a calibration cycle up to 30 months the drift value is:

SD = +/- 0.2% of the URL per 30 Months, URL = 3000 psig SD = +/- {[(0.2% / 100%)

  • 3000 psig] / 800 psig}
  • 100 SD = +/- 0.750% of span SPE = Sensor Pressure Effect SPE is not applicable for this instrument configuration.

SPE = +/- 0.000% of span

STE = Sensor Temperature Effect Rosemount Instruction Manual (Ref. 5.8) states the temperature effect for Range Code 9 is:

+/- (0.25% of URL + 0.5% span) / 50

°F, between 40

°F and 130°F (Reference 5.8)

Upper Range Limit = 3000 psig Transmitter Span = 800 psig

Engineering Work Sheet Calculation Number:

C10818 Revision:

0 Addendum:

N/A Page 13 of 23 Temperature Span = 80°F (Based on the EZD Zone L02 (Ref. 5.19) minimum temperature of 40°F and Maximum temperature of 120

°F) STE = [0.25% * (3000 psig / 800 psig) + 0.5%] * (80°F / 50°F)

STE = +/- 2.300% of span

SPSE = Sensor Power Supply Effect According to Reference 5.21, Rosemount Model 1154SH9 differential pressure transmitters are used for the Pressurizer Pressure Channels. According to Reference 5.8, the Sensor Power Supply Effect for this model is less than 0.005% of output span per volt. The nominal load resistance for the Pressurizer Pressure Channels is approximately 1500 (Reference 5.16). Based on Figure 6-2 in Reference 5.8, the nominal power supply voltage at 1575 at 20 mA is 45 VDC. From Figure 6-2, the high end qualified power supply voltage is 45 VDC and the low

end voltage is 13.5 VDC.

Based on References 5.15 and 5.16, the power supply output voltage is not checked during the performance of the Channel Calibration Procedure or the Pressurizer Pressure Transmitter Calibration Procedure, therefore to bound all possible conditions, a power supply output tolerance of + 31.5 VDC (i.e. 45 VDC - 13.5 VDC) will be used to determine the Sensor Power Supply Effect.

SPSE = +/- [(0.005% / 100%) * (31.5 VDC / 1.0 VDC)]

  • 100% = 0.158%

SPSE = + 0.158% of span M1 = Foxboro / NUS Loop Power Supply Model 610AC-0/SPS500 According to References 5.15 and 5.18, the loop power supply is either a Foxboro H/610AC-0 or a NUS Instruments SPS500. Based on References 5.15 and 5.16, these power supplies are not used as current to voltage converters. Therefore, the accuracy for M1 is + 0.0 % of span.

M1 = + 0.000% of span

M1MTE = Loop Power Supply Measuring and Test Equipment According to References 5.15 and 5.18, the loop power supply is either a Foxboro H/610AC-0 or a NUS Instruments SPS500. Based on References 5.15 and 5.16, these power supplies are not used as current to voltage converters. Therefore, the accuracy for M1MTE is + 0.0 % of span.

M1MTE = 0.000% of span

Engineering Work Sheet Calculation Number:

C10818 Revision:

0 Addendum:

N/A Page 14 of 23 M2 = Foxboro/NUS Bistable Modul e Model 63U-AC-OHBA/SAM504-3 The Pressurizer Pressure Loops use three Foxboro or NUS Bistable Modules. Two of the three are single output modules and one is a dual output module. Module M2 will cover the two major functions performed by the single output modules, they are:

1. Pressurizer High Pressure Reactor Trip
2. Pressurizer Low Pressure Reactor Trip Based on Reference 5.16 the calibration accuracy for a Foxboro or NUS Bistable Module Model 63U-AC-OHBA/SAM504-3 Signal Comparator Module is

+/- 0.5% of span. Therefore, M2 is equal to:

M2 = 0.500% of span (Reference 5.16)

M2MTE = Foxboro/NUS Bistable Module Model 63U-AC-OHBA/SAM504-3 Measuring and Test Equipment

Based on reference 5.16, the following M&TE is used to calibrate the Bistable.

M2MTE = +/- (Fluke + TPR)

Fluke Accuracy = + 0.10% of span (Assumption 4.3)

Test Point Resistor Accuracy = + 0.10% of span (Reference 5.23)

M2MTE = +/- (0.10 + 0.10) =

+/- 0.20% of span M2MTE = +/- 0.200% of span

M3 = Foxboro Lead/Lag Amplifier Module Model 66RC-OLA The Pressurizer Low Pressure RX Trip uses one Lead/Lag Amplifier Module. Based on Reference 5.16, the static calibration accuracy is +

0.5% of span.

M3 = 0.500% of span M3MTE = Foxboro Lead/Lag Amplifier Module Model 66RC-OLA Measuring and Test Equipment Based on Reference 5.16, the calibration procedure uses the following M&TE for static calibration.

M3MTE = +/- [(Fluke 1 + TPR 1)² + (Fluke 2 + TPR 2)²] 1/2 Module Input Measurement = Fluke 1 + TPR 1 Module Output Measurement = Fluke 2 + TPR 2 Engineering Work Sheet Calculation Number:

C10818 Revision:

0 Addendum:

N/A Page 15 of 23 Fluke Accuracy = 0.10% span (Assumption 4.3)

Test Point Resistor Accuracy = + 0.10% of span (Reference 5.23)

M3TE = +/- [(0.10 + 0.10)² + (0.10 + 0.10)²]

1/2 = +/- 0.283% of span M3TE = +/- 0.283% of span

M4 = Foxboro/NUS Bistable Module Model 63U-BC-OHEA/DAM504-3 The Pressurizer Pressure Loops use three Foxboro/NUS Bistable Modules. Two of the three are single output modules and one is a dual output module. Module M4 will cover the major functions performed by the dual output module, they are:

1. Pressurizer Low Pressure Safety Injection
2. Pressurizer High Pressure Unblock Safety Injection Based on Reference 5.16, the calibration accuracy for a Foxboro/NUS Bistable Module Model 63U-AC-OHBA/DAM504-3 Signal Comparator Module is

+/- 0.5% of span. Therefore, M4 is equal to:

M4 = + 0.500% of span (Reference 5.16)

M4MTE = Foxboro/NUS Bistable Module Model 63U-BC-OHEA/DAM504-3 Measuring and Test Equipment

Based on reference 5.16, the following M&TE is used to calibrate the Bistable.

M4MTE = +/- (Fluke + TPR)

Fluke Accuracy = + 0.10% of span (Assumption 4.3)

Test Point Resistor Accuracy = + 0.10% of span (Reference 5.23)

M4MTE = +/- (0.10 + 0.10) =

+/- 0.20% of span M4MTE = +/- 0.200% of span

RD = Rack Drift The superseded calculations specified a drift value derived from previous testing. However, that data is not current and Kewaunee is replacing Foxboro rack modules with NUS Instruments equivalents where sufficient drift trends have not been established. Therefore, the standard and conservative value of + 1.0% of span as referenced in STD-EEN-0304, Revision 6 will be used in this calculation.

RD = + 1.000% of span (Reference 5.1)

Engineering Work Sheet Calculation Number:

C10818 Revision:

0 Addendum:

N/A Page 16 of 23 RTE = Rack Temperature Effect For Kewaunee calculations the Rack Temperature Effect term was either assumed to be embedded in the Rack Drift term or set to zero percent of span. However, the effects of rack temperature changes have not been monitored or documented. Therefore, the standard and conservative value of + 0.5% of span as referenced in STD-EEN-0304, Revision 6 will be used for this calculation.

RTE = + 0.500% of span (Reference 5.1)

RRA = Rack Readability Allowance Rack Readability Allowance (RRA) is applicable for the indication portion of the loops. This calculation is determining the CSA value associated with the applicable trips and not the indication. Thus, RRA = + 0.000% of span (Reference 5.1)

Engineering Work Sheet Calculation Number:

C10818 Revision:

0 Addendum:

N/A Page 17 of 23 Pressurizer High Pressure RX Trip (Normal)

The Channel Uncertainty for the Pressurizer High Pressure RX Trip function for NORMAL conditions is given by the following equation:

CSA = SE + [PMA 2 + PEA 2 + (SCA + SMTE) 2 + SD 2 + SPE 2 + STE 2 + SPSE 2 + (M1 + M1MTE)2 + (M2 + M2MTE) 2 + RD 2 + RTE 2]1/2 Where: SE = 0.000% of span PMA = 0.000% of span PEA = 0.000% of span SCA = 0.250% of span SMTE = 0.391% of span SD = 0.750% of span SPE = 0.000% of span STE = 2.300% of span SPSE = 0.158% of span M1 = 0.000% of span M1MTE = 0.000% of span M2 = 0.500% of span M2MTE = 0.200% of span RD = 1.000% of span RTE = 0.500% of span

CSA = 0.0 +

[0.0 2 + 0.0 2 + (0.25 + 0.391) 2 + 0.75 2 + 0.0 2 + 2.300 2 + 0.158 2 + (0.0 + 0.0)2 + (0.50 + 0.20) 2 + 1.00 2 + 0.50 2]1/2 CSA-NORMAL (HI Press RX Trip)

= +/- 2.833% of span The Pressurizer Pressure transmitters have a calibrated span of 1700 - 2500 psig. Therefore, the CSA in process units is:

CSA -Normal (HI Press RX Trip)

= 800 psig * (+ 2.833 of span / 100% of span) = + 22.66 psig CSA -Normal (HI Press RX Trip)

= + 22.66 psig

Engineering Work Sheet Calculation Number:

C10818 Revision:

0 Addendum:

N/A Page 18 of 23 Pressurizer Low Pressure SI Initiation & High Pressure SI Unblock Uncertainty (Normal)

The Channel Uncertainty for the Pressurizer Low Pressure SI Initiation & High Pressure SI Unblock functions for NORMAL conditions is given by the following equation:

CSA = SE + [PMA 2 + PEA 2 + (SCA + SMTE) 2 + SD 2 + SPE 2 + STE 2 + SPSE 2 + (M1 + M1MTE)2 + (M4 + M4MTE) 2 + RD 2 + RTE 2]1/2 Where: SE = 0.000% of span PMA = 0.000% of span PEA = 0.000% of span SCA = 0.250% of span SMTE = 0.391% of span SD = 0.750% of span SPE = 0.000% of span STE = 2.300% of span SPSE = 0.158% of span M1 = 0.000% of span M1MTE = 0.000% of span M4 = 0.500% of span M4MTE = 0.200% of span RD = 1.000% of span RTE = 0.500% of span

CSA = 0.0 +

[0.0 2 + 0.0 2 + (0.25 + 0.391) 2 + 0.75 2 + 0.0 2 + 2.300 2 + 0.158 2 + (0.0 + 0.0)2 + (0.50 + 0.20) 2 + 1.00 2 + 0.50 2]1/2 CSA-NORMAL (SI Initiation &Unblock) = +/- 2.833% of span The Pressurizer Pressure transmitters have a calibrated span of 1700 - 2500 psig. Therefore, the CSA in process units is:

CSA -Normal (SI Initiation & Unblock)

= 800 psig * (+ 2.833 of span / 100% of span) = + 22.66 psig CSA -Normal (SI Initiation & Unblock)

= + 22.66 psig

Engineering Work Sheet Calculation Number:

C10818 Revision:

0 Addendum:

N/A Page 19 of 23 Pressurizer Low Pressure RX Trip Uncertainty (Normal)

The Channel Uncertainty for the Pressurizer Low Pressure RX Trip for NORMAL conditions is given by the following equation:

CSA = SE + [PMA 2 + PEA 2 + (SCA + SMTE) 2 + SD 2 + SPE 2 + STE 2 + SPSE 2 + (M1 + M1MTE)2 + (M2 + M2MTE) 2 + (M3 + M3MTE) 2 + RD 2 + RTE 2]1/2 Where:

SE = 0.000% of span PMA = 0.000% of span PEA = 0.000% of span SCA = 0.250% of span SMTE = 0.391% of span SD = 0.750% of span SPE = 0.000% of span STE = 2.300% of span SPSE = 0.158% of span M1 = 0.000% of span M1MTE = 0.000% of span M2 = 0.500% of span M2MTE = 0.200% of span M3 = 0.500% of span M3MTE = 0.283% of span RD = 1.000% of span RTE = 0.500% of span

CSA = 0.0 +

[0.0 2 + 0.0 2 + (0.25 + 0.391) 2 + 0.75 2 + 0.0 2 + 2.300 2 + 0.158 2 + (0.0 + 0.0)2 + (0.50 + 0.20) 2 + (0.50 + 0.283) 2 + 1.00 2 + 0.50 2]1/2 CSA-NORMAL(LO Press RX Trip)

= +/- 2.940% of span The Pressurizer Pressure transmitters have a calibrated span of 1700 - 2500 psig. Therefore, the CSA in process units is:

CSA -Normal (LO Press RX Trip)

= 800 psig * (+ 2.940 of span / 100% of span) = + 23.52 psig CSA -Normal (LO Press RX Trip)

= + 23.52 psig Engineering Work Sheet Calculation Number:

C10818 Revision:

0 Addendum:

N/A Page 20 of 23 CSA CALCULATION FOR ABNORMAL OPERATING CONDITIONS

Abnormal operating conditions have been divided into two categories. The first category considers the environment under which the loop would function during a Design Basis Event (DBE). The second category considers the environment under which the loop would function following this DBE and continuing for 120 days (POST-DBE).

CSA Calculation for DBE Environment During a DBE, elevated temperatures and pressures as well as higher radiation dose rates will exist in the containment. DBE conditions will affect the function of both the loop sensor and its associated cabling. The DBE effects are designated as the Environmental Allowance (EA) term in Equation 3. They will be accounted for in the following error components:

1. Insulation Resistance Effects (IR) - systematic errors caused by the effects of leakage currents as a function of insulation resistance.
2. Steam Pressure / Temperature Effects (SPTE) - environmental allowance caused by elevated temperatures and pressures.
3. Radiation Effects (REdbe) - bias error caused by the effects of increased radiation dose rate.

Per Reference 5.1, the EA terms that are random errors as stated by the manufacturer will be placed under the radical. Any EA term that is systematic or a bias error will be placed outside of the radical and summed with the SE term(s), if applicable. According to Reference 5.8, the SPTE and RE dbe terms are random errors. Based on Reference 5.1, the IR term is systematic and will be treated as a bias error outside of the radical.

IR = Insulation Resistance Effects

The equation used to calculate IR is taken from Reference 5.1 and is given below:

IR = [(V s - R e

  • I t) / I t (R c + R e)]
  • 100%

The equation above calculates the error in percent of reading. The equation must be modified to calculate the IR error in percent of span, where I t in the denominator will become I t'. I t' will be equal to the instrument span in mADC (i.e., 16 mADC). The revised equation used to calculate

the IR error is:

IR = [(V s - R e

  • I t) / I t' (R c + R e)]
  • 100%

Where:

IR = percentage of systematic error

V s = Loop Power Supply Voltage (i.e., 43 VDC for Foxboro/NUS power supplies. Ref. 5.20)

R e = Input Load Impedance (10 TPR)

I t = Device Output Current [(1830 psig (1) - 1700psig)/800 psig]

  • 16 mADC = 2.6 mADC I t' = Output Current Span (16 mADC)

Engineering Work Sheet Calculation Number:

C10818 Revision:

0 Addendum:

N/A Page 21 of 23 R c = IR Value of Leakage Path (1.54

  • 10 6 from Reference 5.20, Attachment 4, Page 79 of 80, term REQ)

(1) 1830 psig is the Pressurizer Low Pressure SI initiation setpoint and the point of interest.

Thus, IR = [(43 - 10
  • 0.0026) / 0.016 * (1540000 + 10)]
  • 100 % = 0.174% of span IR = 0.174% of span RE dbe = Radiation Effects RE dbe Calculation CN-LIS-01-151, Table 6-3-1(Ref. 5.22) shows that the SI initiation (S-Signal) will be completed in the first 52.5 seconds of a 2" Small Break LOCA. Reference 5.8 states a Radiation accuracy of + (0.25% of upper range limit + 0.75% of span) during the first 30 minutes. Based on this:

RE DBE = +/- [(0.25%

  • 3000 psig / 800 psig) + 0.75] % of span = 1.688% of span RE DBE = +/- 1.688% of span

SPTE = Steam Pressure / Temperature Effects SPTE The steam pressure/temperature effect for a Rosemount 1154 Series H transmitter is

+/- (2.0% URL + 0.5% Span) (Ref. 5.8) during and after exposure to a temperature/pressure profile of 420

°F, 85 psig for 3 minutes; 350

°F, 85 psig for 7 minutes; 320

°F, 75 psig for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />; 265

°F, 24 psig for 56 hours6.481481e-4 days <br />0.0156 hours <br />9.259259e-5 weeks <br />2.1308e-5 months <br />. These transmitters are located in zone L-02 which has an Accident environmental pressure/temperature profile of 293

°F, 46.0 psig (Ref 5.19).

SPTE = [(2.0%

  • 3000 psig / 800 psig) + 0.5] % of span

SPTE = +/- 8.000% of span Engineering Work Sheet Calculation Number:

C10818 Revision:

0 Addendum:

N/A Page 22 of 23 Pressurizer Low Pressure SI Initiation for DBE Conditions The Channel Uncertainty for the Pressurizer Low Pressure SI Initiation for DBE conditions is given by the following equation:

CSA = SE + IR + [PMA 2 + PEA 2 + RE DBE 2 + SPTE 2 + (SCA + SMTE) 2 + SD 2 + SPE 2 + STE 2 + SPSE 2 + (M1 + M1MTE) 2 + (M4 + M4MTE) 2 + RD 2 + RTE 2]1/2 Where:

SE = 0.000% of span IR = 0.174% of span (positive)

PMA = 0.000% of span PEA = 0.000% of span RE DBE = 1.688% of span SPTE = 8.000% of span SCA = 0.250% of span SMTE = 0.391% of span SD = 0.750% of span SPE = 0.000% of span STE = 2.300% of span SPSE = 0.158% of span M1 = 0.000% of span M1MTE = 0.000% of span M4 = 0.500% of span M4MTE = 0.200% of span RD = 1.000% of span RTE = 0.500% of span

CSA = 0.0 + 0.174 + [0.0 2 + 0.0 2 + 1.688 2 + 8.0 2 + (0.25 + 0.391) 2 + 0.75 2 + 0.0 2 + 2.300 2 + 0.158 2 + (0.0 + 0.0) 2 + (0.5 + 0.20) 2 + 1.0 2 + 0.5 2]1/2 CSA-DBE(SI Initiation) = - 8.479 to + 8.827% of span The Pressurizer Pressure transmitters have a calibrated span of 1700 - 2500 psig. Therefore, the CSA in process units is:

CSA -DBE (SI Initiation)

= 800 psig * (-8.479% of span / 100% of span) = - 67.83 psig CSA -DBE (SI Initiation)

= 800 psig * (8.827% of span / 100% of span) = 70.62 psig CSA -DBE (SI Initiation) = - 67.83 to 70.62 psig

Engineering Work Sheet Calculation Number:

C10818 Revision:

0 Addendum:

N/A Page 23 of 23

9.0 CONCLUSION

S

The results of this calculation are summarized below:

Pressurizer High Pressure RX Trip CSA-NORMAL(HI Press RX Trip) = +/- 2.833% of span = + 22.66 psig Pressurizer Low Pressure SI Initiation & High Pressure SI Unblock Uncertainty (Normal)

CSA-NORMAL(SI Initiation & Unblock)

= +/- 2.833% of span = +

22.66 psig Pressurizer Low Pressure RX Trip Uncertainty (Normal)

CSA-NORMAL(LO Press RX Trip) = +/- 2.940% of span = +

23.52 psig

Pressurizer Low Pressure SI Initiation Uncertainty (DBE)

CSA-DBE(SI Initiation DBE) = - 8.479 to + 8.827% of span = - 67.83 to 70.62 psig

Calc.No: CI0818-1 Calc.Rev: 1 Originated By: PDESOTE Reviewed By: DOzarow"'-'" Calculation C1 0818, Rev.0 Attachment 1 Page 1 01'3 Date: 7/23/98 Page 71 of 79 PRESSURIZER PRESSURE HEAD CORRECTION The sensing leg head correction for the Pressunzer Pressure Transmitters needs to be calculated due to the transmitter replacement under DCR 2846.The physical location of the transrmtters was changed due to the mounting configuration.

Head will be calculated from the center lme of the Transnutter Sensing Cell"to the center line of the Condensmg Pot.The height's of the condensmg pots were verified through field measurements and drawings.Reference dwg XK 100-2, and attached Sketch.Determine the density of the water m the Sensing leg.Assume max.contammentnormal operatmg temperature of 120 degrees F and normal operatmg pressure of 223 5 psig (2250 psia).Ref.ASME Steam Tables 1967-(table 3, subcooled)

Specific Volume 1 Density=J1=-v ft3 v=lb l=0.035955v 3 m Note: also converted ft3 to in 1 Pressure=.lb pSt".2 lD Process Span=PS:;800 psi Control Span=CS=160*m V 2.Determine Head Pressure for each Transmitter (Density)*(Height)Page 72 of82 PT-429 PT*430 PT*431 PT-449

=19.8407'Psi (11)539.8125*iil.

=19.4092'psi (J1)-540.437S*m

=19 4317'PSi (11)553 OOOO*in=19.8834'psi Calc, No: C10818-1 Calc.Rev: 1 Ori&inated By: PDESOTE Reviewed By: DOzarow Calculation C10818, Rev_0.Attachment 1'Page 201'3'r , Date: 7/23/98 Page 720f 79 3.Determine Correction Factor as a%of Process sPan (Head Pressure)I (process Span)=-%Span PT-429

=2.4801'%PT-430 PT-431 PT-449 19.4317*psi

=2429'%PS.19,8834'psi

=2.4854-%PS 4.Determine the 0%and 100%Calibration Points using%of PS Correction Factor Note: Head pres1;ure adds to process pressure during normal opemtion therefore needs to be subtmcted from the CS at time of calibration.(CS min)M (%Span*CS)=0%CalJ'bmtion Point (CS max)*(%Span*CS)=100%Calibmtion Pornt PT-429 (4().mV)-(2.4801'%'CS)=36.0318-mV (200-mV)-(2.4801'%'CS)=196.0318-mV PT-430 (4().wV)-(2.4261'%'CS)=36.1182-mV (200-mV)-(2.4261*%'CS)=196.1182 tmV PT-431 PT-449 (4().mV)-(2.429-%'CS);::36.1136

'wV (200mV)-(2.429*%*CS)

=196.1136 t mV (4().mV)-(2.4854-%*CS)=36.0234'mV (200-mV)-(2.4854'%'CS)=196.0234*mV Page 73 of82-11-;'$17-7%

Calc.No: C10818-1 Calc.Rev:'1 Originated By: PDESOTE Reviewed By: DOzarow Calculation C1 0818, Rev.0 Attachment 1.Page 3 of 3 Date: 7/23/98 Page 73 of 79 Pressurizer Pressure Transmitter Sensing Leg Height's PRESSURIZER 2691/2"*(2695")649'6" Level Totel Hood PT 429'" 551 8125" PT 430'" 6398125" PT 431'" 5404375" PT 449'" 553 0000" 626'Level 2093110" (209187S"'

1905/16 1973110" f'96312S"1 (197 1875")2091(2"{209S", Page 74 of82 3013/10" 4311/10" 4213/10" 301/2" (30 il125"))(436il7S")

(428125"1 1305")I III 606'Level_-----.l Theee demel'l!!'ons were derived from Dwg XK 100-2 all other m8aOUremenu.

were elth..me$$urtld or derived from actual meesurements 50.59 APPLICABILITY REVIEW Calculation C1 0818, Rev.0 Attachment 2*Page 1 of 1 1.2.3.(Is the activity excluded from 50.59 review?)Document/Activity number:_C_l_08_1_8,..:..'

_R_eVl_*_si_o_n_O

---Brief description of proposed activity (what is being changed and why): This calculation supersedes calculation CI0818-1,Revision 2, CI0818-2, Revision 1, CI0818-3, Revision 1, and CI0818-4, Revision 1.Calculation Cl0818, Rev.0 develops the Channel Statistical Allowance (CSA)values associated with the Kewaunee Pressurizer Pressure Low and High Pressure Reactor Trip, Low Pressure Safety Injection and the Safety Injection Unblock functions.

This calculation supports the conversion to Improved Technical Specifications.

Does the proposed activity involve or change any of thefollowingdocuments or processes?

Check YES or NO for EACH applicability review item.Explain in comments if necessary.

[Ref.USA 50.59 Resource Manual}NOTE: If you are unsure if a document or process may be affected, contact the process owner.Yes No Document or Applicable Contact!Action.././Process Regulation a 0 f81 Technical Specifications or Operating License lOCFR50.92 Process change per LI-AA-I01.

Contact Licensing.

Activity/change previously approved by NRC in Identify NRC letter in comments below.Process b 0 r81 10CFR50.90 change.license amendment or NRC SER Contact Licensing for assistance.

c DActivity/change covered by an existing approved lOCFR50 AppendixB Identify screening or evaluation in comments below.lOCFRSO.59 review, screening, or evaluation.

Process change.d 0Dominion Quality Assurance Program Description lOCFR50.54(a)

ContactQA.(DOM..QA-l)Refer to NO-AA-IOl.

0EmergencyPlan lOCFRSO.54(q)

ContactEP.

e Refer to FP-R-EP-02.f 0Security Plan lOCFR50.54(p)

Contact Security.Refer to FP-S-SPE-01.

g 0 rgJ 1ST Plan lOCFR50.55a(f)

Contact 1ST process owner.Refer to ER-AA-IST-IO.

h 0lSI Plan 10CFR50.55a(g)

Contact lSI process owner.Refer to ER-AA-NDE-122, NAn-01.05, and NAD-05.ll.

i 0BCCS Acceptance Criteria lOCFRSO.46 Contact Licensing.

USAR or any document incorporated by reference-Process USAR change per NEP-05.02.

j 0Check YES only if change is editorial (see lOCFR50.71 Attachment A).Contact USAR process owner for assistance.

Commitment

-Commitment changes associated Contact Licensing.

k 0with a response to Generic Letters and Bulletins t or 1 o CFR5 0 Appendix B Refer to LI-AA-I10.

if described in the USAR require a pre-screening.

Maintenance activity or new/revised maintenance Evaluate under Maintenance Rule.1 0procedure-Check YES only if clearly maintenance lOCFR50.65 Refer to ER-AA..MRL-IO, ER-AA-MRL-IOO, and and equipment will be restored to its as-designed NAD-08.21.

condition within 90 days (see Attachment C).New/revised administrative or managerial directive/procedure (e.g., NAD, GNP, Fleet m DProcedure) or a change to any procedure or other 10CFR50 Appendix B Process procedure/document revision.controlled document (e.g., plant drawing)which is clearly editorial/administrative.

See Attachments A andB.n 0Fire Plan lOCFR50.48 Fire Protection Program Document Change Control, GNP-05.30.01.

0 0Independent Spent Fuel Storage Installation (ISFSI)lOCFR72,48 Implement DNAP-3004, starting with Applicability.

Page 15 of 16 Date:........1_o+-./...:....,IYF-f/_Z_O_O_i

__/0 IN/O 9 Date: Date: APR 08 2008 Andrew W.Baugus J.D.Desrochers Conclusion.

Check one of the following:All documents/processes listed above are checked NO.lOCFR50.59 applies to the proposed activity.A 50.59 pre-screening shall be performed.

o One or more of the documents/processes listed above are checked YES, AND controls all aspects of the proposed activity.10CFR50.59 does NOT apply.Process the change under the applicable program/process/procedure.

o One or more of the documents/processes listed above are checked YES, however, some portion of the proposed activity is not controlled by any of the above processes.

lOCFRSO.59 applies to that portion.A 50.59 pre-screening shall be performed.

Comments: ET-CEE-Q9-0009, Rev.0 will transmit the 50.59/72.48 Evaluation and program/document updates Print name followed by signature.

Attach completed for to documentlacti vity/change package.4.6.5.Form GNP-04.04.01-1 Rev.12 Prepared by: (print/sign)

Reviewed by: (print/sign)

INFORMATION USE 50.59 PRE-SCREENING Calculation C10818, Rev.0 (Is a 50.59 screening required?)

Attachment 3 1.Document/Activity number: Cl0818, Revision 0 Page 1 of 1 2.Brief description of proposed activity (what is being changed and why): This calculation supersedes calculation Cl0818-1,Revision 2, Cl0818-2, Revision 1, CI0818-3, Revision 1, and CI0818-4, Revision 1.Calculation Cl0818, Rev.0 develops the Channel StatisticalAllowance(CSA) values associated with the Kewaunee Pressurizer Pressure Low and High Pressure Reactor Trip, Low Pressure Safety Injection and the Safety Injection Unblock functions.

This calculation supports the conversion to Improved Technical Specifications.

3.Does the proposed activity involve or change any of the following documents or processes?

Explain in Comments if necessary.

Check YES or NO for EACH item.(Ref.USA 50.59 Resource Manual]NOTE: If you are unsure if a document or process may be affected, contact the process owner.NOTE: An asterisk (*)indicates that the document is incorporated by reference in the USAR or is implicitly considered part of the USAR.NOTE: Check NO if activity/change is considered editorial) administrative, or maintenance as defined in Attachments A, B, and C.Explain in Comments if necessary.

Yes ,/No ,/Docwnent/Process Directive!

Procedure a 0Updated Safety Analysis Report (USAR)NEP-05.02 b 0*Technical Specifications Bases or Technical Requirements Manual (TRM)U-AA-IOl, LI-AA-IOl-1OOl c 0*Conunitments made in response to NRC Generic Letters and Bulletins, and those described in the USAR LI-AA-110 d 0*Environmental Qualification (EQ)Plan NAD-01.08 e 0*Regulatory Guide 1.97 (RG 1.97)Accident Monitoring Instrumentation Plan NAD-05.22 f 0*Fire Plan NAD-01.02 g 0 I2S1*Appendix R Design Description NAD-Ol.02 h 0*Fire Protection Program Analysis (FPP A)NAD-Ol.02 i D*Offsite Dose Calculation Manual (ODCM)NAD-05.13 j 0*Radiological Environmental Monitoring Manual (REMM)NAD-05.l3 k D*Station BlackoutDesignDescription 1 0*Control Room Habitability Study 0Plant Drawing ChangesIDiscrepancies-Check YES only if: 1)the change adds information to, deletes information m from, or alters the configuration of a drawing that is incorporated in the DSAR, or 2)configures an SSC NAn-05.0t differently than described or credited in USAR text.n 0CalculationslEvaluations!

Analyses/Computer Software-Check YES only if: 1)It affects a method of evaluation Various described in the USAR, or 2)It independently (i.e., not part of a modification) affects the licensing or design basis.0 0Permanent Plant Physical Changes..All require a screening.

NAD-04.03 p 0Temporary Plant Physical Changes (TCRs)-Check No only if installed for maintenance AND in effect for less than 90 days at power conditions.

q 0QA Typing Determinations

-Check YES only if reduction in classification, or affects design function as described inUSAR.r 0Setpoint or Acceptance Criteria..Check YES only if change affects plant monitoring, performance, or operation.

Various s 0Plant Procedures/Revisions

-Check YES only if the change directly or indirectly involves operating, controlling NAD-03.01 or configuring an sse differently than described or credited in USAR.t DEngineering Specifications

..Check YES only if a design function or design requirement may be affected.NAD-05.03 u 0Operations Night Orders or Operator Work Arounds-Check YES only if S SCs are operated or configured GNp-03.30.0l differently than described in USAR.NAD-08.14 t v 0Temporary plant alterations (e.g.t jumpers, scaffolding.

shielding, barriers)-Check YES only if installed (or in GMP-127, effect)for maintenance for longer than 90 days at power conditions.

GNP-Ol.23.04, FPP-08-09 w 0Temporary plant alterations

-Check YES only if not associated with maintenance.

x 0Corrective/Compensatory Actions-Check YES only if degraded/non-conforming plant condition accepted"as-is" OP-AA-I02 or compensatory action taken.Page 16 of 16 Date: Date: Date: APR 08 2008 INFORMATION USE J.D.Desrochers Form GNP-04.04.01-2 Rev.12 4 Conclusion.

Check one of the following:All of the documents or processes listed above are checked NO.A 50.59 screening is NOT required.Process change in accordance with the applicable program/process/procedure.

o One or more of the documents or processes listed above are checked YES.A 50.59 screening shall be performed.

5 Comments: ET-CEE-09-0009, Rev.0 will transmit the 50.59/72.48 Evaluation and program/document updates.6 Print name followed by signature.

Either the preparer or reviewe shall be 50.59 qualified.

Attach completed form to document/activity/change package.r--:::>Prepared by: Andrew W.Baugus'b (print/sign)

Reviewed by: (print/sign)